Presentation Program OutlinePresentation Program Outline
BACKGROUND / TMDLBACKGROUND / TMDL
WATERSHED CHARACTERISTICS
EROSION HISTORY
PLANNING PROCESS
ALTERNATIVE FORMULATION
BENEFITS - WATER SUPPLY / QUALITY / HABITAT
![Page 3: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/3.jpg)
Background &Watershed TMDLBackground &Watershed TMDLBackground & Watershed TMDLBackground & Watershed TMDL
![Page 4: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/4.jpg)
San Diego Creek / Newport Bay WatershedSan Diego Creek / Newport Bay Watershed
• Located within Orange gCounty, CA– 11 cities + County
• 154 total square miles• 154 total square miles– 118 square miles – SDC watershed
• Three main geographical areas
• Watershed drains into Newport BayNewport Bay
![Page 5: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/5.jpg)
Borrego Canyon WashBorrego Canyon Wash
Sam Diego Creek
Watershed
Borrego Canyon Wash
![Page 6: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/6.jpg)
Newport Bay
•• Upper Newport Upper Newport BayBayBayBay– State Ecological Reserve
– Habitat for 200+ species of birds includingU B birds, including endangered light‐footed clapper rail & CA least tern
Upper Bay
•• Lower Newport Lower Newport BayBay
Lower Bay– Fully developed and
channeled harbor
– One of largest small craft
Lower Bay
pleasure harbors in the United States
![Page 7: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/7.jpg)
Newport Bay and WatershedNewport Bay and Watershed
• Area has experienced dramatic change in land use since 1900
• Agriculture predominant
1947
Agriculture predominant use historically
1983 - 22%2002 5%
20072002 - 5%
• Rapidly urbanizing1983 - 47% urban 2002 - 75% urban
![Page 8: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/8.jpg)
History of Sedimentation Problem
• Changes in land use of area
• Ditch drainages artificially channeledartificially channeled into Upper Newport Bay
Upper Newport Bay
SedimSediment Plume
![Page 9: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/9.jpg)
History of Sedimentation ProblemHistory of Sedimentation Problem
• San Diego Creek 1967
channeled to UNB in 1965
• Major Floods in 1969• Major Floods in 1969 and 1978
• Large amounts of 1975
sediment deposited in Upper Newport Bay
• Ecological Reserve• Ecological Reserve adversely affected
1978
![Page 10: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/10.jpg)
History of Sedimentation ProblemHistory of Sedimentation Problem
Upper Newport BayUpper Newport Bay
Sediment Plume
![Page 11: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/11.jpg)
Early Efforts Early Efforts –– CWA Section 208 PlanCWA Section 208 Plan
• Local agencies sponsored intensive study to address excess di i N Bsediment in Newport Bay
• San Diego Creek Comprehensive Stormwater Sedimentation Control Plan completed in 1983
• Study indicated that bulk of sediment coming from surrounding hills, agriculture,
d t tiand construction
• Executive Committee formed to continue to implement recommendations of the Plan
![Page 12: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/12.jpg)
Early Efforts Early Efforts –– 208 Plan208 Plan
Consisted of land management practices to reduce sediment at its sources, and structural measures to localize sediment ,deposition and facilitate its management
• Agricultural BMPs• Construction BMPs• Installation of foothill basins• Installation of in‐channel basinsInstallation of in channel basins• Installation of in‐Bay basins• Stabilization of channels w/in developing areas
S di t M it i• Sediment Monitoring
![Page 13: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/13.jpg)
Watershed Sediment BasinsWatershed Sediment Basins
Foothill Basins
In channelIn-channel Basins
In bayUnit I/IIIUnit II In-bay BasinsUnit I
Unit II
Unit I/IIIUnit II
![Page 14: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/14.jpg)
Regulatory Background
• Newport Bay placed on 1996 303(d) list p y p ( )
HIGH priority for TMDL development
• Consent decree entered into October 31• Consent decree entered into October 31, 1997 between USEPA and Defend the Bay
• EPA promulgated TMDL on April 13, 1998
• March 1999 – State of CA ratified the Sediment TMDL
![Page 15: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/15.jpg)
Sediment TMDL Targets
• 50% reduction in sediment load to Newport pBay within 10 years (2009)
• No greater than 1% change in Bay habitatNo greater than 1% change in Bay habitat acreages due to sediment deposition
• Depth requirements ( 7 ft MSL) in UNB basins• Depth requirements (‐7 ft MSL) in UNB basins
• Reduced frequency of dredging in UNB
![Page 16: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/16.jpg)
Watershed Monitoring
• 8 streamgaging/sediment i i imonitoring stations
• Based on land‐use– Open spaceOpen space
– Agriculture
– Construction
– Urban
– Mixed
![Page 17: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/17.jpg)
Fluvial Sediment Monitoring
![Page 18: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/18.jpg)
Bay Monitoring
• Topographic/Bathymetric p g p / yand Vegetative Monitoring
– Every 3 years
• Sediment sampling
– Bed, suspended
![Page 19: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/19.jpg)
Sediment Discharge 1983‐2008San Diego Creek at Campus Dr.
700 40
500
600
ands
of t
ons)
25
30
35
es)
TMDL 10-YR TARGET62,500 tons/yr
TMDL running average45 200 tons/yr
300
400
char
ge (T
hous
a
15
20
25
Rai
nfal
l (In
che45,200 tons/yr
100
200
Sedi
men
t Dis
5
10
15
01983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
0
5
Daily Max Annual Load - daily max Rainfall TMDL TargetDaily Max Annual Load - daily max Rainfall TMDL Target
![Page 20: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/20.jpg)
Project Objective & ApproachProject Objective & ApproachProject Objective & ApproachProject Objective & Approach
![Page 21: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/21.jpg)
Project Need Project Need –– Sediment ReductionSediment Reduction
• Borrego Wash Identified as largest contributor of sediment to Newport Bay– One of the few remaining channels with natural, unimproved segmentsunimproved segments
– Channel erosion with substantial stream incision– Severe stream bed degradation and widening
• Rapid urbanization of the watershed– Shea/Baker Ranch Property Development– Great Park– Great Park
• SWRCB identifies funds to be spent on Borrego Wash stabilization project
![Page 22: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/22.jpg)
Project ObjectivesProject Objectives
Primary Project Objectives
• Sediment TMDLSediment TMDL
• Reduced erosion and sedimentation
• Minimizing hydraulic impact to existing floodplain
• Improving public safety
• Preservation of existing biological resources
• Protection of existing public infrastructure and facilities
Secondary Project Objectives
G d t h• Groundwater recharge
• Minimize increased sediment delivery
• Habitat restorationHabitat restoration
• Public facility protection
![Page 23: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/23.jpg)
Two Phase Study ApproachhPhase 1 – Baseline Existing Conditions Analysis
1 1 D t C ll ti d R h1.1 Data Collection and Research1.2 Field Stream Reconnaissance and Geomorphic Assessment1.3 Previous Hydrology and Hydraulic Analysis Review1 4 Sediment Data Evaluation1.4 Sediment Data Evaluation1.5 Stream Characterization and Reach Identification1.6 Upstream Watershed Sediment Delivery Analysis1 7 Sediment Budget/Continuity Analysis1.7 Sediment Budget/Continuity Analysis1.8 Fluvial Model Development / Modeling – General Scour
Analysis1.9 Fluvial Long Term Adjustment Modeling1.9 Fluvial Long Term Adjustment Modeling1.10 Assessment of Existing Stream Response and Channel
Adjustment
![Page 24: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/24.jpg)
Two Phase Study ApproachPhase 2 – Creek Stabilization / Restoration Alternatives Analysis
2.1 Constraints Analysis and Base Maps2.2 Conceptual Stabilization Alternative Formulation2.3 Preliminary Alternatives Alignment / Geometry / Layout2.4 Geomorphic Channel Restoration Elements2 5 Alternatives Preliminary Engineering General Fluvial Analysis /2.5 Alternatives Preliminary Engineering General Fluvial Analysis /
Hydraulic Sizing2.6 Proposed Conditions Alternatives HEC-RAS Floodplain
Hydraulics2 7 Fluvial Modeling Preliminary Alternatives2.7 Fluvial Modeling Preliminary Alternatives2.8 Hydraulic/Fluvial Model Assessment Restored Channel
Response/Stability2.9 Feasibility Analysis and Selection Recommended Alternative2 10 Pl i L l C t ti C t E ti t2.10 Planning Level Construction Cost Estimate2.11 Preliminary Phasing Analysis2.12 Creek Restoration/Stabilization - Preliminary Feasibility Report2.13 Stakeholder Presentation – Study Resultsy
![Page 25: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/25.jpg)
Borrego Wash – Regional WatershedDrainage Area = 5.23 square milesQ100 = 5,200 cfs (Irvine Blvd.)
West Branch Watershed
Main Stem Creek
![Page 26: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/26.jpg)
Foothill Ra
Study Reach10,500 ftToro
![Page 27: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/27.jpg)
Regional Watershed SettingRegional Watershed Setting
Upstream LimitUpst ea t
Downstream Limit
![Page 28: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/28.jpg)
Historical Erosion IssuesHistorical Erosion IssuesHistorical Erosion IssuesHistorical Erosion Issues
![Page 29: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/29.jpg)
Previous Channel Erosion Studies
• Channel erosion studies initiated in 1982 by Stanley W. Trimble, UCLA Dept. of GeographyTrimble, UCLA Dept. of Geography
• In 1983, just under 200 cross‐sections installed across earthen channels of all sizes and types and surveyed
• Surveyed annually – new profiles added/subtracted
• By 1993, results showed that channel erosion furnished more than 50% of sediment yield from San Diego Creekmore than 50% of sediment yield from San Diego Creek
![Page 30: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/30.jpg)
Watershed Channel Erosion Study 2006Watershed Channel Erosion Study 2006Dr. Stanley W. Trimble, UCLADr. Stanley W. Trimble, UCLA
![Page 31: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/31.jpg)
Channel Erosion Studies in WatershedDr. Stanley W. Trimble, UCLA
Total Miles of Channel by Condition
![Page 32: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/32.jpg)
Borrego Wash Watershed 1938 and 1983Borrego Wash Watershed 1938 and 1983
From: Trimble report, November, 2004
![Page 33: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/33.jpg)
Lateral Bank Migration 1952 Lateral Bank Migration 1952 ‐‐20032003
From: Trimble report, November, 2004
![Page 34: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/34.jpg)
Primary Sediment Source Reach ErosionPrimary Sediment Source Reach Erosion
From: Trimble report, November, 2004
![Page 35: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/35.jpg)
![Page 36: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/36.jpg)
![Page 37: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/37.jpg)
![Page 38: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/38.jpg)
![Page 39: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/39.jpg)
![Page 40: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/40.jpg)
![Page 41: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/41.jpg)
![Page 42: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/42.jpg)
![Page 43: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/43.jpg)
![Page 44: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/44.jpg)
![Page 45: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/45.jpg)
![Page 46: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/46.jpg)
![Page 47: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/47.jpg)
Baseline Watershed Processes AssessmentBaseline Watershed Processes AssessmentBaseline Watershed Processes AssessmentBaseline Watershed Processes Assessment
![Page 48: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/48.jpg)
Detailed Engineering Investigation Detailed Engineering Investigation andandPlan Formulation ProcessPlan Formulation Process
Establishobjectives andaims of project
Use guidinggeomorphic
principles for
Collect geomorphic
and physical data
Watershedhydrology and
rainfall
Evaluate physical and
environmentalsite conditions assessment Constraints /
Sediment Sources
Floodplainh d li
Analyze hydraulicd hi
Sedimentt t
Application ofi i l
Evaluatet tihydraulics and geomorphic
datatransport empirical
geomorphicrelationships
restoration Options and
technical assessment
![Page 49: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/49.jpg)
Channel Sediment Source IdentificationChannel Sediment Source Identification
Geomorphic Assessment of Historical Sediment Volume Lost from topography changes
60%
25%25%
5%
10%
![Page 50: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/50.jpg)
Watershed GIS DatabaseWatershed GIS Database
Vegetation Survey
Soil Types
![Page 51: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/51.jpg)
Watershed LanduseWatershed Landuse
![Page 52: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/52.jpg)
Watershed Erosion Potential Watershed Erosion Potential
![Page 53: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/53.jpg)
FEMA Flood Hazard MappingFEMA Flood Hazard Mapping
![Page 54: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/54.jpg)
Geomorphic Historical TrendsGeomorphic Historical Trends
![Page 55: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/55.jpg)
Stream Reach Identification / Characterization
• Evaluate hydraulically and geometrically similar lengths a uate yd au ca y a d geo et ca y s a e gt schannel– Statistical analysis to determine reach locations
• Average hydraulic parameters for reach
• Average sediment characteristics
• Average channel geometry
![Page 56: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/56.jpg)
Borrego Wash – Reach Identification
![Page 57: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/57.jpg)
Borrego Wash – Reach Identification
![Page 58: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/58.jpg)
General Reach Characteristics
Reach No.
Description Length (ft) Avg. Slope
Entrance of wildlife corridor to existing grade control1
Entrance of wildlife corridor to existing grade control structure/dry weather crossing.
550 0.017
2Existing grade control structure/crossing to the downstream side of the existing landfill.
1,450 0.017
3Downstream end of existing landfill to existing grade control structure near utility corridor.
920 0.017
4Existing grade control structure to upstream end of existing landfill.
660 0.019
5Upstream end of existing landfill to downstream end of proposed Baker Ranch development.
1,300 0.018
6Downstream end of proposed Baker Ranch development to existing vertical drop immediately downstream of the 2,740 0.0166 existing vertical drop immediately downstream of the exposed sandstone channel section adjacent to the nursery.
2,740 0.016
7Existing vertical drop at sandstone channel section to upstream end of sandstone channel section.
480 0.052
Upstream end of sandstone channel section to upstream end8
Upstream end of sandstone channel section to upstream end of proposed Baker ranch development.
720 0.021
![Page 59: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/59.jpg)
Streambed Profile VariationStreambed Profile Variation
![Page 60: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/60.jpg)
Floodplain HECFloodplain HEC‐‐RAS Work Map RAS Work Map ––Cross Section LocationsCross Section Locations
![Page 61: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/61.jpg)
Floodplain Hydraulic CharacteristicsFloodplain Hydraulic Characteristics
30
35 Legend
Vel Total 100-yr
Velocity Profile
15
20
25
Vel T
otal
(ft/s
)
Top Width Profile
400
g
Top Width 100-yr
5
10
Top Width Profile
300
Wid
th (f
t)
0 2000 4000 6000 8000 10000 12000 140000
Main Channel Distance (ft)
100
200
Top
0 2000 4000 6000 8000 10000 12000 140000
Main Channel Distance (ft)
![Page 62: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/62.jpg)
Sediment Continuity AnalysisSediment Continuity Analysis
Borrego Wash 100-Year Storm Event Sediment Yield Summary - Aggradation/Degradation (Feet)
3 00
2.00
3.00
Yang
Van-Rijn
Ackers-White
0.00
1.00
R5 R4 R3 R2 R1
n/D
egra
datio
n MPM
-2.00
-1.00
Agg
rada
tion
-4.00
-3.00
Reach
![Page 63: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/63.jpg)
Alternative Formulation ProcessAlternative Formulation ProcessAlternative Formulation ProcessAlternative Formulation Process
![Page 64: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/64.jpg)
General Alternative ProcessGeneral Alternative Process
![Page 65: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/65.jpg)
Technical Issues / ConstraintsTechnical Issues / Constraints
• Adjacent projects– Alton Parkway roadway – Shea / Baker Ranch– Wildlife Corridor– USMCAS/FAA Uses
• Physical constraints– Elevation/slope– GeologyGeology– Vegetation
• WatershedHydrology– Hydrology
– Sediment delivery• Other
ili i– Utilities
![Page 66: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/66.jpg)
Alternative Creek Stabilization Methods
![Page 67: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/67.jpg)
Technical Guidance for Natural Stream Stabilization Design
![Page 68: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/68.jpg)
![Page 69: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/69.jpg)
Alternatives – Reach Matrix
![Page 70: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/70.jpg)
Category 2 – Flow Redirection
![Page 71: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/71.jpg)
Category 3 – Structural Revetments
![Page 72: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/72.jpg)
Category 3 – Structural Revetments
![Page 73: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/73.jpg)
Category 4 – Other Structural Techniques
![Page 74: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/74.jpg)
Category 4 – Other Structural Techniques
![Page 75: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/75.jpg)
Category 5 – Biotechnical Techniques
![Page 76: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/76.jpg)
Category 5 – Biotechnical Techniques
![Page 77: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/77.jpg)
Category 6 – Channel Geometry Modification
![Page 78: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/78.jpg)
Category 7 – Channel Alignment Modification
![Page 79: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/79.jpg)
Category 7 – Channel Alignment Modification
![Page 80: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/80.jpg)
Systems Alternative FormulationSystems Alternative Formulation
![Page 81: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/81.jpg)
Summary of Systems Alternatives Summary of Systems Alternatives Generated From Initial ScreeningGenerated From Initial Screening
Alternative No. Identifier Alternative No. Identifier
1.1Rehabilitate Grade Control
5.1 Groins
1 2 New Grade Control 5 2 Bank Stabilization w/ Terraces1.2 New Grade Control 5.2 Bank Stabilization w/ Terraces
1.3Stabilized Bank Protection
5.3 Hybrid Combination
2.1Sediment Basin / Grade Control Only
6.1Stabilized Earth w/ Grade Control Channel Filly
2.2Groins / Terraced Channel
6.2Stabilized Earth w/ Grade Control Existing Channel Elevation
2 3Bank Stabilization /
6 3 Bypass2.3Terraced Channel
6.3 Bypass
2.4 Minimum Stabilization 6.4 Stabilization
3.1Bank Stabilization/Groins / Terraces
7.1Stabilized Earth w/ Grade Control
Terraces
3.2Groins w/ Bank Stabilization
7.2 Cascade Step‐Pool
3.3 Minimum Stabilization 7.3 BypassGrade Control Stabilized Earth w/ Grade
4.1Grade Control Rehabilitation
8.1Stabilized Earth w/ Grade Control
4.2New Grade Control w/ Bank Stabilization
8.2 Bypass
![Page 82: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/82.jpg)
Alternative Ranking Alternative Ranking –– Stakeholder ProcessStakeholder Process
![Page 83: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/83.jpg)
Numerical Alternative Ranking Matrix
![Page 84: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/84.jpg)
Numerical Alternative Ranking Matrix
![Page 85: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/85.jpg)
Recommended Project SystemRecommended Project SystemRecommended Project SystemRecommended Project System
![Page 86: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/86.jpg)
Recommended ProjectAlternative Identifier Description
1.3 Stabilized Bank ProtectionMaintain existing grade control. Toe protection opposite bank of roadway rip-
rap and stabilize eroded banks or areas of high potential erosion with vegetated planting and geotextile wrap. Join D/S Alton Parkway improvements.
2.3 Bank Stabilization / Terraced Channel
Stabilize existing eroded banks, slopes and install groins with floodplain terrace.
3.1 Bank Stabilization / Groins / Terraces
Stabilize eroded banks thorough regarded to stable slope, provide toe protection, create vegetated floodplain terraces outside active
f ff /Terraces streambed for vegetative buffer, and utilize rock bendway weirs/groins.
4.2 New Grade Control w/ Bank Stabilization
Abandon existing drop structure and construct two new grade control structures to break drop and stabilize narrow channel width section. Grade control located at the upstream and downstream ends of the narrow channel section.
Rock spurs / groins fields as well as the stabilized graded banks revegetated
5.3 Hybrid CombinationRock spurs / groins fields as well as the stabilized graded banks, revegetated
floodplain terraces with buried rock sill and brush windrows and created define active channel, stabilize eroded banks through reshaping, rock toe protection with brush layers (combines alt 5.1 and 5.2).
6 3 BypassParallel bypass RCB to divert main flood flows from Creek, stabilize existing
eroded channel banks through filling on Baker Ranch side and excavating on FAA side, stabilize bottom of existing channel with buried6.3 Bypass excavating on FAA side, stabilize bottom of existing channel with buried rock sills, provide toe protection each bank with brush layering, vegetate channel banks.
7.3 BypassParallel bypass RCB to divert main flood flows from Creek, stabilize existing
eroded channel banks through filling on Baker Ranch side and excavating on FAA side, stabilize bottom of existing channel with buried rock sills, provide toe protection each bank with brush layering,
t t h l b kvegetate channel banks.
8.2 BypassParallel bypass RCB to divert main flood flows from Creek, stabilize existing
eroded channel banks through filling on Baker Ranch side and excavating on FAA side, stabilize bottom of existing channel with buried rock sills, provide toe protection each bank with brush layering, vegetate channel banks.
![Page 87: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/87.jpg)
Preliminary Stabilization Design
![Page 88: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/88.jpg)
Reaches 1 & 2 – 2,000 ft
![Page 89: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/89.jpg)
Reaches 1 & 2 – 2,000 ft
R h 1 $152 000Reach 1 = $152,000Reach 2 = $520,000
![Page 90: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/90.jpg)
Reaches 3 & 4 – 1,580 ft
![Page 91: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/91.jpg)
Reaches 3 & 4 – 1,580 ft
R h 3 $236 000Reach 3 = $236,000Reach 4 = $484,000
![Page 92: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/92.jpg)
Reach 5 – 1,300 ft
![Page 93: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/93.jpg)
Reach 5 – 1,300 ft
R h 5 $1 101 000Reach 5 = $1,101,000
![Page 94: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/94.jpg)
Reach 6 – 2,740 ft
![Page 95: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/95.jpg)
Reach 6 – 2,740 ft
![Page 96: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/96.jpg)
Reaches 6 – 2,740 ft
Reach 6 = $6523000
![Page 97: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/97.jpg)
Reach 6 – 2740 ft
Reach 6 = $6523000
![Page 98: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/98.jpg)
Typical Sections Reach 7 & 8Typical Sections Reach 7 & 8
![Page 99: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/99.jpg)
Reaches 7 & 8 – 1,200 ft
![Page 100: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/100.jpg)
Reaches 7 & 8 – 1,200 ft
![Page 101: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/101.jpg)
Summary of Construction CostsSummary of Construction Costs
Alternative IdentifierReach Length
(ft) Const. CostAlternative Identifier (ft) Const. Cost
1.3 Stabilized Bank Protection 400 $ 146,000.00
2 3Bank Stabilization / Terraced
Channel 1 400 $ 473 000 002.3 Channel 1,400 $ 473,000.00
3.1Bank Stabilization / Groins /
Terraces 1,100 $ 232,000.00
4 2New Grade Control w/ Bank
St bili ti 400 $ 477 000 004.2 Stabilization 400 $ 477,000.00
5.3 Hybrid Combination 1,040 $ 1,084,000.00
6.3 Bypass 2,700 $ 8,414,000.00
7.3 Bypass 475 $ 1,236,000.00
8.2 Bypass 725 $ 3,528,000.00
8,240 $ 15,590,000.00
![Page 102: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/102.jpg)
Water Quality BenefitsWater Quality Benefits
• Reduction of sediment downstream to UNBeduct o o sed e t do st ea to U
• Removing major source of sediment making it difficult to achieve sediment TMDL
• Improving the water quality downstream San Diego Creek Channels
• Reducing sediment deposition in downstream habitat and sediment basins
• Intercepting urban dry weather flows for• Intercepting urban dry‐weather flows for restored vegetative corridor
![Page 103: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/103.jpg)
Watershed Habitat RestorationWatershed Habitat Restoration
• Restoration of vegetative habitat corridor
• Creation of new habitat features within the• Creation of new habitat features within the adjacent floodplain
• Stabilization / protection of vegetation from erosion• Stabilization / protection of vegetation from erosion
• Connecting regional wildlife corridor to proposed Great Park Wildlife CorridorGreat Park Wildlife Corridor
• Creation of approximately 50 acres of new habitat
![Page 104: Presentation Program Outline](https://reader030.vdocuments.site/reader030/viewer/2022012709/61a9034ff2fb1d5c4d478f88/html5/thumbnails/104.jpg)