WE CREATE WE CREATE SPACESPACE

Page 2: PRESENTATION - Modular Direct

WE’VE BUILT ON OUR WE’VE BUILT ON OUR SUCCESSSUCCESS

Creating more space has never been so easy. Modular

Direct has more than 40 years of industry experience. Our prime objective is to help satisfy all of your portable and modular accommodation requirements – on time and to budget.

Our dedicated sales team will guide you through every stage of the consultation process from the initial enquiry through to delivery and installation. You will also receive an after-sales service that is second to none.

Page 3: PRESENTATION - Modular Direct

CREATE YOUR OWN SPACECREATE YOUR OWN SPACE

Portable and modular buildings are designed to

accommodate additional space requirements across a broad spectrum of industries. From commercial offices to healthcare centres and education establishments to leisure facilities, Modular Direct has a suitable workspace solution.

Page 4: PRESENTATION - Modular Direct

Various External FinishesVarious External Finishes

Page 5: PRESENTATION - Modular Direct

Case StudyCase StudyLocated in the London Borough of Bexley and commissioned by a local Private School, this two storey Prefabricated Building now provides twelve additional classrooms to the existing school complex.The Buildings are permanently connected and linked at both levels to the existing Victorian school building. Externally the building is clad with “brick slips” to match the existing school brick work. The roof is clad with a bespoke 20 degree pitched roof clad with matching roof tiles and 10 No Velux opening roof lights.Internally the building is partitioned to accommodate the preferred classroom layout and is clad with easily maintained vinyl faced plasterboard to walls and ceiling. Also provided are 2 no internal timber staircases, a disabled lift and a sound reducing concertina partition. A hot / cold air conditioning system keeps the fully carpeted classrooms at a constant temperature whilst the building is fully equipped with IT, fire and intruder alarms.“Seamlessly blending the latest building technology with the Victorian era”

Page 6: PRESENTATION - Modular Direct

Located in Gillingham, Kent and commissioned by the local Authority this purpose built 6 bay Modular Buildings now provides a modern, safe and much needed “double classroom block,” to the school.

The Building has a total floor area of 167 sq metres and incorporates two classroom areas each providing 60 sq metres of teaching space, 2No children’s toilet blocks, stationery stores, entrance lobby and steel security door to the main entrance.

A hot / cold air conditioning system keeps the fully carpeted classrooms at a constant temperature. The suspended ceiling which provides a 43 Db acoustic rating (BB93 compliance for schools) and incorporates recessed lights operated by PIR movement sensors c/w day light links.

Externally the walls of this Modular Classroom building are finished in easily maintainable plastisol steel and the roof is constructed with a mono pitched flat roofing system covered with a hard wearing “Hypalon” blanket.

This Modular building was supplied and installed during the Summer Break to minimise disruption to the school calendar and the Health and Safety risks to both children and staff.

Case Study

Page 7: PRESENTATION - Modular Direct

Case Study

Located in Sevenoaks, Kent and commissioned by a local Primary School these purpose built 7 bay Modular Buildings now provide two additional “double classroom blocks,” to the school.Each building provides a total floor area of 162 sq metres and incorporates two classroom areas each providing 60 sq metres of teaching space, fully equipped and DDA compliant disabled toilet, 2No children’s toilets, stationery stores, entrance lobby and steel security door to main entrance. A hot / cold air conditioning system keeps the fully carpeted classrooms at a constant temperature whilst the children play and learn. Externally the walls of these Modular Classroom buildings are finished in easily maintainable plastisol steel and the roof is constructed with a mono pitched flat roofing system covered with a hard wearing “Hypalon” blanket.The buildings were supplied and installed during the Summer Break to minimise disruption to the school calendar and the Health and Safety risks to both children and staff.

Page 8: PRESENTATION - Modular Direct

Case Studies – Kent ProjectCase Study – Modular Single Classroom Building Located in Langton Green, Kent and commissioned by a local Primary School this purpose built 3 bay Modular Buildings now provides a modern, safe and much needed “single classroom block,” to the school.This Prefabricated Building provides a total floor area of 86 sq metres and incorporates one classroom areas providing 62 sq metres of teaching space, children’s toilets, equipment store, entrance lobby and steel security door to the main entrance. A hot / cold air conditioning system keeps the fully carpeted classrooms at a constant temperature whilst the children play and learn. Externally the walls of this Modular Classroom building are finished in a very attractive cedar cladding which blends in superbly with its surroundings. The roof is constructed with a mono pitched flat roofing system covered with a hard wearing “Hypalon” blanket. An excellent light and airy environment to enable the children to take their first steps in the learning process. This Modular building was supplied and installed during the summer break to minimise disruption to the school calendar and the Health and Safety risks to both children and staff. The building was delivered, connected and commissioned within three days on site.

Page 9: PRESENTATION - Modular Direct

Case Studies – Kent Project

Located in Kent and commissioned by the Local Authority this purpose built prefabricated Dance Studio now offers the local community the much needed dance facilities they require.

This Modular Building provides 135 sq metres of usable dance space although a floor to ceiling folding partition enables the area to be sub divided for smaller and separate classes. One 18 metre long wall carries continuous 2 metre high posture mirrors and the floor is covered with “Polyflor Sport” vinyl floor covering. A hot / cold air conditioning system keeps the room at a constant temperature.

Externally the walls are finished in easily maintainable plastisol steel and the roof boasts a 20 degree pitch - weatherproofed with a Britmet roofing system.

Whether it’s ballet, ballroom, modern or line dancing – they are all catered for and since opening the bookings register is full.

Page 10: PRESENTATION - Modular Direct

Buildings for Education

Page 11: PRESENTATION - Modular Direct

Other Education BuildingsOther Education BuildingsLocated in Swanwick, Derbyshire and commissioned by the Local Authority this purpose built 5 bay Modular Building now provides a modern, safe and much needed additional “double classroom block,” to the school. This Prefabricated Classroom Building provides a total floor area of 165 sq metres and incorporates two classroom areas each providing over 60 sq metres of teaching space, fully equipped and DDA compliant disabled toilet, 2No children’s toilets, stationery stores and 2No aluminium external doors.

Page 12: PRESENTATION - Modular Direct

Other Education BuildingsOther Education Buildings

Page 13: PRESENTATION - Modular Direct

Sport & LeisureSport & Leisure

Page 14: PRESENTATION - Modular Direct

Sport & LeisureSport & Leisure

Page 15: PRESENTATION - Modular Direct

Sport & Leisure

Page 16: PRESENTATION - Modular Direct

ClientsClients

Page 17: PRESENTATION - Modular Direct

BenefitsBenefits Accelerated Construction Process

Fast delivery. • Modular buildings can be constructed in up to half the time as buildings built

completely onsite.

• Buildings can be occupied sooner and owners will see a faster return on investment.

Quality Built • Built with all the same materials and to the same building codes and architectural

specifications as onsite construction.

• Able to withstand travel and installation requirements, creating a building that can be more durable than structures built onsite.

Sustainable

Less Material Waste Less Site Disturbance

Greater Flexibility and Reuse Improved Air Quality

Page 18: PRESENTATION - Modular Direct

Approach to the Design of Approach to the Design of Sustainable BuildingsSustainable Buildings

The environmental impact of a building is becoming an increasingly

important consideration.

Choice of materials used, construction, occupation and what happens at the end of the building’s life are all factors for sustainable buildings.

  Off-site construction is an environmentally friendly way to build, with

advantages over traditional construction in terms of performance, and both economic and social benefits throughout the life of a building.

   Building Construction  Due to the tight tolerances required in factory production, the

performance of a finished modular building can be more energy efficient and have lower running costs than a traditionally constructed building.

Page 19: PRESENTATION - Modular Direct

Building Occupation

  Factory production ensures that sustainable buildings are constructed to very tight tolerances which means that the building is significantly more energy efficient than traditionally built buildings with lower running costs and less carbon emissions.

  End of Life

There are a number of options for the future of a modular building.  The building can be re-fitted and used as a new facility, without the full cost usually experienced.  Our modular buildings can be removed off site and refitted which would leave the site clear for an alternative use, protecting site value, and re-using the entire building, providing an environmentally friendly, genuinely sustainable building.  Any elements of the sustainable building can be recycled.

Page 20: PRESENTATION - Modular Direct

AccreditationsAccreditations

Page 21: PRESENTATION - Modular Direct

We thank you for taking the time to look through this presentation and hope that our

building systems are of interest to you.

If there is anything we can help you with please do not hesitate to contact us.

Tel. 07801568637 or e-mail [email protected]

Page 22: PRESENTATION - Modular Direct

Temple Hill SchoolTemple Hill School

Award winner from Kier Construction