presentation overview • primary hull structure • minehunters

61
1 Eric Greene Presentation Overview Primary Hull Structure Minehunters Special Forces & Boats Superstructure Foils and Appendages Surface Ships Submarines Components

Upload: duongliem

Post on 30-Dec-2016

224 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Presentation Overview • Primary Hull Structure • Minehunters

1Eric Greene

Presentation Overview

• Primary Hull Structure• Minehunters• Special Forces & Boats

• Superstructure

• Foils and Appendages• Surface Ships• Submarines

• Components

Page 2: Presentation Overview • Primary Hull Structure • Minehunters

2Eric Greene

OSPREY Class MinehunterPrimary Structure

Page 3: Presentation Overview • Primary Hull Structure • Minehunters

3Eric Greene

Special Forces 11- Meter RIBPrimary Structure

In-Service Photos of the U.S. Navy Special Warfare’s 11-Meter RIB Built by U.S. Marine

Page 4: Presentation Overview • Primary Hull Structure • Minehunters

4Eric Greene

BoatsPrimary Structure

Members of Inshore

Boat Unit Seventeen

(IBU 17) Patrol the Waters of

Apra Harbor,

Guam

At sea Aboard USS Blue Ridge (LCC 19) Sailors

Practice Deployment of Ship’s Small Boats

Page 5: Presentation Overview • Primary Hull Structure • Minehunters

5Eric Greene

Swimmer Delivery VehiclesPrimary Structure

Special Forces Divers Work with a Swimmer Delivery Vehicle

Schematic of Northrop Grumman’s 65-foot Advanced

SEAL Delivery System

Page 6: Presentation Overview • Primary Hull Structure • Minehunters

6Eric Greene

Helicopter Hanger for DDG 51 Flt IIASuperstructure

Composite Helicopter Hanger for DDG 51 Flight IIA Destroyer Builtat Northrop Grumman Ship Systems’ Gulfport Facility

Scheduled to be Installed on DDG 100

Page 7: Presentation Overview • Primary Hull Structure • Minehunters

7Eric Greene

Forward Director RoomBuilt by Northrop

Grumman’s El Segundo Facility as Technology

Demonstrator for DDG 51 under ManTech Funding

DDG 51 Forward Director Room Superstructure

Page 8: Presentation Overview • Primary Hull Structure • Minehunters

8Eric Greene

Surface ShipsFoils & Appendages

Composite MCM Rudder Built by Structural Composites Shown During Shock Trials

A Composite Twisted Rudderunder Development

Page 9: Presentation Overview • Primary Hull Structure • Minehunters

9Eric Greene

SubmarinesFoils & Appendages

Advanced Composite Sail Envisioned for Virginia Class Submarines (top left) and 1/4-Scale Prototype Built by SeemannComposites (bottom left)

Composite Submarine Bow Dome Produced by

Goodrich Composites

Page 10: Presentation Overview • Primary Hull Structure • Minehunters

10Eric Greene

Boat Davits

Priority High

Opportunity Potential to reduce maintenance andincrease personnel safety

TechnicalIssues

Functional design, safety factors, interfacewith metal hardware

Previous Work Advanced Lightweight Engineering in theNetherlands has developed a compositedavit for Davit International in Germany

Return onInvestment

MediumConventional Boat Davits

on USNS Comfort

Components

Page 11: Presentation Overview • Primary Hull Structure • Minehunters

11Eric Greene

Bulkheads, Nonstructural

Priority Medium

Opportunity Opportunity to reduce cost and weight whileimproving fire resistance

TechnicalIssues

Fire, cost, supportability

Previous Work Currently use Nomex/phenolic sandwich

Return onInvestment

Medium

Webcore Hybrid Fabric-Web/Strut-Web

Core with Pre-Attached Fabric Proposed for Navy

SBIR Door Project

Components

Page 12: Presentation Overview • Primary Hull Structure • Minehunters

12Eric Greene

Bulwarks

Priority Low

Opportunity Potential to reduce weight and maintenance

TechnicalIssues

Not suitable for retrofit

Previous Work LPD 17 design calls for composite bulwarks

Return onInvestment

Low

Bulwark Structure onLPD-17 under Construction and USS

INGRAHAM (FFG 61)

Components

Page 13: Presentation Overview • Primary Hull Structure • Minehunters

13Eric Greene

Cable Passage Tubes

Priority Medium

Opportunity Reduced maintenance and ease of handling

TechnicalIssues

Fire and watertight certification

Previous Work

Return onInvestment

Medium

Bulkhead Example of Nelson Firestop Multi-Plug Tested to

US Navy Standards(DoD-Std-2003)

Components

Page 14: Presentation Overview • Primary Hull Structure • Minehunters

14Eric Greene

Cable Hangers

Priority Medium

Opportunity Potential to reduce weightand maintenance

TechnicalIssues

Fire

Previous Work

Return onInvestment

MediumSingle Cable Composite Pedestal Cable Hanger

[Dennis Conroy & Larry Murphy, NSWCCD Code 823]

Components

Page 15: Presentation Overview • Primary Hull Structure • Minehunters

15Eric Greene

CHT Systems

Priority High

Opportunity Eliminate severe corrosion and makemaintenance easier

TechnicalIssues

Fire; integrate with existing system elements

Previous Work Navy has fielded prototype compositesystems. The U.S. Navy is now specifyingGRP (fiberglass) piping and ladders for useinside the CHT tank, as this material holdsup extremely well in the sewageenvironment.

Return onInvestment

Medium

U.S. Navy Type III Marine Sanitation Device [US Navy Shipboard Environmental Information

Clearinghouse]

Components

Page 16: Presentation Overview • Primary Hull Structure • Minehunters

16Eric Greene

Condensate Drains

Priority Medium

Opportunity Reduce corrosion and related maintenance

TechnicalIssues

Fire

Previous Work

Return onInvestment

High

Intake Fan Room/Plenum Drain on USS INCHON (MCS12), Dec 2000.

[Capital Investment for Labor Machinery Space Ventilation Program,

Norm Clayton & John Miller,NSWCCD Codes 624 & 9213]

Components

Page 17: Presentation Overview • Primary Hull Structure • Minehunters

17Eric Greene

Counter Measure Washdown Piping

Priority High

Opportunity Aluminum tubing subject to corrosion andfouling

TechnicalIssues

Demonstrate survivability of compositesystem

Previous Work Fleet currently planning on replacing withCuNi system

Return onInvestment

High

Images of Topside Counter

Measure Washdown

[Photograph by Robert Benson

(above) and Cathy A.

Brenneman(below)]

Components

Page 18: Presentation Overview • Primary Hull Structure • Minehunters

18Eric Greene

Deck Grating

Priority High

Opportunity Eliminate corrosion and related maintenanceand safety issues

TechnicalIssues

Fire and strength

Previous Work ERM-7 has fielded composite grating on 4ships; numerous unauthorized replacementsin the fleet.

NAVSEA Drwg 803-6983499, GRP DeckGrating specifies MODAR resin – partsexpected to be in supply system late FY 03

Return onInvestment

High

Composite Deck Grating onFFG-58 USS Samuel B. Roberts

Components

Page 19: Presentation Overview • Primary Hull Structure • Minehunters

19Eric Greene

Door Hinges

Priority High

Opportunity Eliminate severe corrosion; makemaintenance and operation easier

TechnicalIssues

Fire, operability and strength

Previous Work Ken Brayton, NAVSEA 05P7 has led SBIR &other efforts to develop composite closures& mechanisms

Return onInvestment

High

Watertight Door Showing Wear Due to Hinge

Misalignment (above) and Corrosion (below)

Components

Page 20: Presentation Overview • Primary Hull Structure • Minehunters

20Eric Greene

Doors

Priority High

Opportunity Corrosion, weight, stealth & ease ofoperation

TechnicalIssues

Fire & strength

Previous Work Prototypes have been developed by Ingallsand Webcore

Return onInvestment

High E-Glass/Vinyl Ester-PaneledDoor Built by Ingalls used inManTech Topside Project

Components

Page 21: Presentation Overview • Primary Hull Structure • Minehunters

21Eric Greene

Electrical Enclosures

Priority High

Opportunity Reduce corrosion and related maintenance

TechnicalIssues

Fire and impact resistance

Previous Work ERM-7 is in the process of certifying ULTEM2300 electrical enclosures

Return onInvestment

High

Typical Corrosion-Related Failure (above) and ULTEM 2300 Box

Molded by Glenair (below)

Components

Page 22: Presentation Overview • Primary Hull Structure • Minehunters

22Eric Greene

Fairings

Priority High

Opportunity Metal rope guards difficult to replaceunderwater

TechnicalIssues

Fastener interface

Previous Work Composite propulsion shaft rope guardsinstalled on Aircraft Carriers showing:

• Less than ½ the cost and weight oforiginal Cu-Ni

• Bolt-on vs. weld-on• Easy waterborne removal/install gives full

access to stave bearings & zincs

Return onInvestment

High

Installed Composite Fairwaters (NAVSEA 05M3)

Components

Page 23: Presentation Overview • Primary Hull Structure • Minehunters

23Eric Greene

Fans & Blowers

Priority High

Opportunity Reduced corrosion, easier to maintain &quieter

TechnicalIssues

Fire, operability and strength

Previous Work NAVSEA PMS 400D32 is pursuingcomposite fans via SBIR & ManTechprograms

Return onInvestment

High

Typical Axial Fan

Components

Page 24: Presentation Overview • Primary Hull Structure • Minehunters

24Eric Greene

Foundations

Priority High

Opportunity Severe corrosion on saltwater pumpfoundations is major maintenance issue andcontributes to machinery vibration; potentialto make machinery "quieter"

TechnicalIssues

Fire and shock

Previous Work Brunswick Defense built a filament-woundfoundation that was tested at NSWCCD

Return onInvestment

Medium

Filament Wound Machinery Foundation by Brunswick Defense

Components

Page 25: Presentation Overview • Primary Hull Structure • Minehunters

25Eric Greene

Funnels & Deck Drains

Priority Medium

Opportunity Potential to reduce weight and maintenance

TechnicalIssues

Interface to metal structure

Previous Work ERM-7 has awarded SPARTA a contract tobuild prototype Type D deck drains. Type Ais scheduled for development in FY 04.

Return onInvestment

High

Type “A” Deck Drain

Typical Navy Funnels[Dolsey Ltd., Norfolk, VA]

Components

Page 26: Presentation Overview • Primary Hull Structure • Minehunters

26Eric Greene

Gear Cases

Priority Low

Opportunity Reduce weight and make machinery quieter

TechnicalIssues

Strength, creep and high temperatureperformance

Previous Work Some "high end" work done by DTRC,Annapolis

Return onInvestment

LowExample of Reduction Gear Arrangement

for DDG 51 Class Where Each of the Ship's Two Propellers is Driven GE

Multiple-Input Reduction Gear Powered by Two GE Gas Turbines

Components

Page 27: Presentation Overview • Primary Hull Structure • Minehunters

27Eric Greene

Handrails

Priority Medium

Opportunity Reduce maintenance and electronicinterference

TechnicalIssues

Cost and UV resistance

Previous Work Some isolated topside use

Return onInvestment

MediumA Sailor uses a Pneumatic Sander to Prepare Metal

Handrail for Painting Preservation

Components

Page 28: Presentation Overview • Primary Hull Structure • Minehunters

28Eric Greene

Hatches

Priority High

Opportunity Reduced weight improves ease of operation;reduce maintenance; and improve stealth

TechnicalIssues

Hardware operability and fire resistance

Previous Work Ingalls’ door with composite panel; WebcoreSBIR project: UCSD cargo door

Return onInvestment

High

Scuttle Hatch Locking Device (above) and Lifting Assist

Mechanism (below)[Ken Brayton, 05P7]

Components

Page 29: Presentation Overview • Primary Hull Structure • Minehunters

29Eric Greene

Heat Exchangers

Priority Medium

Opportunity Reduce corrosion and fouling

TechnicalIssues

Increase thermoconductivity at reasonablecost

Previous Work NSWC, Annapolis developed carbon epoxylaminates with conductive additives thatperformed better than Cu-Ni

Return onInvestment

Medium

Example of Fouled Heat Exchanger Head Inlet (above) [ERM, Fred Tsao, 05L] and

Relative Effectiveness of Composites (below) [Joseph Korczynski, NSWCCD]

Components

Page 30: Presentation Overview • Primary Hull Structure • Minehunters

30Eric Greene

Helicopter Hanger Doors

Priority High

Opportunity Reduced corrosion maintenance andmachinery maintenance from less weight

TechnicalIssues

Strength and fire resistance

Previous Work Seemann Composites and BIW havedeveloped a composite helicopter door forDDG 51 Flt IIA. A composite helicopterhanger is scheduled to be installed on DDG-100.

Return onInvestment

Medium

Composite Helicopter Hanger First Article Door (above) and Operational Test Jig

(below) [Seemann Composites]

Components

Page 31: Presentation Overview • Primary Hull Structure • Minehunters

31Eric Greene

Helicopter Net Frames

Priority High

Opportunity Reduce corrosion and weight

TechnicalIssues

Certification

Previous Work Frames changed from flame sprayed steelto CRES on DDG 79 and later; safety netcomponent hardware modified to CRESmaterial

Return onInvestment

High

Helicopter Net Frameson the USS Thach (FFG-43)

Components

Page 32: Presentation Overview • Primary Hull Structure • Minehunters

32Eric Greene

Insulation

Priority Medium

Opportunity Reduce weight and maintenance.

TechnicalIssues

Cost

Previous Work Polyimide foam certified as fire-safeinsulation. The replacement of fiberglasswith polyimide foam hullboards on USN CG47 Class cruisers produced a weightreduction of approximately 50 tons.

Return onInvestment

Medium

Inspec Foams’ Thermal Hullboard for MIL-I-742 Type Applications with Glass Cloth

Laminated to SOLIMIDE®

Thermal Insulation Foam Weighing 0.15 lbs/ft2 at 1"

Thickness [Inspec]

Components

Page 33: Presentation Overview • Primary Hull Structure • Minehunters

33Eric Greene

Ladders

Priority High

Opportunity Corrosion elimination and enhanced safety

TechnicalIssues

Cost and functionality

Previous Work Some isolated topside use of composites

Return onInvestment

High

Composite Ladder LocatedTopside on FFG-58,

the USS Samuel B. Roberts

Components

Page 34: Presentation Overview • Primary Hull Structure • Minehunters

34Eric Greene

Life Rails & Lines

Priority High

Opportunity Reduce maintenance and electronicinterference

TechnicalIssues

Cost and UV resistance

Previous Work Some isolated topside use

Return onInvestment

Medium

Life Rails & Lines Located Topside on FFG-58, the USS Samuel B. Roberts

and the USS Gary (FFG-51)

Components

Page 35: Presentation Overview • Primary Hull Structure • Minehunters

35Eric Greene

Louvers

Priority High

Opportunity Reduce maintenance and improve stealth

TechnicalIssues

Cost, certification and durability

Previous Work Composite louvers developed for the DDG51 class destroyers

Return onInvestment

High

Radar Absorbing Composite LouverDeveloped for the

DDG 51 Class Destroyers

Components

Page 36: Presentation Overview • Primary Hull Structure • Minehunters

36Eric Greene

Mast Stays & Lines

Priority Medium

Opportunity Reduce weight, electronic interference andmaintenance

TechnicalIssues

End fittings and overall cost

Previous Work Used on recreational sailboats

Return onInvestment

High

Mast Arrangement on USS Elrod (FFG 55)Showing Stays and Lines

Components

Page 37: Presentation Overview • Primary Hull Structure • Minehunters

37Eric Greene

Masts

Priority Medium

Opportunity Improve equipment supportability

TechnicalIssues

Cost

Previous Work AEM/S on USS Radford and LPD-17

Return onInvestment

Low

Advanced Enclosed Mast Systemfor LPD 17 Class Ships

Components

Page 38: Presentation Overview • Primary Hull Structure • Minehunters

38Eric Greene

Motor Housings

Priority Low

Opportunity Improve equipment supportability

TechnicalIssues

Shock qualification

Previous Work

Return onInvestment

Low

Examples of Typical Electric Motor Housings

Components

Page 39: Presentation Overview • Primary Hull Structure • Minehunters

39Eric Greene

Pipe Hangers

Priority High

Opportunity Eliminate corrosion and reduce pipevibration

TechnicalIssues

Cost and fire

Previous Work All hangers in weather, passagewaysto weather, in the mast, uptakes and dirtyside of CPS fan rooms have been changedto CRES 316L material on DDG 77 and later

Return onInvestment

High

Navy Type 1 and Type 2 Hangers[Dolsey Ltd., Norfolk, VA]

Components

Page 40: Presentation Overview • Primary Hull Structure • Minehunters

40Eric Greene

Piping

Priority High

Opportunity Eliminate corrosion related maintenance:reduce weight & vibration

TechnicalIssues

Cost and fire

Previous Work Numerous offshore installations and Navyprototypes waiting congressional plus-up

Return onInvestment

High

Ameron’s Bondstrand® 2000USN MIL-P-24608 Pipe Assembly Weighs 3.6 pounds

Compared to 6.8 pounds for CuNi

FIBERBOND® Pipe Shown to Withstand 2000ºF Fires [EDO Specialty Plastics]

Components

Page 41: Presentation Overview • Primary Hull Structure • Minehunters

41Eric Greene

Plenums

Priority High

Opportunity Eliminate severe corrosion and associatedmaintenance

TechnicalIssues

Cost and fire

Previous Work Plastic turning vanes have been fielded on alimited basis

Return onInvestment

HighProposed FFG Composite Plenum for 1180 CFM Nat Supply Aux Mchry Rm # 3, Helo Hgr #2, 1-278-2-Q

Components

Page 42: Presentation Overview • Primary Hull Structure • Minehunters

42Eric Greene

Propellers

Priority Low

Opportunity Potential to make propellers quieter

TechnicalIssues

Strength and cost

Previous Work Existing systems for large yachts and R&Dwork on underwater propulsors

Return onInvestment

Low

The Contur® Propeller with Exchangeable Composite Blades

Offered by AIR Fertigung-Technologie GmbH, Germany

Components

Page 43: Presentation Overview • Primary Hull Structure • Minehunters

43Eric Greene

Propulsion Shafting

Priority Medium

Opportunity Reduce vibration, weight and corrosionmaintenance

TechnicalIssues

Interface to metal couplings and cost

Previous Work Commercially available for high speed craft,NSWC Annapolis prototype work on AOE &subs

Return onInvestment

Medium

33 inch Diameter Filament WoundSection of Propulsion Shafting

Developed by DTRC, Annapolis for Testing to Meet AOE-Class Performance Requirements

[George Wilhelmi]

Components

Page 44: Presentation Overview • Primary Hull Structure • Minehunters

44Eric Greene

Pump Internals

Priority High

Opportunity Increase mean time between failure andreduce time to repair

TechnicalIssues

Standardization of U.S. Navy pumppopulation

Previous Work ERM-7 has fielded composite pumpinternals on 19 ships

Return onInvestment

High

Navy Shock-Qualified CompositePump Internals Built by Flowserve

Components

Page 45: Presentation Overview • Primary Hull Structure • Minehunters

45Eric Greene

Pumps

Priority High

Opportunity Reduce corrosion, much quicker to repairand quieter

TechnicalIssues

Cost and standardization of U.S. Navy pumppopulation

Previous Work ERM-7 has funded production of 1 sizepump, ManTech effort pending

Return onInvestment

High

Navy Shock-Qualified CompositePump Built by Flowserve and Installed

as Part of the Navy’sSMARTSHIP Program

Components

Page 46: Presentation Overview • Primary Hull Structure • Minehunters

46Eric Greene

Retractable Bitts & ChocksPriority Medium

Opportunity Corrosion related maintenance and safety –corroded bitts difficult to retract

TechnicalIssues

Certification

Previous Work The following modifications have been madeto retractable bitts on DDG 79:• Modified surface preparation requirements• Improved Bar Rust coating system• Revised PMS MRC to require more

frequent maintenance• Drain lines installed in bitt chambers Bar

Rust coating on DDG 79 Bitts

Return onInvestment

Medium

Typical Retractable Bitt Showing Corrosion from Mooring Line Wear

and Standing Water

Components

Page 47: Presentation Overview • Primary Hull Structure • Minehunters

47Eric Greene

Saltwater Piping

Priority High

Opportunity Potential to reduce corrosion, fouling andvibration problems

TechnicalIssues

Fire & certification

Previous Work Many offshore installations and proposedU.S. Navy use pending congressional plus-up

Return onInvestment

High Composite Pipe Installed in Severe Saltwater Ship Environment (Ameron®)

Components

Page 48: Presentation Overview • Primary Hull Structure • Minehunters

48Eric Greene

Seachest Strainers

Priority High

Opportunity Reduce corrosion and integrate antifoulingagent

TechnicalIssues

Integrate effective, environmentally-friendlyantifouling

Previous Work PMS 400F funding pilot program

Return onInvestment

High

Fouled SeachestStrainer (top) Cutout

(middle) and Prototype

Composite Strainer (bottom)

Components

Page 49: Presentation Overview • Primary Hull Structure • Minehunters

49Eric Greene

Shafting OverwrapsPriority High

Opportunity Current manual method labor intensive andnot durable. All shafting exposed toseawater must be coated to preventcorrosion, which can lead to fatigue failure.Glass Reinforced Plastic (GRP) (inaccordance with MIL-STD-2199) consists offour alternately wrapped layers of fiberglasscloth and Phillyclad 1775/620 resin.

TechnicalIssues

Environmentally-compliant process; bond tosteel; durability

Previous Work NNS currently funded as ManTech project

Return onInvestment

High

Main Propulsion Shafting General Arrangement [SupSalv]

Components

Page 50: Presentation Overview • Primary Hull Structure • Minehunters

50Eric Greene

Stacks

Priority Low

Opportunity Potential to reduce topside weight andintegrate sensors

TechnicalIssues

Cost precludes retrofit

Previous Work Ingalls completed Low Observable Stackproject

Return onInvestment

Low Low Observable Multifunction Stack Concept [ONR]

Components

Page 51: Presentation Overview • Primary Hull Structure • Minehunters

51Eric Greene

Stair Treads

Priority Medium

Opportunity Corrosion elimination and enhanced safety

TechnicalIssues

Fire

Previous Work Some unauthorized installations

Return onInvestment

Medium

Topside Example of Stair Treads onthe USS Samuel B. Roberts Showing

Wear of Painted Finish

Components

Page 52: Presentation Overview • Primary Hull Structure • Minehunters

52Eric Greene

Stanchions

Priority Medium

Opportunity Reduce corrosion and weight

TechnicalIssues

Cost & functionality

Previous Work Some topside applications utilized productswith insufficient strength and UV protection.

Improved polyurethane/E-glass compositestanchions are currently installed on acarrier for evaluation. These stanchions canbend 90° and spring back to original shape.

Return onInvestment

MediumTopside Example of Stanchion on

the USS Samuel B. Roberts ShowingSurrounding Deck Grating

Components

Page 53: Presentation Overview • Primary Hull Structure • Minehunters

53Eric Greene

Stowage Lockers

Priority High

Opportunity Reduce corrosion, weight & condensation

TechnicalIssues

Fire

Previous Work Some commercially available products

Return onInvestment

Medium

Damage Controlman Checks Fit of a Self Contained Breathing

Apparatus (SCBA) from a Damage Repair Locker

Components

Page 54: Presentation Overview • Primary Hull Structure • Minehunters

54Eric Greene

Tanks

Priority High

Opportunity Reduce corrosion especially with saltwater &sewage systems - Tank and Voidpreservation has been reported by the TypeCommanders as their single largestmaintenance burden.

TechnicalIssues

Fire and certification

Previous Work Some prototype sewage treatment systemson carriers

Return onInvestment

High

Current Tank Coatings after 36 Months [ERM, Beau Brinckerhoff, 05M]

Components

Page 55: Presentation Overview • Primary Hull Structure • Minehunters

55Eric Greene

Tank Vents

Priority High

Opportunity Reduce corrosion maintenance and weight

TechnicalIssues

Fire and certification

Previous Work

Return onInvestment

High

Topside Example of

Corroded Tank Vent on

the USS Samuel B.

Roberts

Tank Vent System

on the USNS

Comfort

Components

Page 56: Presentation Overview • Primary Hull Structure • Minehunters

56Eric Greene

Topside Personnel Protection

Priority High

Opportunity FFG role for homeland security mayincrease vulnerability of topside personnel

TechnicalIssues

Cost, stowability & performance

Previous Work Kevlar®-reinforced systems have beenfielded on a limited basis, including USSRadford (DD-968) under MAC ALT 384 forup to forty ships supporting Desert Storm

Return onInvestment

High

Machine Gun Installation on the USS Elrod(FFG 55) and Armor Frames [MAC ALT 384]

Components

Page 57: Presentation Overview • Primary Hull Structure • Minehunters

57Eric Greene

Topside Superstructure

Priority Medium

Opportunity Potential for in-situ repair of chronicaluminum deckhouse corrosion areas

TechnicalIssues

Fire and bond to aluminum

Previous Work Numerous prototype systems developedincluding MARITECH, Helo Hanger andManTech projects

Return onInvestment

Low

MARITECH Composite Superstructure Project Built by

Structural Composites and Ingallsusing Adhesive Technology

Components

Page 58: Presentation Overview • Primary Hull Structure • Minehunters

58Eric Greene

Valves

Priority High

Opportunity Potential to extend service life, andsignificantly reduce maintenance andadverse mission impacts of corrosion-pronemetal components by using compositematerials. Potential to eliminate hydroblastcleaning of CHT system valves

TechnicalIssues

Shock qualification and fire

Previous Work Composite valves have passed shock test(NAVSEA drwg 803-6983491) and installedon 6 ships. The Capital Investment forLabor program plans on a major carrier CHTsystem installation.

Return onInvestment

High

Composite Ball-Valve Family Developed by

NSWCCD

Components

Page 59: Presentation Overview • Primary Hull Structure • Minehunters

59Eric Greene

Vent Screens

Priority High

Opportunity Eliminate corrosion related maintenance andimprove operability

TechnicalIssues

Fire

Previous Work ERM-7 has fielded composite vent screenson 13 ships. NAVSEA drwg 803-6983500,Vent Screen, GRP Installation and Detailswill lead to MODAR screens in the supplysystem by the end of FY 03.

Return onInvestment

High

Example of Vent Screen Fielded by

ERM-7

Components

Page 60: Presentation Overview • Primary Hull Structure • Minehunters

60Eric Greene

Ventilation Ducting

Priority High

Opportunity Eliminate corrosion related maintenance;improve ship air quality and improve shipavailability

TechnicalIssues

Cost

Previous Work NSWCCD and ManTech have fieldedprototype systems

Return onInvestment

High

Prototype Composite VentilationDuct System Built by Boeing and

Structural Composites Installed on the USS Samuel B. Roberts, FFG-58

Components

Page 61: Presentation Overview • Primary Hull Structure • Minehunters

61Eric Greene

Weapon System Enclosures

Priority High

Opportunity Eliminate corrosion related maintenance andimprove operability

TechnicalIssues

Certification

Previous Work ASROC housings were unsuccessfully builtwith aluminum-honeycomb core composite

Return onInvestment

HighExample of Severely Corroded ASROC Housing That Utilized

Aluminum Honeycomb

Components