presentation on the salient aspects of state data centre
TRANSCRIPT
Presentation on the
Salient Aspects of
STATE DATA CENTRE
General Overview
SDC is identified as one of the important element of the core infrastructure for supporting e-Governance initiatives of NeGP for consolidating services, applications and infrastructure to provide efficient electronic delivery of G2G, G2C and G2B services.
SDC would act as a central repository for consolidation of the disaggregated resources.
The physical space required for the Data Centre would be the responsibility of the State. The Back-End computerization of the Departments would be the responsibility of the State.
General Overview (Contd.)
The architecture of a Data Centre would be such as to provide a model environment capable of handling the typical business model of dynamic change supporting multiple G2G, G2C, G2B, B2C activities across all channels like CSCs, portals, kiosks etc.
A centralized management and monitoring system (tool) capable of doing fault management, configuration management, security management, report generation, alerting, monitoring the critical servers, log monitoring and Data Centre network and security infrastructure etc. would be part of the Data Centre.
General Overview (Contd.)The high availability is one of the critical requirements of the Data Centre. As the systems are centralized at Data Centre, the State would be required to establish appropriate Disaster Recovery and Business Continuity Plan (DR and BCP) along with appropriate data backup and recovery infrastructure. Initially, State should plan for off-site Back-up mechanism for their DR strategy and depending upon mission critical requirement the BCP requirement would be met through the design architecture of the primary Data Centre itself. The objective of the Scheme is to create a secure close user group (CUG) government network for the purpose of delivering G2G and G2C services.
General Overview (Contd.)
SDC scheme has been approved by Government with an outlay of Rs.
1623.20 Crores over a period of 5 years.
The Disaster Recovery (DR) arrangement has been envisaged to be
established and provided by NIC.
Components of the SSDCCAPEX Components
Site Preparation Support Infrastructure (HVAC, Fire Suppression and Detection, DG sets, UPS, Electrical works, Access Control & CCTV, BMS, Water Leak Detection System etc.)IT Infrastructure Routers, Network Switches, IPS, UPS, LAN Passive Components)Computing Resources(Web Servers, Application Servers, Storage, DB Servers)
OPEX ComponentsComponents in purview of the RFP
Facility Management Expenditure License and Software Cost
Components not in purview of the RFP
Administrative Costs Diesel Running Cost Electricity Running Cost Bandwidth Cost
Components of the SSDC(Contd.)
Salient Features of the RFP Eligibility Criteria Scope of Work Estimated Timelines Service Level Agreement Evaluation Criteria Solution Architecture Bill of Material Technical Specifications – IT Components Technical Specifications – Non IT Components Compliance Specifications
Salient Features of the RFP(Contd.)
Model on a Turnkey basis(Site Preparation, Operation and Maintenance)
Duration of the Project – 5 years
Submission of Pre-Qualification,Technical and Financial Bids
Selection Methodology – Quality cum cost based selection
Pre-qualification - Compliance to Eligibility Criteria ,Technical Evaluation (a minimum of 70 marks), Key evaluation parameters - Relevant past experience, solution / design & architecture proposed, solution scalability, SLA, manpower proposed etc.
Commercial bid - Quality-cum-Cost based selection
Service oriented approach SLAs for performance based monitoringPre-Qualification CriteriaTechnical Evaluation Crteria
SCOPE OF WORKBasic Infrastructure ServicesManaged Services Monitoring and Management Services Help Desk Services Server Monitoring (Hardware & Operating
System), Administration & Management Services Database Administration & Management Services Storage Administration & Management Services Security Administration Services Network Monitoring Services Back Up / Restore Services Vendor Management Services
Scope of Work (Contd.)Roles and Responsibilities during Operation & Maintenance Phase
Project Management System Administration & Management Storage Administration Security Administration Database Administration Application Monitoring, Maintenance &
Administration Change Management Help Desk and Monitoring Team
Other Important Salient Points
Bill of MaterialAmendments in the
Commercial ,Technical & Bid Process Specifications
Manpower Resources Timelines
Implementation Schedule
Site Progress Update up to 30th Sept 2010 for the Sikkim State Data Centre
Work Completed
Civil
• Fire Retarded Door Installation Work• Insulation work in Server Farm area - True Ceiling
& True Floor• Granite flooring work in office area • False flooring in Server, NOC & UPS room• False ceiling in Server room and office area• Gypsum Board partition • One coat of non fire rated color completed in
office area. • DG foundation• Guard wall behind DG foundation• One coat applied on external walls
Electrical & BMS• Electrical Conduiting and Cabling, • LT Panel, UPS, PDU, AMF panel & battery
rack positioning.• 20 Nos. Earth Pits completed. • Lighting Fixture Installed and green • SDC Internal cabling for LT Panel, UPS & PDU• Cable tray for DG & Transformer power
cables• PAC Indoor - Outdoor units installed, copper
piping & Pressure testing Completed• CAC outdoor units installed, copper piping
Completed. • Cabling for CCTV, Access control, Smoke
detectors • VESDA and Gas suppression piping tested• Conduiting for rodent repellent system
• Electrical Conduiting and Cabling, • LT Panel, UPS, PDU, AMF panel & battery
rack positioning.• 20 Nos. Earth Pits completed. • Lighting Fixture Installed and green • SDC Internal cabling for LT Panel, UPS & PDU• Cable tray for DG & Transformer power
cables• PAC Indoor - Outdoor units installed, copper
piping & Pressure testing Completed• CAC outdoor units installed, copper piping
Completed. • Cabling for CCTV, Access control, Smoke
detectors • VESDA and Gas suppression piping tested• Conduiting for rodent repellent system
Work Completed
Work to be Complete / In progress
Civil
Fire rated area paint & painting of outside walls.Aluminum frame door installation for cabins.
NOC room fire rated glass installation Furniture laminated sheet work. Installation of Racks
Electrical & BMS
Transformer & DG Cabling to LT panel. LT Panel connectivity, Battery installation, UPS connectivity DG Installation BMS equipments and panel installation
Material Delivery Status
Material Delivered as on date
• Civil Work related materials, Doors, Furniture Items, False Floor & Ceiling.• Electrical Work related material, PAC, CAC, UPS, LT Panel, PDU, Racks,
Novec Gas Cylinder.• Licenses from Microsoft, Red Hat, SQL & Oracle• IT Hardware & networking (IBM Servers, SAN, SAN Switches, 3-Com
Network Equipments)
Material under dispatch / In Transit
• DG Sets, BMS equipment and panels• Chairs for SDC. NOC Room Fire rated vision glass.• Syslog server
Current Challenges
• Water seepage issue in UPS room coming from third & second floor.
• DG Foundation area road clearance for DG installation.
Currently two temporary canteens are located there.
• SDC wants to remove canteens and install DG from15th to 19th Oct 2010 being holidays.
Lighting Fixture and False Ceiling
AMF Panel Positioning and Incomer cable Ladder Tray
Fire Rated Doors.
Furniture
PAC and PDU Positioning
THANK YOU