![Page 1: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/1.jpg)
TOGETHER WE SHAPE THE FUTURE
Presentation for Energy Now Expo 2017
Adapting wind turbine supply to new market conditions
Richard Hatton
UK Country Manager
![Page 2: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/2.jpg)
1. INTRODUCTION 2. MARKET SITUATION 3. TECHNOLOGY UPDATE 4. ROUTE TO MARKET
• FIT • COMMUNITY PROJECT • ON-SITE GENERATION • ENERGY STORAGE • REPOWERING • EXTENSIONS
5. COMMERCIAL SUPPORT
![Page 3: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/3.jpg)
Global Fleet
Installed WECs - > 26,770 turbines
Installed MWs - > 44,140 MW
UK
ENERCON‘s UK Region - Scotland, England, Wales
First UK Project - 1995
Installed WECs - > 840 turbines
Installed MWs - > 1,100 MW
UK in 2016
UK Installed WECs - ~ 150 turbines
Introduction - ENERCON UK market summary, Oct 2016
![Page 4: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/4.jpg)
4
Dr Aloys Wobben ENERCON founder
Introduction
• Long term experience in the industry > 30 years
• Private owned company, managed by a foundation
• Company of engineers
• Pioneered the development of the Direct Drive Concept in the wind industry
• Highest vertical integration in the industry, giving the highest quality
• ~85% of the turbine made in-house
• Hand made in Germany…….
ENERCON FOUNDED……..
…..LATEST PLATFORM: 4MW E126 & E141
![Page 5: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/5.jpg)
IN-HOUSE GERMAN PRODUCTION
![Page 6: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/6.jpg)
IN-HOUSE GERMAN PRODUCTION
![Page 7: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/7.jpg)
IN-HOUSE GERMAN PRODUCTION
![Page 8: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/8.jpg)
IN-HOUSE GERMAN PRODUCTION
![Page 9: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/9.jpg)
IN-HOUSE GERMAN PRODUCTION
![Page 10: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/10.jpg)
IN-HOUSE LOGISTICS – ENERCON TRAIN NETWORK
![Page 11: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/11.jpg)
IN-HOUSE LOGISTICS – ENERCON SHIP
![Page 12: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/12.jpg)
UK - MAP OF PROJECTS
![Page 13: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/13.jpg)
1. INTRODUCTION 2. MARKET SITUATION 3. TECHNOLOGY UPDATE 4. ROUTE TO MARKET
• FIT • COMMUNITY PROJECT • ON-SITE GENERATION • ENERGY STORAGE • REPOWERING • EXTENSIONS
5. COMMERCIAL SUPPORT
![Page 14: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/14.jpg)
UK FEED IN TARIFF MARKET
for LANDOWNERS / FARMERS
YEAR FIT &
EXPORT
TARIFF
£/kWh
MARKET
SIZE
MW / YEAR
• Old FIT installations ended………………
• New FIT installations began…………….
• New FIT scheme annual degression……….…
2016
2017
2018
0.16
0.10
< 0.10
~100 MW
26 MW
25 MW
UK WIND TURBINE MARKET FOR LANDOWNERS / FARMERS
How can we still make this market an attractive proposition……..
![Page 15: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/15.jpg)
1. INTRODUCTION 2. MARKET SITUATION 3. TECHNOLOGY UPDATE 4. ROUTE TO MARKET
• FIT • COMMUNITY PROJECT • ON-SITE GENERATION • ENERGY STORAGE • REPOWERING • EXTENSIONS
5. COMMERCIAL SUPPORT
![Page 16: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/16.jpg)
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
1 MW
Platform
Use of larger rotors and generators – yield increase Y
ield
in M
Wh
/ a
2014 E-115
3.2 MW Ø: 116m
2015 E-126
4.2 MW Ø: 127m
2011 E-101
3.5 MW Ø: 101m
2017 E-141
4.2 MW Ø: 141m
3 MW
Platform
4 MW
Platform
Assumption: v = 6,5 m/s in 100m, α = 0,25, k = 2,00
2012 E-92
2.3 MW Ø: 92m
2003 E-70
2.3 MW Ø: 71m
2005 E-82
2.3 MW Ø: 82m
2006 E-44
900 kW Ø: 44m
2017 E-103
2.3 MW Ø: 103m
2 MW
Platform
2004 E-48
800 kW Ø: 48m
2006 E-53
800 kW Ø: 53m
yield increase through larger generators and larger rotors
![Page 17: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/17.jpg)
Comprehensive Product Platform
1 MW Platform 2 MW Platform 3 MW / 4 MW Platform
E44 E48 E53 E70 E82 E92 E101 / E115 / E126….
Rated
power
500 kW /
900 kW
500 kW /
800 kW
500 kW /
800 kW
1500 kW /
2300 kW
1500 kW /
2300 kW /
3000 kW
1500 kW /
2350 kW
….
Rotor 44 m 48 m 53 m 71 m 82 m 92 m ….
Hub height
(m)
45 / 55 50 / 60 /
65 / 76
50 / 60 / 73 57 / 64 /
75 / 85 /
98 / 114
59 / 69 /
78 / 84
69 / 78 /
84 / 85 /
98 / 104
….
IEC wind
class
IA IIA
S
IA & IIA
IA & IIA IIA
….
QTY
Installed
668 2,022 1,501 4,942 6,580 899 ….
WEC
concept
Gearless, variable speed, single blade adjustment
![Page 18: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/18.jpg)
Technology concept to reduce downtime
Advantages:
• Less wear due to slower rotation
• Low machine stress due to high speed variability
• Yield optimized control system
Annular generator
Machine house
Yaw drives
E-Module
Hub
Rotor blade
Tower
Foundation
1
2
3
4
5
6
ENERCON annular generator
7
8
![Page 19: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/19.jpg)
Storm control – increased yield
Turbines don’t switch off at typical cut-out speeds of ~25m/s, but adapt power depending on the wind
Advantages: Power production in stormy conditions, protection against storm damage and improved grid performance
vcut-out vreconnection
0
100
200
300
400
500
600
700
800
900
1000
1 5 9 13 17 21 25 29 33 37
Win
d d
istr
ibu
tio
n [
h/a
]
Po
we
r [
kW]
Wind Speed
10-min average acc. to IEC 61400
41
Pn
Instantaneous wind speed
Power is controlled continuously……
…..bringing additional yield above 25 m/s
![Page 20: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/20.jpg)
Energy yield of an ENERCON 82m rotor is comparable to conventional machines with 90m
Advantages:
~ Higher efficiency due to modified blade design
~ Lower noise emissions due to optimised blade tips
~ Longer service life due to reduced stress
~ Transport made easier due to streamlined blade design
Comparison of the power curve measurements' c(p): E-82 and conventional WEC
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
wind speed v (m/s)
po
wer
co
effi
cien
t c(
p)
E-82 (measured) conventional WEC (measured) theoretical c(p)
theoretical c(p) max = 0,593
Comparison of the power curve measurements‘ c(p): E-82 and conventional WEC Conventional design
ENERCON’s design
Advanced blade design – increase efficiency per m tip height
![Page 21: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/21.jpg)
Ancillary grid services – More than MWh
Comparison: Ireland’s DS3 System Services - Rewards electrical capability that surpasses Grid Code
Minimum requirements include 14 standard services
• Fast Frequency Response (FFR) • Steady State Reactive Power (SRP) • Dynamic Reactive Response (DRR) • Fast Post Fault Active Power Recovery (FPFAPR) • ……..
Additionally: increased payments available via Scalars, eg:
Faster performance – e.g. FFR – up to 2x payment Reliability – especially for SRP (95.5% min required) Features – e.g. SRP with voltage control – double payment Scarcity – targeting wind capabilities (DRR, FPFAPR)
Annual budget: up to € 235 million (from 2020)
Where is the UK heading here? Graphic source: EirGrid
![Page 22: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/22.jpg)
1. INTRODUCTION 2. MARKET SITUATION 3. TECHNOLOGY UPDATE 4. ROUTE TO MARKET
• FIT • COMMUNITY PROJECT • ON-SITE GENERATION • ENERGY STORAGE • REPOWERING • EXTENSIONS
5. COMMERCIAL SUPPORT
![Page 23: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/23.jpg)
Feed-in Tariff (FIT) MARKET
0.0
1.0
2.0
3.0
4.0
5.0
6.0
Q1 2016 Q2 2016 Q3 2016 Q4 2016 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Q2 2018 Q3 2018 Q4 2018 Q1 2019
FiT
rate
(p
/kW
h)
FiT Rates for Onshore Wind (100 - 1500 kW)
FiT with only Default Degression
FiT where Deployment Cap has been reached or applied for
FiT if all Deployment Caps reached
• Could still be opportunities to develop through the FIT market
• Feed in tariff is lower than before
• Plus, confusion over how tariff decreases over time if caps are reached
• Poor wind sites will suffer, but projects with good wind will still work
• However, there is already a long queue, and time is limited, so….
• Medium onshore wind must start to look beyond subsidies and the FIT
![Page 24: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/24.jpg)
ON-SITE GENERATION
ENERCON Projects Site Use Turbine
Sainsbury’s Distribution centre 1x E-40
Ford Car manufacturing plant 2x E-66
Green Park Business park 1x E-70
Michelin Tyre factory 2x E-70
Port of Bristol Harbour 3x E-82
B&Q Distribution centre 1x E-82
Wentloog Environmental Centre Solar panel factory 1x E-82
Ford Car manufacturing plant 1x E-82
Tesco Distribution Centre 1x E-82
Crossness Sewage treatment 1x E-82
Beckton Sewage treatment 1x E-70
How End Farm Dairy farm 1x E-48
Could your business also benefit from on site generation?
• CASE STUDY – How End Farm Project
• How End Farm installed 1x E-48 in 2015, at their dairy farm in Cumbria
• Project provides 0.5MW – enough to power ~300 homes
• Power used for refrigeration (9,000 litres of milk cooled daily to 4oC),
milking equipment, farm usage, bore hole pump, and 2x farmhouses
• Saves money long term compared to buying power from the grid
• +20 year protection against price rises
![Page 25: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/25.jpg)
COMMUNITY PROJECTS
ENERCON Projects Location Turbine
Tiree Inner Hebrides 1x E-44
Udny Community, Fetterangus Aberdeenshire 2x E-48
Horshader, North Tolsta Outer Hebrides 2x E-44
Westray, Hoy, Rousay,
Shapinsay, Stronsay
Orkney 5x E-44
Loch Carnan Outer Hebrides 3x E-70
Corrimony Inverness-shire 5x E-70
Gamlingay Cambridgeshire 1x E-33
Barra Isle of Barra 1x E-44
Mullacott Cross Devon 1x E-48
Windfarm Berwick Northumberland 1x E-48
Gigha Isle of Gigha 3x E-70
Beinn Ghrideag Isle of Lewis 3x E-82
Islay Community Argyll and Bute 1x E-33
Lesmahagow Community South Lanarkshire 2x E-48
1x E-82
Netherburn West South Lanarkshire 1x E-53
• CASE STUDY – Stewart Energy, Lesmahagow Community Project
• 3x turbines in 2015 at Draffan, Southfield & Marshill, south of Glasgow
• Andrew Stewart, a local farmer, involved local community & gained
Scottish Government Fund support for the £8m project
Community involvement makes projects more attractive
• Andrew contacted the Lesmahagow
Development Trust (LDT), and this community
group invested 25%, with the remaining 75%
invested by the rural business
• LDT investment promises substantial profits for
local social and environmental developments
• Project contributes to property insulation,
recreational schemes for young people, &
protection of town’s heritage
• 2.5MW – enough to power ~1,500 homes
![Page 26: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/26.jpg)
ENERGY STORAGE
ENERCON have built 2 storage solution projects, and are considering more…
Case Study 1 – Husuhagi, Faroe Islands
• Components – 13 x E-44 900kW, Enercon Smart Container (40ft
Container) and two battery containers from SAFT
• Tech – Li-Ion; 720kWh/2.4MW active discharge power and 1.5MW active
charging power
• Use – ramp rate reduction from wind energy, increase flexibility in grid,
less dependency on oil
Case Study 2 – Feldheim, Germany
• Components – 42 turbine Wind Farm, 3360 battery modules (one
module = 28 cells) from LG Chem, inverter cabinets, boost converter,
control cabinets, subordinate control, calculation of frequency at POC,
housed in a 17mx30m building
• Tech – Li-Ion, 10.79MWh/10MW discharge power
• Use – collaborate with primary control reserve power (balancing),
tertiary reserve, energy management
![Page 27: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/27.jpg)
REPOWERING
Repowering existing sites can increase project viability. Advantages can include:
• Use of existing infrastructure such as access roads
• Use of existing grid connection and hardware
• Simpler planning
• More local acceptance
ENERCON repowering references include:
Case Study 1 – Delabole Wind Farm
• Originally the first commercial onshore wind farm, built in 1991 in Cornwall
• In 2011 Good Energy replaced 10x Vestas 400kW turbines with 4x ENERCON E-70
• Capacity was doubled to 9.2 MW
Case Study 2 – Mean Moor Wind Farm
• Originally the first co-operatively owned wind farm, built in 1997 in Cumbria
• In 2016 Baywind Energy Co-operative, together with Infinergy, replaced 5x Wind World turbines with 5x ENERCON E-70
• Capacity was more than quadrupled from 2.5 MW to 11.5 MW
• Power output expected to increase six-fold
![Page 28: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/28.jpg)
EXTENSIONS
Extending existing sites similarly can also increase project viability. Advantages can include:
• Use of existing infrastructure such as access roads
• Use of existing grid connection and hardware
• Simpler planning
• More local acceptance
• Significant reduction in risk
If you already own a wind turbine, can you use the returns you are making from it to install another?
• Under new market conditions returns may be lower than the initial project…..
• ……….but, may compare well to other investment opportunities
![Page 29: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/29.jpg)
1. INTRODUCTION 2. MARKET SITUATION 3. TECHNOLOGY UPDATE 4. ROUTE TO MARKET
• FIT • COMMUNITY PROJECT • ON-SITE GENERATION • ENERGY STORAGE • REPOWERING • EXTENSIONS
5. COMMERCIAL SUPPORT
![Page 30: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/30.jpg)
PLANNING TO INSTALLATION – LIFECYCLE SUPPORT
Site Selection Permits
Agreements / Reports
Turbine Selection
Detailed Design + Economics
Installation
Environmental: • Visual • Ecological • Noise • Shadow flicker • Safety Technical: • Wind + site assessment • Obstacles + wake • Yield calculations • Transport & access • Factory / grid connection
point • Site visit
• Planning • Land lease • Grid connection • Power purchase • FiT / ROC / CfD (pre-
accreditation) • Environmental • Geotech • Radar
• Rated power • Rotor / hub / tip • IEC class • Economic performance • Guarantees • O&M Track record: • Turbine type • Manufacturer • O&M
• Transport / access roads • Foundation design • Civil works • Electrical works • Data connection
Economic study • Capital costs • Operational costs • Revenue
Civil works • Access roads • Foundation Electrical works • Connection between
WEC and internal and external grid
• Data connection Wind Turbine • Installation • Commissioning • Take Over
• ENERCON have partnered up with well known consultancies to offer full project delivery, including planning support • Come and speak to us to see if your business will benefit
![Page 31: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/31.jpg)
FINANCIAL SUPPORT
• ENERCON can provide a financial solution for small projects of up to around £ 5 Million - Post-construction finance:
• Can help where finance is unavailable or will take too long to arrange
• Gives fast completion of contracts
• Due diligence of project documents by local, experienced law firm / consultant
• Technical due diligence by ENERCON
• Developer spends equity on infrastructure and small down payment to ENERCON
ENERCON
Local Legal Advisor
1) Project Evaluation / - wind data, grid, geotechnical planning, etc. 2) Heads of Terms
3) Deposit for Due Diligence
5) Due Diligence – 8 weeks to complete
6) Due Diligence report
4) Project information: - Contracts, Accounts, Leases, ect.
Customer
7) Delivery with delayed payments
8) Customer refinances post
construction
![Page 32: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/32.jpg)
STOCK BUILD GIVES SHORT LEAD TIME
From 2017, we now build stock for single turbine sites in the UK
• New market means some projects need short lead times for turbines
• Turbines, towers and blades are pre made and held in storage
• Component shipped after contract signature
• Reduces lead time from contract signature to installation from 6 months to 3 months
• Gives customers more flexibility
• Gives customers better cash flow
![Page 33: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/33.jpg)
OPERATION & MAINTENANCE
UK main offices Edinburgh Huntingdon
Main warehouse Inverness
19 service stations Orkney Skye Isle of Lewis Inverness Banff Aberdeen Perth Glasgow Warrington Lincoln Huntingdon South Wales Cornwall Thurso Carlisle Livingston Newcastle Shetland South Uist
Decentralised structure ensures fast response = minimum downtime
![Page 34: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/34.jpg)
OPERATION & MAINTENANCE
Operational development:
• ENERCON PartnerKonzept (EPK) – maximum protection
• Service Information Portal (SIP) – globally available information
• Remote monitoring – real time information
Contract development:
• Fixed maintenance time for each WEC type
• EPK cost depends on amount of generated energy
• No payment for repairs
• Insurance cover bolt on available
• Unlimited compensation – No cap
![Page 35: Presentation for Energy Now Expo · PDF fileComparison of the power curve ... calculation of frequency at POC, ... • ENERCON have partnered up with well known consultancies to offer](https://reader030.vdocuments.site/reader030/viewer/2022032613/5a9d8fee7f8b9a21688c5935/html5/thumbnails/35.jpg)
THANK YOU
Publisher: ENERCON GmbH ▪ Dreekamp 5 ▪ 26605 Aurich ▪ Germany ▪ Phone: +49 4941-927-0 ▪ Fax: +49 4941-927-109
Copyright: © ENERCON GmbH. Any reproduction, distribution and utilisation of this document as well as the communication of its contents to third parties without express authorisation is prohibited. Violators will be held liable for monetary damages. All rights reserved in the event of the grant of a patent, utility model or design.
Content subject to change: ENERCON GmbH reserves the right to change, improve and expand this document and the subject matter described herein at any time without prior notice.