TRANSCRIPT

Peninsula-Mallorca interconnection. ROMULO project

2

Contents

Project motivation

General description

Marine activities

Project challenges

Peninsula-Mallorca interconnection. ROMULO project

3

Project motivation

Connect Balearic electric system to the Peninsular-European system

Benefits for the Spanish electric system: generation costs

CO2 emissions

Benefits for the Balearic electric system: large improvement in security of supply

existing

planned

RÓMULO

Peninsula-Mallorca interconnection. ROMULO project

4

General description

Double link, HVDC, 2 x 200 MW, 250 kV, metallic return

2 HV cables + 1 MV/FO cable

No submarine joints

Max. depth: 1.485 m

Length: 244 km

Turn-key contracts: Siemens (converters)

Nexans/Prysmian (cable system)

Peninsula-Mallorca interconnection. ROMULO project

5

Morvedre converter station (Sagunto, peninsular side)

Peninsula-Mallorca interconnection. ROMULO project

6

Santa Ponsa converter station (Mallorca side)

Peninsula-Mallorca interconnection. ROMULO project

7

Sagunto landing

Peninsula-Mallorca interconnection. ROMULO project

8

Santa Ponsa landing

Peninsula-Mallorca interconnection. ROMULO project

9

HVDC Cables design

2 direct current cables Conductor: copper 750 mm² - 1.200 mm² Insulation: mass impregnated paper Screen: lead alloy Reinforcement (armour): double layer of

galvanized steel tapes Outer diameter: 94 mm

DIRECT CURRENT CABLES (poles)

Land cable Submarine cable (shallow)

Submarine cable (deep)

Cu 1.200 mm2

No armour

Cu 750 mm2

Single armourDepth < 200-220 m

Cu 750 mm2

Double armour

Weight: 23 kg/m Weight: 23,5 kg/m Weight: 29,5 kg/m

Peninsula-Mallorca interconnection. ROMULO project

10

Within scope of turn-key contract

3 independent laying campaigns January – March 2011 From Mallorca to Sagunto Giulio Verne and Skagerrak

Post laying protecion works Scope: burial of cables 1m under seabead,

up to 1000 m water depth January – July 2011 Jetting, 284 km (Edda Fjord)

Rock trenching (Argo), 23 km

Protection works in Posidonia

Marine activities

Peninsula-Mallorca interconnection. ROMULO project

11

Status of the project All permits and authorizations were granted in 2009 and 2010 (Spanish

Ministries of Environment and Industry, Coastal Departments, Port Authority)

Converter stations: civil works and installation finished, testing ongoing

Morvedre (Sagunto) converter station energized in June 2011

Santa Ponsa converter Station will be energized in October 2011

Land and marine sections works: cable installation and protection completed

Operation of the interconnection will start late 2011

Peninsula-Mallorca interconnection. ROMULO project

12

Project challenges

First HVDC submarine interconnection in Spain

World second deepest installation (1.485 m)

Highest investment for a single project in REE (400 M€)

Interconnection operation and energy management