EQUIPMENT SUPPORT INSTALLATIONELECTRICAL & INSTRUMENTATION
Date: 29th Feb 2012
EXTERNAL SERVICE BAY SUPPORT
Rework carried out to install the electrical equipment supports at external service bay after completion of final painting.
EXTERNAL SUPPORT ON WALL
Electrical supports at accommodation unit service bay area with long piece of angles. These type of long angle supports shall be avoided due to non-accessibility of welded area for painting/blasting and chances of water accumulation.
EXTERNAL EQUIPMENT SUPPORTS
EXTERNAL EQUIPMENT SUPPORTS
EXTERNAL SERVICE BAY SUPPORT
Rework carried out to install the cable tray supports & earth boss at external service bay after completion of painting.
EXTERNAL CABLE TRAY SUPPORTS
EARTH BAR INSTALLATION
TYPICAL SUPPORT INSTALLATION
Additional supports requirement after painting of unit can be done by using pop-nut & unistrut to avoid paint/ insulation damage due to welding.
PIPE PENETRATION
Rework carried out to install the pipe penetration for fire suppression system after completion of painting.
INTERNAL CEILING SUPPORT
Welding of electrical supports for ceiling light after completion of internal insulation.
INTERNAL CEILING SUPPORT
Welding of electrical supports after completion of internal insulation.
INTERNAL CEILING SUPPORT
Welding of electrical supports after completion of internal insulation and support arrangement for ceiling light installation.
INTERNAL CEILING SUPPORT FOR LIGHT
Welding of electrical supports after completion of internal insulation and support arrangement for ceiling light installation.
INTERNAL CEILING SUPPORT FOR LIGHT
Welding of electrical supports after completion of internal insulation and support arrangement for ceiling light installation.
INTERNAL CEILING SUPPORT FOR LIGHT
Welding of electrical supports after completion of internal insulation and support arrangement for ceiling light installation.
INTERNAL CEILING SUPPORT FOR LIGHT
Welding of electrical supports after completion of internal insulation and support arrangement for ceiling light installation.
CEILING SUPPORTS
CEILING SUPPORTS
SUPPORTS ON WALL PANEL
BULKHEAD LIGHT INSTALLATION
EQUIPMENT INSTALLED ON INTERNAL WALL
INTERNAL SUPPORT ON CEILING
Welding of electrical supports after completion of internal insulation and support arrangement for ceiling light installation.
INTERNAL SUPPORT ON WALL
Insulation removed for welding of electrical supports after completion of internal insulation.
INTERNAL SUPPORT ON WALL
Insulation removed for cable tray supports welding after completion of internal insulation.
INTERNAL CABLE TRAY SUPPORT ON WALL
INTERNAL CABLE TRAY
Cable tray installed on insulated wall.
CPFG PANEL SUPPORT- WALL RECESS TYPE
CPFG PANEL SUPPORT- WALL SURFACE TYPE
DISTRIBUTION PANEL SUPPORT- WALL RECESS TYPE
DISTRIBUTION PANEL SUPPORT- WALL SURFACE TYPE
LIGHT SUPPORT ON PROCESS SKID
LIGHT SUPPORT ON PROCESS SKID
EQUIPMENT SUPPORT ON PROCESS SKID
CONDUIT SUPPORTS ON PROCESS SKID
SUMMARY
1. MAKE SURE THAT ALL WELDED TYPE SUPPORT / PENETRATION REQUIREMENT SHALL BE INDICATED ON THE STRUCTURAL DARWING AND ALSO UPDATE ON THE AS-BUILT DRAWINGS AS PER FINAL SITE INSTALLATION.
2. IF ANY ANGLE SUPPORTS WELDED FOR EXTERNAL AREAS SHALL BE ALWAYS IN VERTICAL ORIENTATION INSTEAD OF HORIZONTAL TO AVOID WATER ACCUMULATION AT WELDED AREAS.