presentation in conjunction with sbm offshore
TRANSCRIPT
![Page 1: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/1.jpg)
© SBM Offshore 2013. All rights reserved. www.sbmoffshore.com
Francesco CriminisiKees Willemse
Iain Baxter
Offshore application of Gas to Liquid Technology to cut
flaring on FPSOs
![Page 2: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/2.jpg)
Agenda
2
1. Introduction to SBM
2. Compact GTL Technology
3. GTL on FPSO applications
4. Conclusions
![Page 3: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/3.jpg)
© SBM Offshore 2013. All rights reserved. www.sbmoffshore.com
Introduction to SBM
![Page 4: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/4.jpg)
The Company
5 Project execution centres
11 Shore bases
4 Representative offices
9.900 Employees
Lease Fleet15 FPSOs
2 FSOs
1 Semi Sub
1 MOPU
Performance
200 years of operations
99% Uptime
~5,000 Tanker Offloads
Financials FY 2013 in US$Turnover
Backlog
Market Cap
3,4 billion
23 billion
4,2 billion
SBM Offshore worldwide
![Page 5: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/5.jpg)
SBM Offshore
![Page 6: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/6.jpg)
7
SBM Gas solutions portfolio
FPSO with GTL
100 MMSCFD 300 MMSCFDGas Capacity
Environm
ent (
Hs)
>8m
<8m
Turrets for Large Scale FLNGs
Twin Hull FLNG external Turret
Twin Hull FLNG internal Turret
![Page 7: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/7.jpg)
2006 2007 2008 2009 2010 2011 2012 2013
8
7 Years of FLNG Development in SBM
Twin Hull™ ‐ Dual N2
Cash Maple ‐ SMRGeneric ‐ Niche
Prelude Turret
Generic ‐ SMR
Petrobras ‐ DMR
![Page 8: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/8.jpg)
Mid-scale Twin Hull FLNG
CO2 precooled Dual Nitrogen Cycle 12 months shorter schedule than newbuild FLNG18% lower cost than newbuild FLNG2 MTPA
![Page 9: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/9.jpg)
© SBM Offshore 2013. All rights reserved. www.sbmoffshore.com
Compact GTL Technology
![Page 10: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/10.jpg)
Process overview
11
Gas pretreatment
Steam Methane Reforming
CH4+H2OCO+H2
Fischer TropshCO+H2 CnH2n+2
Mercury, Sulphur, Nickel
Heating Cooling
Liquids
Natural Gas
H2 & Tail Gas
Catalytic reactionLow pressure
High Temperature
Catalytic reactionHigh pressure
Low Temperature
![Page 11: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/11.jpg)
Compact GTL Technology
12
Automated catalyst insertionand removal
Corrugated metallic catalyst inserts maximise active surface area
per channel
Brazed plate‐fin reactor construction minimises metal
content and weight
![Page 12: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/12.jpg)
Commercial Demonstration Plant Aracaju, Brazil 2010
Image shown courtesy of Petrobras
• > 2 years operations• > 90% availability• Project fully funded by Petrobras• Associated gas feed from offshore• Fully integrated GTL process• Commercial scale reactors –
Sumitomo• Catalysts – Johnson Matthey
Technology approval by
Petrobras 2011
© SBM Offshore & Compact GTL 2013. All rights reserve www.sbmoffshore.com & www.compactgtl.com
13
![Page 13: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/13.jpg)
Kazakhstan agreement signed for 3000bpd plant
7th March 2014: Memorandum of Cooperation between CompactGTL and Kazakhstan Ministry of Oil & Gas
• Cooperation to build the World’s First commercially deployed small scale GTL plant
• 3000bpd diesel production planned
• Reduction in flaring by over 300 MMcm/annum
• 12 months engineering
• Fully functioning by 2017
• Cost estimated at 300m USD
![Page 14: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/14.jpg)
What if we could put it in Offshore?
15
Gas pretreatment
Steam Methane Reforming
CH4+H2OCO+H2
Fischer TropshCO+H2CnH2n+2
Mercury, Sulphur, Nickel
Heating Cooling
Natural Gas
Tail Gas
Liquids
![Page 15: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/15.jpg)
Why FPSO with GTL?
GTL is an excellent Gas Disposal Alternativein an Offshore Application
Flaring Restrictions
New fields not allowed to flare
Existing fields risk shut-in or financial penalties
Gas Re-injection
High cost: in deep water can cost up to $250 million
Gas breakthrough risks, threat to reserves
Gas Infrastructure
Issues
High cost of pipelines in remote or deep water
Multi-party, complex infrastructure
16
![Page 16: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/16.jpg)
© SBM Offshore 2013. All rights reserved. www.sbmoffshore.com
GTL on FPSO applications
![Page 17: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/17.jpg)
Benefits of Integration
18
Separation & Pre‐
treatment
Steam Methane Reforming
Fischer Tropsh
Heating CoolingNatural Gas
Tail Gas
Synthetic Oil
Power generation
Fresh Water System
Process Heating
Common Utilities: Water Treatment, N2 generation, Cooling Water system,
Common Oil
Storage
Well Fluid
Swivel
Crude Oil
![Page 18: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/18.jpg)
Application of the concept: Extended Well Test
19
What is an Extended Well Test (EWT)?
• Confirms well productivity estimates / reservoir pressure behaviour / fluid properties
• But there is a strong drive from regulatory & environmentalauthorities to minimise flaring
• Current EWT may have production rates limits which seriouslylimit the EWT benefits
• EWT vessel with GTL no flaringmaximise EWT benefits
![Page 19: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/19.jpg)
Application of the concept: Full Field Development
Remote (>100 km) oilfields with enforced gas flaring
legislation
Gas re‐injection is :‐ Not feasible or..‐ Expensive or..‐ A risk to the reservoir
No infrastructure
Gas export is :‐ Not feasible or..‐ Expensive or..‐ Has no fair gas buyer
GTL is a project enabler for
“stranded oil”
GTL is the best solution if distance >100 km and Gas flow rate <100 MMSCFD
![Page 20: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/20.jpg)
Mooring solutions
21
GTL on FPSO
Extended Well Test (EWT) FPSO
Full Field Development
Dynamic Positioning DP2+Disconnectable Riser
Permanently Moored
6 x 5MW External Azimuthing Thrusters
![Page 21: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/21.jpg)
22
EWT with GTL Concept ‐ Fly Through
22
![Page 22: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/22.jpg)
© SBM Offshore 2013. All rights reserved. www.sbmoffshore.com
Conclusions
![Page 23: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/23.jpg)
24
GTL: the SBM's green solution to associated gas
Referenced Technology Partner
Approval in principle by DNV
24+ months operational experience
onshore plant Brazil
World class GTL and FPSO
component supply chain established
Generic study complete, ready
for FEED
Oil Company approved GTL technology
![Page 24: Presentation in conjunction with SBM Offshore](https://reader031.vdocuments.site/reader031/viewer/2022021815/5866898d1a28ab4f408b6e45/html5/thumbnails/24.jpg)