1 1 Presentation to Portfolio Committee on Water and Environmental Affairs Support Provided to Local Government Presented By Regional Head: Mr Alson Matukane Limpopo 09 SEPTEMBER 2009

Upload: phungnga

Post on 11-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

11

Presentation to Portfolio Committee on Water and

Environmental Affairs

Support Provided to Local Government

Presented By Regional Head: Mr Alson Matukane

Limpopo

09 SEPTEMBER 2009

Page 2: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

22

CONTENTS

• INTRODUCTION• OVERVIEW OF PAST ACHIEVEMENTS

Water Source DevelopmentBulk InfrastructureReticulation Scheme Operations Capacity Building

• DWA INSTITUTIONS IN WATER SERVICE PROVISION• OVERVIEW OF DWA’S PLANNED INTERVENTIONS• HIGH LEVEL CHALLENGES AND POSSIBLE

INTERVENTIONS• FOCUS FOR 09/10

Page 3: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

33

INTRODUCTION• The Limpopo Province covers an area of 123 910km2. • It has a total population of about 5.4 million people (2001) and it

contributes approximately 6.5% pf the National GDP (2002). • It is a predominantly rural province with low population density. • It is faced with huge service delivery backlogs. • It also has a problem of unequal and ‘pocket” development with large

disparities between its urban and rural sections: Gini Coefficient =• 0.60 (1998) and 0.63 (2003) i.e. inequality increased.• Human Development Index (HDI) = 0.46 (1998) and 0.49 (2003) i.e.

development increased • Characterized by insufficient bulk infrastructure, thus impacting on the

eradication of the water services backlog. • The province is faced with a sanitation backlog of 600 000 hh• The water backlog stands at 55 000 hh

Page 4: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

4

ACRONYMS• CDW- Community Development Workers• CDM- Capricon District Municipality• MDM- Mopani District Municipality• GDSM- Greater Sekhukhune District Municipality• VDM- Vhembe District Municipality• COLLACOM- Collaboration Committee• DLGH- Department of Local Government and Housing• WSA- Water Services Authority• PSP- Professional Service Provider• SLA- Service Level Agreement

Page 5: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

5

ACRONYMS Cont…• DORA- Division of Revenue Act• IA- Implementing Agent• H&H- Health and Hygiene• hh- Households• LP- Limpopo• TAC- Technical Assistance Consultancy• MSP- Municipal Support Plan• PEP- Project Execution Plan• IDP- Integrated Development Plan

Page 6: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6

ACRONYMS Cont…

• WSDP- Water Services Development Plan• DoE- Department of Education• GM- Gender Mainstreaming• LM- Local Municipality• DM- District Municipality

Page 7: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

77

INTRODUCTIONWater Services in Limpopo• 5 District Municipalities and 24 Local Municipalities• 4 District Municipalities and 7 Local Municipalities are

Water Services Authorities (a Total of 11No. WSAs)• 2 Water Boards (Lepelle & Magalies) and one

Section 21 company provide both bulk and retail services to municipalities

• WSA in the process of finalizing Section 78 assessments

• Province highly dependant on ground water

Page 8: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

88

Water Services AuthoritiesDistrict Municipality Local Municipalities Water Services Authorities

Capricorn AganangBloubergLepelle-NkumpiMolemolePolokwane

Polokwane LMCapricorn DM

Mopani Ba PhalaborwaGreater GiyaniGreater LetabaGreater TzaneenMaruleng

Mopani DM

Greater Sekhukhune Elias MotsoalediFeta-KgomoGreater TubatseMarble Hall

Greater Sekhukhune DM

Vhembe MakhadoMusinaMutaleThulamela

Vhembe DM

Waterberg Bela BelaLephalaleModimolleMogalakwenaMookgophongThabazimbi

All Local Municipalities

Page 9: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

99

What gets water into taps?WATER RESOURCES

MANAGEMENT •Surface water resource assessment & monitoring

•Groundwater resource assessment & monitoring •Analysis and planning

•Water quality management

•Allocation and Licensing•Information management

and analysis •Establishment and strengthening of institutions

WATER RESOURCES MANAGEMENT•Surface water resource assessment & monitoring

•Groundwater resource assessment & monitoring•Analysis and planning

•Water quality management

•Allocation and Licensing•Information management

and analysis•Establishment and strengthening of institutions

INFRASTRUCTURE DEVELOPMENT •Statistics: demographics, future demand

•Planning •Feasibility Studies

•Design •Construction

•Establishment and strengthening of institutions

(“Infrastructure” includes dams, weirs, raw water bulk, regional bulk, distribution, reticulation, collection, treatment systems)

INFRASTRUCTURE DEVELOPMENT •Statistics: demographics, future demand

•Planning •Feasibility Studies

•Design •Construction

•Establishment and strengthening of institutions

(“Infrastructure” includes dams, weirs, raw water bulk, regional bulk, distribution, reticulation, collection, treatment systems)

WATER SYSTEMS OPERATIONS •Raw water bulk operations

•Regional Bulk operations•Distribution operations•Reticulation operations

•Water quality management •Commercial

management: tariffs, billing, collection •Establishment and strengthening of institutions

WATER SYSTEMS OPERATIONS•Raw water bulk operations

•Regional Bulk operations•Distribution operations•Reticulation operations

•Water quality management•Commercial

management: tariffs, billing, collection•Establishment and strengthening of institutions

Page 10: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1010

ACHIEVEMENTS: Source Development

• One of the achievements was the establishment of four(4) Water Management Areas (WMAs):

Limpopo (WMA 1)Levhubu-Letaba (WMA 2)Crocodile (West) Marico (WMA 3)Olifants (WMA 4)

Page 11: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1111

Page 12: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1212

NORTHERN OPERATIONS ORGANISATIONAL STRUCTURESSUB AREANZHELELE

NWANEDI/LUPEPHEGWS

MUTSHEDZIDAM

Non National2.161*10^6 m^3

D & I

NZHELELE DAMNon National

51.234*10^6 m^3Agriculture +

Small supply to Aventura

NWANEDI & LUPHEPHEDAMS

Non Nationa11.044*10^6 m^3Agriculture +D & I

CROSS DAMNon Nationa

1.805*10^6 m^3lAgriculture

Page 13: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1313

NORTHERN OPERATIONS ORGANISATIONAL STRUCTURES

SUB AREALUVUVHU

ALBASINIDAM

National28.261*10^6 m^3

D & I +Agriculture

TSHAKHUMADAM

Non National3.935*10^6 m^3

D & I +Agriculture

NANDONIDAM

National163.0*10^6 m^3

D & IAgriculture

VONDODAM

National30.173*10^6 m^3

D & I +Agriculture

PHIPHIDIDAM

Non National0.187*10^6 m^3

D & I +Agriculture

Page 14: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1414

NORTHERN OPERATIONS ORGANISATIONAL STRUCTURES

SUB AREALUVUVHUContinue

MALAMULELEWEIR

Non NationalD & I

XIKUNDUWEIR

Non NationalD & I

DUTHUNIDAM

Non NationalAgriculture

DAMANIDAM

National12.758*10^6 m^3

D & I +Agriculture

MUTALEWEIR

Non NationalD & I

Page 15: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1515

NORTHERN OPERATIONS ORGANISATIONAL STRUCTURES

SUB AREALETABA

EBENEZERDAM

National69.139*10^6 M^3

D & I +Agriculture

TZANEENDAM

National156.541*10^6 m^3

D & I +Agriculture

MAGOEBASKLOOFDAM

National4.915*10^6 m^3

D & I +Agriculture

THABINADAM

Non National3.390*10^6 m^3

D & I

THAPANIDAM

Non National1.328*10^6 m^3

D & I

NONDWENIWEIR

NationalD & I +

Agriculture

VERGELEGENBALANCING DAM

Non National0.253*10^6 m^3

D & I +Agriculture

Page 16: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1616

NORTHERN OPERATIONS ORGANISATIONAL STRUCTURES

SUB AREALETABAContinue

MODJADJIDAM

7.402*10^6 m^3Non National

D & I

MIDDLE LETABADAM

National171.953*10^6 m^3

D & I +Agriculture

NSAMIDAM

National21.870*10^6 m^3

D & I +Agriculture

MAHONISIDAM

Non NationalD & I

MAKULEKEDAM

Non National11.401*10^6 m^3

Agriculture

Page 17: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1717

ACHIEVEMENTS: Source Development - Summary

• Since 1994 R4.7billion has been spent on new dams/weirs to store additional water

• Dams CompletedModjadji Dam (Mopani)Nondweni Weir (Mopani)Xikundu Weir (Vhembe)Nandoni Dam (Vhembe – also supplies Mopani & Capricorn)Flag Boshielo (Sekhukhune) – Raising of dam wallMokolo Dam (Waterberg) – Raising of dam wall

• New Dams Under ConstructionDe Hoop (Greater Sekhukhune – also supplies Mogalakwena & Capricorn WSAs)

• New Planned DamsNwamitwa Dam (Mopani)Glen Alpine Dam (Capricorn) – Raising of Dam wall

Page 18: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1818

ACHIEVEMENTS: Source Development – Groundwater

• Limpopo Ground Water potential (Drainage Areas A and B) 940 million cubic metres (million m3) per year (equivalent to the annual design yield of Vaal Dam 941 million m3 per year)

• Current groundwater use is 462 million m3 per year (see next slide)

• Approx 9 000 boreholes drilled (4 500 since 1994). Estimated 5 000 still functioning

• Water quality problems – groundwater requires treatment

• Recharge of groundwater reliant on rainfall – therefore it requires good management to avoid depletion through over-pumping

Page 19: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

1919

USE MILLION M3/ANNUM

% OF TOTAL USE

IRRIGATION 275 (50 580 ha)

60

LIVESTOCK 8 2 RURAL COMMUNITIES

117 25

MUNICIPALITIES 30 6 MINING 32 7 TOTAL 462 100

ACHIEVEMENTS: Source Development – Groundwater

Page 20: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2020

Polokwane Route

2

4

6

8

10

12

14

16

Apr

-72

Apr

-73

Apr

-74

Apr

-75

Apr

-76

Apr

-77

Apr

-78

Apr

-79

Apr

-80

Apr

-81

Apr

-82

Apr

-83

Apr

-84

Apr

-85

Apr

-86

Apr

-87

Apr

-88

Apr

-89

Apr

-90

Apr

-91

Apr

-92

Apr

-93

Apr

-94

Apr

-95

Apr

-96

Apr

-97

Apr

-98

Apr

-99

Apr

-00

Apr

-01

Apr

-02

Apr

-03

Apr

-04

Apr

-05

Apr

-06

Apr

-07

Apr

-08

Apr

-09

Apr

-10

Time interval (month)

Gro

un

dw

ate

r le

vel (m

)

A7N0549SLoop-_farm

Groundwater level time serie of station A7N549 (Sterkloop Farm )

Page 21: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2121

ACHIEVEMENTS: Bulk Infrastructure

• Due to water scarcity and uneven rainfall patterns (see next slide), Limpopo requires on water transfers over large distances

• Major Schemes DevelopedOlifants-Sands (Link Flag Boshielo to Polokwane)Lebalelo (Link Sekhukhune to Olifants River)Levhubu Government Water Scheme (Link Vhembe to Xikundu Weir)Silwane-Nondweni (Link Giyani Scheme to Nondweni Weir)

Page 22: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

222222

ACHIEVEMENTS: Bulk Infrastructure (Ongoing Planning)

Project Name Project No.

Allocation07/08(RM)

Allocation08/09(RM)

Allocation09/10(RM)

Botlokwa RWS (Molemole LM Surface Water Augmentation Options) Reconnaissance Study in process (Capricorn)

LPR 001 1,000,000 1,400,000 600,000

Nzhelele RWS (Vhembe) LPR 002 750,000 500,000 500,000

Lephalale Bulk Water Augmentation (Eskom) (Waterberg DM, Lephalale LM) LPR 003 1,000,000 1,800,000 1,900,000

Magalies Water to Waterberg (Waterberg DM) LPR 004 800,000 1,318,000 700,000

Makhado West (Sinthumule Kutama) (Vhembe) LPR 005 1,000,000 1,244,000 1,900,000

Nwamitwa RWS (Great Letaba) (Mopani) - In process LPR 006 1,500,000 700,000 620,000

Ohrigstad (Gr. Sekhukhune) LPR 007 500,000 750,000 190,000

Glen Alpine RWS (Waterberg DM, Mogalakwena LM) LPR 008 1,000,000 500,000 900,000

Lebalelo Central & North (Gr. Sekhukhune) LPR 009 1,000,000 1,400,000 500,000

8,550,000 9,612,000 7,810,000

Page 23: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2323

ACHIEVEMENTS: Bulk Infrastructure (Ongoing Implementation.)

Scheme Name DWAF Ref. District Municipality

2007/2008 2008/2009 2009/2010

Allocated Allocated Allocated

Groblersdal Lukau BWS LPR010 Greater Sekhukhune R 9,300,000 R 19,000,000 R 13,000,000

Nebo BWS LPR011 Greater Sekhukhune R 6,500,000 R 25,000,000 R 35,000,000

Mooihoek/Tubatse BWS LPR012 Greater Sekhukhune R 5,000,000 R 24,000,000 R 25,000,000

Specon BWS LPR013 Capricorn R 8,500,000 R 13,000,000 R 18,000,000

Olifantspoort BWS LPR014 Capricorn R 14,000,000 R 20,000,000 R 22,000,000

Mogalakwena BWS LPR015 Waterberg R 19,000,000 R 20,000,000 R 28,500,000

Sinthumule Kutama BWS LPR016 Vhembe R 5,000,000 R 15,000,000 R 15,000,000

Mametja Sekororo LPR017 Mopani R 5,000,000 R 10,000,000

R 72,300,000 R 146,000,000 R 156,500,000

Page 24: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2424

ACHIEVEMENTS: Water Services (Reticulation)

Municipality / WSA

Total Households

Households Served

(As at End of 07/08)

Households Served

(As at End of 08/09)

Vhembe DM 294,542 229,779 230,818Mopani DM 265,370 224,408 227,742Polokwane 140,896 70,877 72,182Capricorn DM 158,884 129,214 129,214Sekhukhune DM 215,936 110,818 112,796Belabela 13,822 13,822 13,822Lephalale 26,181 22,826 22,826Modimolle 20,730 18,138 18,138Mogalakwena 75,638 57,175 58,585Mookgophong 8,821 8,199 8,199Thabazimbi 22,677 20,510 20,840

Waterberg DM 167,869 140,670 142,410

TOTAL PROVINCE 1,243,497 905,766 915,162

Page 25: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2525

ACHIEVEMENTS: Water Services (Reticulation)

• Water supply to 956 schools was completed (2004 – 2009). Included drilling and equipping boreholes, storage tank, pipework, stand pipe

• Water supply backlog to all clinics eradicated in 2008

Page 26: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2626

ACHIEVEMENTS: Scheme Operations - Transfer of Personnel

WSA TRANSFERRED STAFF

SECONDED STAFF DATE

CAPRICON DM 347 186 1 MARCH 2007

LEPHALALE LM 37 07 1 APRIL 2005 (3 year period lapsed)

MOGALAKWENA LM 127 38 1 JANUARY 2007

VHEMBE DM 1175 855 1 OCTOBER 2007

GREATER SEKHUKHUNE DM 398 191 1 OCTOBER 2007

MOPANI DM 0 888 DECEMBER 2008

POLOKWANE LM 0 167 SEPTEMBER 2009

TOTAL 3163 2268

Page 27: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2727

ACHIEVEMENTS: Scheme Operations -

Transfer of Water SchemesWSA NO OF SCHEME TRANSFERRED SCHEME OVER R100M

CDM 14 14 NilLephalale LM 3 3 NilMogalakwena LM

14 14 Nil

MDM 8 6 2VDM 23 20 3GSDM 11 9 2Polokwane LM 5 5 NilTotal 78 71 7

Page 28: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2828

ACHIEVEMENTS: Scheme Operations - Transfer of Water Schemes:

Estimated value

External Bulk R15 BilInternal Bulk R9 BilReticulation R8.4 BilLocal Sources R5.4 BilWater treatment Works R1.482 Bil

TOTAL R39.282 BIL

Page 29: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

2929

ACHIEVEMENTS: Scheme Operations - Transfer of Sewage Works

WSA NO OF SCHEME TRANSFERRED

CDM 2 2Lephalale LM 1 1Mogalakwena LM 5 5

MDM 12 12VDM 11 11GSDM 7 7Polokwane LM 2 2Bela-bela LM 0 0Total 40 40

Page 30: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3030

ACHIEVEMENTS: Scheme Operations –

Budgetary Support• Operation of dams: R53million (Financial years:

07/08, 08/09, 09/10)

• Water Services Subsidies (09/10, 10/11, 11/12) (see next slide)

DORA Schedule 6: approx. R903millionDORA Schedule 7: approx. R480millionRefurbishment: R327million

Page 31: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3131

Budget SupportWSA

2009/2010 2010/2011 2011/2012

Refurb Sch 6 Sch 7 Total Refurb Sch 6 Total Refurb Sch 6 Total

'000 '000 '001 '000 '000 '000 '000 '000 000 '000

Mopani 10,000 80,361 44,747 135,108 45,624 82,953 128,577 15,000 58,913 68,913

Vhembe 20,000 134,257 65,945 220,202 62,825 100,118 162,943 15,000 71,104 86,104

Capricorn 19,000 62,676 20,780 102,456 39,269 45,353 84,622 1,000 32,210 33,210

Polokwane 9,837 17,660 6,425 33,922 1,557 17,861 19,418 5,000 12,685 17,685

Lephalale 6,493 7,297 - 13,790 - 5,388 5,388 - 3,827 3,827

Mogala-kwena 6,364 20,896 6,926 34,186 - 15,171 15,171 4,000 10,774 14,774

Sekhukhune 10,000 55,115 19,335 84,450 36,116 39,983 76,099 20,000 28,395 48,395

Bela-Bela 465 259 - 724 184 184 130 130

Total 82,159 378,521 164,158 624,838 185,391 307,011 492,402 60,000 218,038 273,038

Page 32: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3232

ACHIEVEMENTS: Scheme Operations – “After-care” Support to LG

• DWA assistance on HR issues• Technical Assistance to conduct S78

assessments• Development and implementation of

Municipal Support Plans – in association with DPLG/DLGH

• Establishment of support/regulation units in DWA districts

Page 33: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3333

ACHIEVEMENTS: Scheme Operations –

Disaster Management: Anti-Cholera • Activation of disaster management structures• Water quality testing• Carting of water (through water tanks) and

deployment of mobile water treatment (package) plants

• Sanitation facilities and washing materials• Public awareness• International liaison with cross-border

authorities to limit cross-border spread of disease

Page 34: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3434

ACHIEVEMENTS: Scheme Operations –

Disaster Management: Drought e.g. Middle-Letaba/Giyani

• Assistance with reactivation of boreholes

• Scheme operations to optimise water use

• Enforcement of water conservation measures

Page 35: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3535

MIDDLE LETABA

Page 36: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3636

ACHIEVEMENTS: Scheme Operations –

“Hot-spots” Identification• Utilisation of DWA Community

Development Officers to identify areas of critical shortage

• Assistance to CDWs in community liaison

• Budget preparation• Deployment of mobile water treatment

(package) plants where necessary

Page 37: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

3737

ACHIEVEMENTS: Capacity-Building/Strengthening Local Government

Functional Area Nature of Support Achievements Benefiting Authority

Water Sector Support

Financial and collaboration of the water sector

Functional collaborative structure (COLLACOM) and its task teams

SALGA, Co- operative Governance (DLGH ) and WSAs

WSA Support Financial support to build internal capacity of the WSAs

Systems and programmes in place the enable WSAs to perform their functions

All 11 WSAs in Limpopo (6 in Waterberg, Capricorn DM, Vhembe DM, Sekhukhune DM, Polokwane LM and Mopani DM)

Page 38: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

383838

SUB-PROGRAMMES1. Section 782. WSA Support3. Sustainability Pillars

Gender Mainstreaming Appropriate TechnologyCivil SocietyEnvironmental ManagementHealth and HygieneHIV/AIDS

4. Planning

ACHIEVEMENTS: Capacity- Building/Strengthening Local

Government

Page 39: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

393939

SECTION 78• Targets

- 11 WSAs’ Sec 78 recommendations implemented in all WSAs• Achievements

CDM Service Level Agreements (SLAs) signed with its Locals. Business plans developed for all LMs & budget allocated to each. GSDM signed with 3 LMs (Tubatse, Marble Hall & Elias Motsoaledi and 5 year contract signed with Lepelle Water Board.VDM signed with all LMsMDM signed with Greater Tzaneen, Professional Service Provider (PSP) appointed to facilitate the establishment of the entity. Organogramsfinalized for Tzaneen & Ba Phalaborwa and manloading completed. Modimolle Sec 78 has been completed and council resolution obtained.

39

Page 40: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

404040

SECTION 78 CONTINUE…• Challenges

Lack of capacity within the municipalities ( Bela-Bela and Mookgopong)Agreement not signed between MDM and Ba-Phalaborwa (Reticulation)Agreement not signed between Lepelle and MDM (Bulk)

• Possible SolutionsContinued bilateral meetings to ensure the completion of the process. Advice the WSAs to start implementing the decisions (Bela-Bela and Mookgophong)

Engage Sector partners to raise the capacity issue within Bela-Bela and Mookgophong.Engage sector partners for MDM and Ba-Phalaborwa

40

Page 41: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

414141

WSA SUPPORT

• Targets

Provision of hands on support to 11 WSAs in the implementation of Capacity building programme

Municipal Support Plans developed for all 11 WSAs

41

Page 42: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

424242

WSA SUPPORT CONTINUE• Achievements

CapricornSection 80 S 78 assessment reports finalized. Organogram for the LMs finalizedSLA signed with the LMs

LephalaleMunicipal Support Plan available.Successful implementation of the Capacity building programme

MopaniWater Conservation and Demand Management strategy developedSkills audit finalized for Ba-Phalaborwa and Greater Tzaneen LMDrinking water quality status quo report available

.42

Page 43: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

4343

WSA SUPPORT CONTINUE

Sekhukhunecost recovery strategy completed in 5 villages, Assessment of 170 boreholes in Fetakgomo completed. Establishment of a Water Division within the MunicipalityCustomer Care services is in place

ThabazimbiMunicipal support plan in placeCustomer care services is in place

43

Page 44: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

444444

WSA SUPPORT CONT…

• Challenges- Lack of funding to support the review of MSPs- Mookgophong, Polokwane & MSPs not yet developed.- Bela-Bela, Modimolle, Lephalale , Mookgopong, Mogalakwena and

Vhembe DM not yet started with the review process.- National framework developed very late.- Continuous change of processes. - Insufficient funds to review and align with national framework.

44

Page 45: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

454545

WSA SUPPORT CONT…

• Proposed solutions- Secure additional funds/ reprioritize funding for

MSPs reviewal.- Accelerate the development of the MSPs for

Polokwane & Mookgophong- Bilateral discussion to ensure development of the

MSP- access additional funding for review and align with

the National Framework

45

Page 46: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

464646

WSA CHECKLIST

• Targets- Compile status quo of legislative compliance of all

the 11 WSAs

• AchievementsBooklets available and distributed to Districts Successfully engaged the WSAs to interrogate the outcomes of the process.Integration of the capacity gaps into the new municipal support plans

46

Page 47: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

474747

MOBILISATION OF SUPPORT• Targets

- 6 COLLACOM and 6 PMUs meetings. • Achievements

Functional COLLACOM and its Task teams: Provincial Sanitation Task Team (PSTT), Programme Management Unit (PMU), District Sanitation TTs and other forums are in place 5 COLLACOM and 5 PMU functional and feeding into the higher level (premier mayor’s forum)

• ChallengeFunds to implement the recommendations from COLLACOM Lack of participation of WSAs at COLLACOM

• Proposed solutionRequested additional funds to support the sector to implement the resolutionsEngage Sector partners to encourage WSAs attendance

47

Page 48: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

484848

SUSTAINABILITY PILLARS: GENDER MAINSTREAMING

• Target- Develop gender mainstreaming systems in 11 WSA's

• AchievementsService provider appointed & PEP developed. Gender focal persons identified & IDP Toolkits training. Projects identified for mainstreaming purposes, project visits & project gender analysis is on. GM strategy developed for GSDM

48

Page 49: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

494949

GENDER CONT…

• ChallengesPolicies & plans for individual WSAs not developedNo dedicated person from water services division to attend to gender issuesTechnical reports are silent on gender issues & hence mainstreaming is a challenge Projects chosen are in the construction phase & changing status quo is difficult

• Proposed SolutionsTo try & influence the technical report format to accommodate gender issues Engage LG on issues relating to policies and plans in each WSAs

Page 50: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

505050

APPROPRIATE TECHNOLOGY

• Target - 11 WSAs to be trained on appropriate technology

• AchievementsWorkshop & expo held on the 17/10/2008 at Meropa & 10 WSAs attended

• Challenges- None

50

Page 51: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

515151

CIVIL SOCIETY• Targets

- Support 5 Civil Society Organisations (CSOs) to implement projects

• AchievementsPEP developed & Approved, & IA appointedBriefing on strategy done in GSDMInvestigation on in Nkowa-Nkowa regarding water leakages. 10 Rainwater tanks completed in Jane FurseConsultation done in Blouberg LM and the community regarding H&H awareness

ChallengeSlow progress in the implementation.

• Proposed solution- Fast track Process

51

Page 52: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

525252

ENVIRONMENTAL MANAGEMENT• Target

Conduct environmental status and develop plans in WSAs

• AchievementsTraining of WSA officials conducted

• ChallengeInsufficient budget. Activities for 2008/9 not implemented

• Proposed solutionEnsure availability of budget

52

Page 53: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

535353

HEALTH AND HYGIENE (H&H)

• TargetH&H awareness to be conducted in 22 villages

• AchievementsDeveloped PEP and PSP appointedH&H awareness conducted & promotional materials provided in all cholera affected areas within 5 districts (21 farms & villages)

Page 54: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

545454

Health & Hygiene CONT….

• ChallengesH&H awareness not conducted in all areas identified in the initial plans due to cholera outbreak

• Proposed SolutionsTo continue with the implementation of the plan for 09/10 Financial Year

Page 55: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

555555

HIV/AIDS

• TargetsMainstream HIV/Aids in Water and sanitation projects

• AchievementsNone

• ChallengesNo budget allocated for the project.

• Proposed SolutionsReallocation of budget.

Page 56: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

5656

Funded ProgrammeLP No Project Name Allocations Expenditure BalanceLP 140 Capricorn & PLK R1 250 000 R 1 631 463 -R381 463

LP 141 Waterberg R7 100 000 R4 383 401 R2 716 599

LP 142 Vhembe DM R1 500 000 R 542 711 R 957 289

LP 143 Mopani DM R 1 000 000 R 910 891 R 89 109

LP 145 GSDM R1 500 000 R 1 507 624 -R7 624

LP 098 TAC costs R3 000 000 R 5 705 823 -R2 705 108

LP 244 Gender Mains R 1 000 000 R 751 886 R 248 114

LP 246 Appropriate Tech R 200 000 R 153 017 R 46 983

LP 091 Civil Society R 1 600 000 R 769 834 R 830 166

LP127 LG & SALGA R 1 500 000 R 1 105 127 R 394 873

LP 129 Training R 700 000 R 373 676 R 326 324

LP 249 Support Directors R 1 000 000 R 1 163 331 R 163 331

LP 248 Health & Hygiene R 1 500 000 R 482 462 R 1 017 538

TOTALS R19 050 000 R14 031 311 R 5 018 68956

Page 57: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

5757

Planning (WSDP)TARGETS• All 11 WSAs WSDP reviewed• LP239 District Planning Support: Revive 4 water sector

planning forums at WSAs• RSIP Capricorn - Facilitating the updating of masterplans for

each of the 4 Local Municipalities in the Capricorn District and Sekhukhune District Municipality

ACHIEVED• 11 PSPs appointed to review WSDP. 19 Working sessions

were held, 2 WSDPs complete, 9 in progress to be complete by 31 March 2009, Polokwane 100%, Belabela 100%, CDM 85%, MDM 80%, GSDM 80%, VDM 15%, Mogalakwena 80%, Thabazimbi 80%, Modimole 70%, Lephalale 10%, Mokgopong 50%.

• 3 of the 4 forums revived• Updating of 5 masterplans in progress, 10%

Page 58: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

5858

PLANNING CONTI….

CHALLENGES

• Not enough staff to do the work, • Late appointment of PSPs due to lack of consensus by

WSAs• Lack of commitment from stakeholder to participate

Page 59: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

5959

PLANNING CONTI….

PROPOSED SOLUTION

• Recruitment of staff. Continuous engagement of WSAs to expedite the review the outstanding

• Intervention from Premiers Office required. • Continues engagement with WSAs and other

stakeholders

Page 60: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6060

ASSESMENT OF MIG TECHNICAL REPORTSTARGETS• Assess 60 REPORTSACHIEVEMENTS• Capricorn =14, recommended 7, 6 referred back, 1 not recommended .

Waterberg = 7, recommended 7, Sekhukhune = 15, recommended 12 , 3 not assessed. Mopani =14 ,recommended 1 referred back 13. Vhembe= 11, 9 recommended, 2 referred back. total number of technical reports received= total number recommended = 29 not recommended 1, referred back 24

CHALLENGES• Poor Quality of some technical reports, • Not enough staff at District level

Page 61: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6161

ASSESMENT OF MIG TECHNICAL REPORTS Conti........

PROPOSED SOLUTION

• Continual engagement of WSAs to improve the quality of technical reports. Formal communication done with human resource management to address the problem

Page 62: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6262

School Water ProgrammesTARGETS• Supply 58 schools with water. • Assist DoE with supplying water to 697 number of schools

ACHIEVEMENTS• Service provider appointed. • Geo-Hydrological investigation completed. drilling, testing and

equipping of boreholes done to 11 schools.

CHALLENGES• Late appointment of service providers, late identification of

schools by DoE.

PROPOSED SOLUTION• Fast tracking of the implementation

Page 63: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6363

DISASTER MANAGEMENT

TARGETS• Attend to planning of interventions when a disaster

occurred

ACHIEVEMENTS• none

CHALLENGES• none

Page 64: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6464

2010 FIFA World CupTARGETS

• Ensure adequate and reliable water supply to Polokwane during the soccer world cup.

ACHIEVEMENTS

• PSPs appointed by Polokwane Municipality for design and implementation of services in town.

• No additional funds could be acquired

CHALLENGES

• To obtain additional funding for infrastructure in Polokwane and upgrading of the Olifantspoort Water Treatment Works

Page 65: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6565

2010 FIFA World Cup conti…

PROPOSED SOLUTION

• Negotiations with DWA construction to obtain un-used funds from their side to fund the current deficit.

• Continue negotiations with Head Office and National Treasury to obtain additional funding of R 330 million

Page 66: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6666

Bulk Water Infrastructure (Planning) (Implementation Ready Studies

TARGETS• Conducting 9 feasibility studies

ACHIEVEMENTS• 8 of the 9 extension of appointments were approved and orders

issued. • Feasibility studies 90% complete.. .CHALLENGES• No funding available for the extension of appointment on the

Lephalale feasibility study. • Verification of water resource availability

PROPOSED SOLUTION• If existing water resource is not sufficient, new resources have to

be investigated and developed. • Meeting held with Water Resources Planning on 2008-10-01

Page 67: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6767

Appropriate Technology

TARGETS• Support WSAs with informed decision in selecting a

technology

ACHIEVEMENTS• PSP appointed reviewed guideline.

1 workshop performed. • WSAs endorsed the reviewed Appropriate Tech

CHALLENGES• In-availability of presenters and exhibitors for the planned

workshop

Page 68: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6868

Support

Page 69: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

6969

INSTITUTIONAL MAP

Page 70: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7070

INSTITUTIONS IN WATER SERVICES PROVISION

Institution Role in Service DeliveryLepelle Northern Water Provision of bulk water to Polokwane LM

(Olifants-Sands Scheme, Ebenezer Pipeline), Mogalakwena (Doorndraai Pipeline), Ba- Phalaborwa (Phalaborwa Barrage), Greater Sekhukhune (Flag Boshielo Scheme), G. Tzaneen (Thabina/Tours)

Magalies Water Bulk water supply to Thabazimbi LM

Eskom Bulk water supply to Lephalale LM

Lebalelo Water User Association (Section 21 Water company)

Provision of water to Greater Sekhukhune DM area in support of Local Economic Development (LED) – mining

Page 71: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7171

KEY CHALLENGES: SOURCE DEVELOPMENTChallenge Intervention

Lephalale Water Augmentation Complete the Mokolo Crocodile Water Augmentation (MCWAP) Study.

Augmentation from the Vaal River System

Identify funding sources approx. R20billionLong-term water security for Giyani Area Review Middle Letaba hydrology

Augmentation from other sources e.g. Nandoni dam (est. cost R250million)

Long-term water security for the Sekhukhune Area (“Nebo” Plateau)

Complete regional bulk planning for the De Hoop project – in association with the District Municipality (est. R13billion)

Eskom to review delayed pumped-storage scheme

Review future new sources e.g. new Rooipoort Dam on the Olifants

Improved utilisation and management of groundwater

Monitoring of borehole levels pumping restrictions

Long-term water security for the Limpopo Province

Initiate studies at Regional (SADC) level

Page 72: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7272

KEY CHALLENGES: INFRASTRUCTURE DEVELOPMENTChallenge Intervention

Lack of accurate planning statistics Improve statistical records from various sources especially MIG

Prioritisation of backlog areasWater security for Moutse area New Water Use License to be approved by

DWA. Greater Sekhukhune DM to implement the bulk infrastructure (est. R120million) PSP appointed to investigate different options (Available budget R53million over a 3year period)

Water security for Botlokwa area Completion of the transfer pipeline from Nandoni dam (est. cost R200million)

Insufficient funds to complete the Regional Bulk Infrastructure Programme and Projects in support of 2010 Host City

Secure additional funds e.g. Olifantspoort Water Treatment Works which supplies Polokwane (est. R197million)

Long-term financing plan to clear backlogs Refine funding models from Water Services Development Plans (WSDPs) especially linking with funding sources for operations and maintenance

Page 73: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7373

MOUTSE

Page 74: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7474

KEY CHALLENGES: SCHEME OPERATIONSChallenge Intervention

Revenue generation by municipalities is insufficient to operate and maintain schemes sustainably

Review equitable share contributions to local government

Improve billing and cost recovery by local government

Free Basic Water: Difficulty in identifying indigent households

Proposed supply of minimum 6000kl per household per month regardless of indigency

Inappropriate use of water services subsidies Ring-fencing of water services subsidy transferred according to DORA

Water quality supplied may not be up to standard Ongoing sampling per month

Assessment through the Blue Drop programme

Water pollution All sewage works audited by DWA

Assist with refurbishment and operations for critical plants

Ongoing assessment through Green DropBa-Phalaborwa debt with Lepelle Northern Water Board (the bulk supplier)

Turnaround project: meter installation, correct billing to be completed by end Dec 2009

Page 75: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7575

KEY CHALLENGES: CAPACITY-BUILDINGChallenge Intervention

Inadequate technical skills in municipal water services departments

Secondment of DWA staff: 2268 at scheme level

Appointment of technical assistance consultants to assist with planning

Scheme operators not skilled DWA assisting with classification of operators according to Regulations

Identify skills gaps and recommend training programmes (statistics still being compiled)

Ineffective systems for the management of water services: planning, development, operations/maintenance

Regular assessments by DWA using WSA Checklist

Support programme as per Municipal Support Plans (MSP)

Page 76: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7676

KEY FOCUS AREAS FOR 09/10Strategic Goal/Functional Area Deliverable

Water Resources Management and Source Development

Long-term integrated planningInformation maintained to enable planningPollution prevented

Infrastructure for Water Services Eradication of water and sanitation backlog in schools Address potential water services “hotspots”Eradication of general sanitation backlog by 2014Schemes refurbished on time

Scheme Operations Reliable supply of water of acceptable quality and quantityWater quality test recordsTrained operatorsWater subsidy transferred to municipalities on time

Capacity-Building of aligned and effective institutions

Support to Local Government through Municipal Support Plans and WS business plansTrained personnel in DWA and local governmentCo-operative management of water sector

Page 77: Presentation to Portfolio Committee on Water and ...pmg-assets.s3-website-eu-west-1.amazonaws.com/docs/2009/090909... · Presentation to Portfolio Committee on Water and . Environmental

7777