TheThe exampleexample of Alp of Alp TransitTransit ProjectProjectLoetschberg base tunnelLoetschberg base tunnel
ITA/AITES ITA/AITES –– Training Training CourseCourseTUNNEL ENGINEERING TUNNEL ENGINEERING
ITA/AITESITA/AITES
May 6, 2005 11//4040
Prepared by Prepared by ““F.F. VuilleumierVuilleumier and G.and G. SeingreSeingre””
Istanbul Istanbul -- 20052005
5Conclusions Conclusions and and referencesreferences
Chapter 1 :Chapter 1 : Rockburst by TBM excavation
Chapter 2 : Chapter 2 : Face instability with block formation
IntroductionIntroduction : : Loetschberg-Base-Tunnel
ChapterChapter 3 : 3 : On site comparison between TBM and drill-and-blast
Index
2
3
4
1
22//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Introduction
Loetschberg-Base-Tunnelshort presentation
TheThe exampleexample of Alp of Alp TransitTransit ProjectProject 33//4040
22
33
44
55
11
Switzerland builds now 2 new alpine base tunnels
• GothardL = 57 km2015
• LoetschbergL = 34.7 km2007connection withSimplon-tunnel
44//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Functions of the new rail alpine routes
• Integration of Switzerland in european high-speed railway network
• Transfer of alpine freight traffic from road to rail
55//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Loetschberg - Project overview
- Length : 34,7 km- 2 tubes, 65-70 m2
- Total length of all galeries : 88 km
- Altitude max. : 828 m- Construction period :
1995 - 2006- Coming into operation :
2007
66//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Construction concept
• 10 simultaneous tunnel drives
• Reducing time construction
• Risk management : max. length 10 km
88//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Construction concept : D + B
99//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Construction concept : TBM
1010//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Overall construction programme
1111//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Chapter 1
Spalling during TBM excavation
22
33
44
55
11
1212//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Condition for stress-driven spalling
• Massive Rockmass• Brittle rock• High stress level
(high overburden)• Low confinement
(ratio σ3 / σ1)• Crack damage
initiationσtan max = 0. 3…0.5 σc
Doc. Diederichs
1313//4040The example of Alp Transit ProjectThe example of Alp Transit Project
Stresses on tunnel walls
• Kirsch (1898)• σr = 0• σtan max = 3 σ1 - σ3
• σtan min = 3 σ3 - σ1
- Doc. Hoek, Kaiser and Bawden
1414//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Spalling : stresses orientation
Loestchberg TBM drives• overburden up to
1700 m• σv~ σ1 > σh
• max. stresses on the tunnel wall
- Doc. Martin, Kaiser and Mc Creath
1515//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Stress-driven spalling : example
1616//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Stress-driven spalling : example
1717//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Stress-driven spalling : example
1818//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Problem for TBMGripper pads cannot
be seated on the side wall
1919//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Problem for TBM excavation
the 4 m TBM shield protects the workers
2020//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Support choice by spalling
Spalling• Standard support :
– Swellex-Bolts– Wire mesh (TBM)– Fiber-shotcrete (D+B)
• Bolts on tunnel wall (and on tunnel face by drill-and-blast)
Rockburst• Stored Energy => support
– Yiellding-Swellex orSplitset-Bolts
– Fiber-shotcrete or wire mesh and shotcrete
• High density of bolts on tunnel wall (and on tunnel face by drill- and-blast)
2121//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Support choice by spallingLearning from the first drive
2222//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Chapter 2
Face instability with block formation
22
33
44
55
11
2323//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Face instability with block formation
2424//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Block formation before cutter head
Doc. ARGEMaTrans, TBM drive Raron
Damage at :-Mucking buckets-Disc-cutters-Band-conveyors
Abrasion of cutter-head
2525//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Face instability with blocks formation
• Claim of the contractor
• Influence of stress level and orientation
• Influence of tunnel radius (Kaiser)
• Influence ofschistosity and fractures
2626//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Chapter 3
On site comparison between TBM and drill-
and-blast
22
33
44
55
11
2727//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Choice between TBM – D+B
2828//****TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
First difficulty : Trias zone Raron
•• 10 km OK 10 km OK forfor TBM TBM
•• 150 m Trias 150 m Trias zone too zone too difficult fordifficult for TBMTBM
2929//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
First difficulty : Trias zone Raron
3030//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
First difficulty : Trias zone Raron
>> small exploratory small exploratory gallerygallery onon western western tunneltunnel
>170 m >170 m conventionnal conventionnal prepre--excavationexcavation ofofeasterneastern tubetube
3131//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Choice of excavation’s type
PoliticsPolitics
•• Steg Steg drive readydrive ready to to gogoin 2000in 2000
•• Raron drive ready onlyRaron drive ready onlyin 2001in 2001
> TBM > TBM forfor Steg lateral Steg lateral aditadit
3232//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Other reasons• too short for economic
TBM excavation
• limited place at Portal Raron
=> east tunnel : TBM west tunnel : D + B
Choice of excavation’s type
3333//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
On site comparison between TBM and drill-and-blast
Length 3‘400 m
3434//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
� Lias-limestone, 750 m (22%)� Dogger (Aalenian) - marlschist
and limestone, 850 m (25%)� Quinten (Malm) - hard limestone,
470 m (14%)� Granodiorite, 780 m (23%)� Central Aar-Granite, 570 m
(17%)
Comparison of advance rates
Rock Type TBM (m/d) D+B (m/d)
Lias 6.5 5.6
Dogger (Aalenian) 17.8 7.3
Quinten Limestone 18.5 10
Granodiorite 22.2 8.7
Granite 13.7 10.2
unstableunstable layer in crownlayer in crown
very abrasive rock very abrasive rock and blocksand blocks
3535//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Lias limestone : unstable layer in crown
• Very schistose• Flatly dipping in the
direction of tunnel drive
• Convergence until 60 cm in TBM drive
• Few problems for drill and blast drive (unstable layer fell during blasting)
3636//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Central Aar granite : abrasivity and blocks
• TBM-head had to be repaired 4 times
• Protection of disc-cutters against blocks
3737//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Central Aar granite : abrasivity and blocks
3838//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
Conclusions and references
• Hard rock TBM can drive under moderate spalling conditions=> orientation of grippers ?
• Stress-driven block formation can occur at TBM face under high overburden
• Orientation of schistosity and fractures
22
33
44
55
11
3939//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject
ITA/AITESITA/AITES
Clause de non-responsabilité pour les rapports des groupes de travail de l'AITESL’Association Internationale des Travaux en Souterrain (AITES) publie ce rapport, conformément à ses Statuts, pour faciliter les échanges d’informations afin :
d’encourager l’utilisation du sous-sol au profit du grand public, de l’environnement et du développement durable;
de promouvoir les progrès dans la planification, le projet, la construction, l’entretien, la réhabilitation et la sécurité des tunnels et de l’espace souterrain en rassemblant et confrontant les informations, ainsi qu’en étudiant les questions qui s’y rapportent.
Cependant, l’AITES décline toute responsabilité en ce qui concerne les informations publiées dans ce rapport.
Ces informations :
sont exclusivement de nature générale et ne visent pas la situation particulière d’une personne physique ou morale;
ne sont pas nécessairement complètes, exhaustives, exactes ou à jour ;
proviennent parfois de sources extérieures sue lesquelles les services de l’AITES n’ont aucun contrôle et pour lesquelles l’AITES décline toute responsabilité ;
ne constituent pas un avis professionnel or juridique (si vous avez besoin d’avis spécifiques, consultez toujours un professionnel dûment qualifié).
Disclaimer for the reports of ITA working groups The International Tunnelling Association (ITA) publishes this report to, in accordance with its statutes, facilitate the exchange of information, in order:
to encourage planning of the subsurface for the benefit of the public, environment and sustainable development
to promote advances in planning, design, construction, maintenance and safety of tunnels and underground space, by bringing together information thereon and by studying questions related thereto.
However ITA accepts no responsibility or liability whatsoever with regard to the material published in this report.
This material is:
information of a general nature only, which is not intended to address the specific circumstances of any particular individual or entity;
not necessarily comprehensive, complete, accurate or up to date;
sometimes collected from external sources over which ITA services have no control and for which ITA assumes no responsibility;
not professional or legal advice (if you need specific advice, you should always consult a suitably qualified professional).
4040//4040TheThe exampleexample of Alp of Alp TransitTransit ProjectProject