preliminary soil investigation bellarine secondary college ......method statement for the...
TRANSCRIPT
Landserv Ref: G0611_RPT004_OCP Bellarine_21Sep18
Preliminary Soil Investigation
Bellarine Secondary College, Peninsula
Drive, Drysdale, VIC 3222
21 September 2018
Prepared for:
Victorian School Building Authority
Department of Education and Training
Level 1, 33 St Andrews Place, East Melbourne
VIC 3002
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 i
DOCUMENT DISTRIBUTION
Number of Copies: Recipient:
1 Electronic Copy (via email)
Team Leader - Property
Victorian School Building Authority
@edumail.vic.gov.au
Original Electronic File Held on file by Landserv
DOCUMENT STATUS
Author: Technical Review: Editorial Review: Revision Date:
Original
21/09/2018
Landserv Pty Limited
ABN: 87 065 632 895
GEELONG MELBOURNE
14 Albert St 293A Bay St
Geelong West
VIC 3218
Port Melbourne
VIC 3207
PO Box 1628 Geelong
VIC3220
T. 03 52224173
T. 03 96460833
www.landserv.com.au
This document is and shall remain the property of Landserv Pty Ltd. The document may only be
used for the purposes for which it was commissioned and in accordance with the Terms of
Engagement for the commission. Unauthorized use of this document in any form whatsoever is
prohibited.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 ii
CONTENTS
1 INTRODUCTION ..............................................................................................................1
1.1 General ............................................................................................................... 1
1.2 Scope of Work ................................................................................................... 1
2 BACKGROUND INFORMATION .....................................................................................2
2.1 General Site Information ................................................................................. 2
3 SOIL ASSESSMENT GUIDELINES .....................................................................................3
4 SOIL INVESTIGATION .....................................................................................................5
4.1 Fieldwork ............................................................................................................. 5
4.1.1 Soil Sample Locations ...................................................................... 5
4.1.2 Soil Sampling ...................................................................................... 5
4.2 Laboratory Analytical Program...................................................................... 6
4.2.1 Laboratories ....................................................................................... 6
4.2.2 Soil Analysis ........................................................................................ 6
4.2.3 Quality Control Samples .................................................................. 6
5 RESULTS OF SOIL INVESTIGATION .................................................................................8
5.1 Field Observations ............................................................................................ 8
5.2 Soil Analytical Results ....................................................................................... 8
5.3 Analytical Data Validation ............................................................................. 9
6 FINDINGS......................................................................................................................10
7 LIMITATIONS .................................................................................................................11
8 REFERENCES .................................................................................................................12
9 ABBREVIATIONS ...........................................................................................................13
FIGURES (Appendix A)
Figure 1 – Site Location Plan
Figure 2 - Sample Location Plan
TABLES (Appendix B)
Table 1 – Soil Laboratory Analytical Results
Table 2 – Field Sampling Quality Assurance Results
Table 3 – Soil Laboratory Quality Control Results
APPENDICES
Appendix A – Figures
Appendix B – Tables
Appendix C – NATA Laboratory Analysis Documentation
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 1
1 INTRODUCTION
1.1 General
Landserv Pty Ltd. (Landserv) was engaged by the Victorian Schools Building Authority
(VSBA) to conduct a preliminary soil investigation to assess the presence of
Organochlorine Pesticides (OCP) at the Bellarine Secondary College – Drysdale
Campus located on Peninsula Drive, Drysdale, Victoria 3222 (the ‘site’). The
investigation was conducted in accordance with Landserv proposal, emailed 16
August 2018, and approved by VSBA via email on 17 August 2018.
The objective of the preliminary soil investigation was to investigate whether any
residual OCP contamination is present in the soil at the site from former agricultural
practice conducted in the past.
The site location and site layout are shown on Figure 1 in Appendix A.
1.2 Scope of Work
The following scope of work was implemented:
▪ Prepared a health and safety plan (including DBYD searches) and a safe work
method statement for the investigation works conducted;
▪ Liaised with the site Assistant Principal and completed a site induction prior to
commencing works;
▪ Set out 20 sample locations across the site in an approximate grid pattern.
▪ Collection of two (2) soil samples at each location, as a minimum, samples were
collected from 0-0.1 m and 0.4- 0.5 m below ground level (mBGL);
▪ Collection of four (4) duplicate and triplicate Quality Analysis and Quality
Control (QA/QC);
▪ Soil note taken at each sample location;
▪ Analysed 26 selected soil samples and QA/QC samples (2 duplicate and 2
triplicate samples) for organochlorine pesticides (OCP); and
▪ Preparation of this report.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 2
2 BACKGROUND INFORMATION
2.1 General Site Information
Table 2.1 Summary of Site Details
Item Details
Site Address: Bellarine Secondary College, Peninsula Drive, Drysdale, VIC 3222.
Locality Map: Figure 1, Appendix A
Current Site Layout: Figure 1, Appendix A
Site Area: The site area is approximately 18 hectares.
Current Land Owner: Department for Education and Training.
Current Zoning:
The site has the following zonings:
▪ Special Use Zone - SUZ13
Drysdale Regional Community and Cultural Hub.
Current and Future land
use:
For this assessment it has been assumed that the current and future
use of the site will continue to be as an education facility.
No development plans have been provided.
Elevation: Ranging approximately 90-100 m Australian Height Datum (AHD).
Geographical
Coordinates
(MGA Zone 55):
Easting: 286077
Northing: 5770038
(Approx. centre of site).
Topography: The majority of site is predominately flat. There is a slope down to the
south east corner.
Surrounding land use:
North: Education facility
East: Jurgens Road. A reserve to the north and agriculture to the
south.
South: Belchers Road and then agriculture
West: Sporting and recreation ground.
Previous known
environment
investigations / reports:
None known
Environmental Audit
Overlay: None
.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 3
3 SOIL ASSESSMENT GUIDELINES
The State Environment Protection Policy (Prevention and Management of
Contamination of Land) 2002 (Land SEPP) sets out the regulatory framework for the
prevention and management of contaminated land within the State of Victoria.
The Land SEPP defines the beneficial uses of land to be protected by land use
categories; in this case Landserv have conservatively applied ‘Sensitive Use – Other’.
The protected beneficial uses of land associated with the ongoing educational use of
the site are:
▪ Maintenance of Ecosystems –Modified Ecosystems & Highly Modified
Ecosystems;
▪ Human Health;
▪ Buildings and Structures;
▪ Aesthetics; and
▪ Production of Food, Flora and Fibre.
The National Environment Protection (Assessment of Site Contamination) Measure
(NEPM - 2013) provides guidance on the process for assessing contaminated land and
provides the relevant guidelines for the protection of applicable beneficial uses for
each land use. The land use category for the site has conservatively been selected
from the NEPM as ‘Residential A’. The NEPM is given effect in Victoria by the Land SEPP.
The table below details the criteria applied to each of the protected beneficial uses.
Table 3.1 Soil Assessment Criteria
Beneficial Use Applicable Assessment Criteria
Maintenance of
Ecosystems
Ecological Investigation Levels (EILs):
Schedule B1 of the NEPM provides a range of investigation levels for the
protection of ecosystems, referred to as EILs.
EILs have been derived for selected compounds to assess risk to terrestrial
ecosystems. The EILs are dependent on physicochemical properties of soil
and generally apply to the top 2 m (except in arid areas). EILs are derived
for each land use scenario based on levels of species protection.
Schedule B5b provides methodology for deriving EILs for DDT specifically,
based on a species sensitivity distribution model derived for Australian
conditions.
Ecological screening levels (ESLs):
ESLs, also provided in the NEPM, have been developed for selected
petroleum hydrocarbon compounds and are applicable for assessing risk
to terrestrial ecosystems. ESLs broadly apply to coarse- and fine-grained
soils and various land uses. They are generally applicable to the top 3 m of
soil (except in arid areas where root zones may extend to greater depths).
ESLs do not apply to this investigation as petroleum compounds have not
been investigated.
Human Health
Health Investigation Levels (HILs):
Schedule B1of the NEPM provides a range of investigation levels for the
protection of human health, referred to as HILs. Based on the ongoing
sensitive land use, the HIL values have been conservatively adopted as
Residential A – Standard Residential with garden/accessible soil. This
category includes children’s day care centres, preschools and primary
schools and has the most conservative HILs (HIL A).
Secondary schools, playing fields and ovals are categorised Recreational
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 4
Beneficial Use Applicable Assessment Criteria
C in the NEPM and would apply HIL C criteria.
Schedule B7 (A3) of the NEPM discusses in detail the derivation method for
HILs of OCP.
It is emphasised within the NEPM that HILs are not intended for use as
default remediation trigger criteria but are actually intended to prompt an
appropriate site-specific assessment when they are exceeded. HILs are
generic to all soil types and generally apply to the top 3 m of soil.
Health screening levels (HSLs):
HSLs have been developed for the main petroleum compounds. They are
applicable to assessing human health risk via the inhalation and direct
contact pathways for certain petroleum mixtures. The HSLs depend on
specific soil physicochemical properties, land use scenarios, and the
characteristics of buildings. They apply to different soil types, and depths
below surface to >4 m. HSLs do not apply to this investigation as petroleum
compounds have not been investigated.
Buildings and
Structures
The Land SEPP states that Contamination must not cause the land to be
corrosive to or adversely affect the integrity of structures or building
materials.
Aesthetics
The Land SEPP requires that Contamination must not cause the land to be
offensive to the senses of human beings. Landserv has provided only a
brief qualitative comment on this criterion, in the context of ongoing open
space land use.
Production of Food,
Flora and Fibre
Chemical substances or waste identified through the application of the
NEPM Schedule B2, Appendix A. Contamination must not adversely affect
produce quality or yield and must not affect the level of any indicator in
food, flora and fibre produced at the site (or that may be produced) such
that the level of that indicator is greater than that specified by the
Australia New Zealand Food Authority, Food Standards Code.
The adopted values of the assessment criteria are included in Table 1, Appendix B. In
additon adoptred values are depicted in the table below:
Table 3.2 – Adopted Assessment Criteria
Analyte Health Investigation Level – A
(mg/kg)
Ecological Investigation Level
– Urban, Residential and Public
Open Space (mg/kg)
DDT & DDD & DDD 240 180
Aldrin & Dieldrin 6
Chlordane 50
Endosulfan 270
Endrin 10
Heptachlor 6
HCB 10
Methoxychlor 300
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 5
4 SOIL INVESTIGATION
The soil sampling program employed gave consideration to the following references:
▪ National Environment Protection Council (NEPC, 1999). National Environment
Protection (Assessment of Site Contamination) Amendment Measure 2013 (No.
1).
▪ Australian Standard AS4482.1 – 2005 Guide to the sampling and investigation of
potentially contaminated soil, Part 1: Non-volatile and semi-volatile compounds.
▪ Australia Standards AS4482.2 -1999 Guide to the sampling and investigation of
potentially contaminated soil Part 2: Volatile substances.
The soil investigation was carried out in accordance with Landserv policies and field
work procedures, in a manner consistent with the level of quality and skill generally
exercised by members of the environmental consulting and contamination assessment
profession.
4.1 Fieldwork
4.1.1 Soil Sample Locations
The soil sampling program involved collection of soil samples from 20 soil bore locations
(BH01 to BH20) in an approximate grid pattern across the site. A systematic 95 m
sampling grid was applied to the site which provides for a contamination hotspot 112 m
diameter to be detected with a 95% confidence. The number of sample locations is
10% of the minimum soil sampling density recommended in AS4482.1, A Guide to the
Investigation and Sampling of Sites with Potentially Contaminated Soil, 2005. A full
detailed site investigation of the site applying AS4482.1 would require 200 samples.
However, that density is considered excessive and given the nature of the potential
contamination source (broadacre spraying of OCP to land), the sampling density
employed is considered suitable to achieve the objectives of this project.
The sample locations are shown on Figure 2, Appendix A.
4.1.2 Soil Sampling
Soil sampling was conducted on 1 September 2018 from 12:00 pm to 4:00 pm. Pre-
defined locations were sampled by hand auger. Samples were collected at 0.0-01 m
bgl to target potential surface soil contamination and 0.4-0.5 m bgl to target potential
subsurface soil contamination. No additional soil horizons were encountered that
required sampling.
At each sample location a square of surface soil/turf was cut 0.1 m depth by spade
and removed, a sample of soil was collected from the side of the clod across its full
depth. All organic material, such as grass, from the surface was not included in the
sample.
A hand auger was then used to bore to 0.4 m bgl. At this point the hand auger was
cleaned off by spatula so no soil remained visible. The hand auger was then reinserted
into the bore and a further 0.1 m of soil removed which was used to provide the
required sample.
Soil samples were placed in sample jars with Teflon seals provided by the laboratory. All
samples were identified with a unique sample number, which was documented on the
sample label, bore log and chain of custody form.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 6
Each bore was logged during installation. The field sampling forms included date, site,
project number, sample location, description of fill/soil horizons encountered, sample
numbers and other comments.
All samples were placed in an ice-cooled esky immediately after collection. The
samples were refrigerated and then transported on ice under chain of custody
procedure to the analytical laboratory on the next working day.
Soil bores were backfilled with the arisings and the square cut of turf was replaced to
return the ground to a flat and safe condition
All field sampling equipment was decontaminated after use at each location to
prevent cross contamination of the next sampling location. Decontamination of field
equipment involved scraping all visible soil from the spade and hand augers.
4.2 Laboratory Analytical Program
4.2.1 Laboratories
All laboratory analyses were conducted by National Association of Testing Authorities
NATA endorsed laboratories using NATA approved analytical methods. The primary
laboratory for the soil analysis program was ALS Laboratory Group (ALS). The secondary
laboratory (for QA/QC triplicate samples) was EnviroLab. All analyses were conducted
within the holding times recommended by Standards Australia (2005, 1999).
4.2.2 Soil Analysis
A total of 26 primary soil samples were selected for analysis. The analytical schedule
included a full suite of potential OCP contaminants associated with the former use of
the site and surrounding area.
The implemented analytical schedule for primary samples included:
▪ 20 surface soil samples for organochlorine pesticides (OCP); and
▪ 6 sub-surface soil samples for organochlorine pesticides (OCP).
4.2.3 Quality Control Samples
The following quality control samples were analysed during the soil sampling program:
▪ 2 blind duplicate samples were submitted for organochlorine pesticide (OCP)
analysis to the primary laboratory; and
▪ 2 triplicate samples were submitted for organochlorine pesticide (OCP) analysis
to the secondary laboratory.
No equipment rinsate samples were collected as all samples were collected with a
new clean pair of disposable nitrile gloves. The quality control samples collected are
listed in the table below.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 7
Table 4.2 Soil Quality Control Samples
Primary
Sample ID
Type Quality Control
sample ID
Laboratory Analytes
BH09-0.0 Duplicate BH509-0.0 ALS OCP
Triplicate BH609-0.0 Envirolab OCP
BH20-0.0 Duplicate BH520-0.0 ALS OCP
Triplicate BH620-0.0 Envirolab OCP
QA/QC results are discussed in Section 5.3.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 8
5 RESULTS OF SOIL INVESTIGATION
5.1 Field Observations
In general, bores BH01 to BH20 comprised dark to light grey, fine grained silty sand with
some roots and organic matter (particularly in the upper 0.2 m).
Bores (BH19 and BH20) located within the lower south east of the site exhibited
occasional firm, light brown clay with grey mottling at approximately 0.4 m depth. Bores
(BH13, BH15 and BH16) located within the middle of the site identified some red-brown
clayey sandy silt at varying depths from 0.3 m to 0.5 m.
Fill was observed in samples (BH01, BH02, BH04 and BH05) located within the north
portion of the site comprising brown, grey and orange, clayey sands with crushed rock,
sand or sand and gravel (particularly noticeable around the site entrance, car parks
and buildings).
No visual or olfactory evidence of contamination of soil was observed in any borehole
during the investigation.
5.2 Soil Analytical Results
Soil analytical results are presented in full in Table 1, Appendix B. NATA endorsed
laboratory reports and chain of custody forms are provided as Appendix C.
A summary of the laboratory data and comparison to the adopted soil assessment
criteria is presented in the table below.
Table 5.1 Summary of Laboratory Data and Adopted Criteria
Analyte
Maximum Analytical
Results
(mg/kg)
Health Investigation
Level – A (mg/kg)
Ecological
Investigation Level –
Urban, Residential and
Public Open Space
(mg/kg)
DDT & DDD & DDD 0.08 240 180
Aldrin & Dieldrin 0.13 6
Chlordane <0.06 50
Endosulfan <0.06 270
Endrin <0.06 10
Heptachlor <0.06 6
HCB <0.06 10
Methoxychlor <0.06 300
Mirex - 10
Toxaphene - 20
▪ Non-detectable to low concentrations of OCPs in all samples tested below the
adopted NEPM EIL and NEPM HIL A criteria at all locations.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 9
5.3 Analytical Data Validation
A relative percentage difference (RPD) was calculated for each duplicate and
triplicate pair to obtain a quantitative measure of the accuracy of the results obtained.
An RPD of <50% is generally considered acceptable based on AS4482.1 (2005). The RPD
data are provided in Table 3, of Appendix B.
RPD results for both the duplicate and triplicate samples showed 100% correlation with
all 26 duplicate RPD values returning 0% and all 21 triplicate RPD values also returning
0%. All results that the RPD calculations were made from were below the limit of
reporting.
A review of the internal laboratory quality control program implemented by ALS and
Enviolab is presented in Table 3 of Appendix B. ALS as the primary laboratory returned a
full set of acceptable QC results for duplicate, spikes and blanks. Envirolab used as the
secondary laboratory for triplicate samples also returned 100% acceptable results for
QC blanks and laboratory control samples, no internal duplicate QC was undertaken.
Landserv conclude that based on the QA/QC data provided, the sampling and
analytical QA/QC program is fully acceptable, and the analytical data is of a reliable
quality to meet the objective of this assessment.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 10
6 FINDINGS
Landserv has completed a preliminary soil investigation for the presence of
organochlorine pesticides (OCP) at the Bellarine Secondary College, Drysdale Campus.
The investigation included the soil sampling of 20 soil bores to target surface soils and
subsurface soils to a maximum bore depth of 0.5 m below ground level. NATA certified
laboratory analysis was undertaken for a suite of OCP and included a QA/QC program
to validate data integrity. A summary of the findings is detailed below:
▪ In general, bores BH01 to BH20 comprised dark to light grey, fine grained silty
sand with some roots and organic matter (particularly in the upper 0.2 m).
▪ Bores (BH19 and BH20) located within the lower south east of the site exhibited
occasional firm, light brown clay with grey mottling at approximately 0.4 m
depth. Bores (BH13, BH15 and BH16) located within the middle of the site
identified some red-brown clayey sandy silt at varying depths from 0.3 m to 0.5
m.
▪ Fill was observed in samples (BH01, BH02, BH04 and BH05) located within the
north portion of the site comprising brown, grey and orange, clayey sands with
crushed rock, sand or sand and gravel (particularly noticeable around the site
entrance, car parks and buildings).
▪ No visual or olfactory evidence of contamination of soil was observed in any
borehole during the investigation.
▪ Non-detectable to low concentrations of OCPs in all samples tested below the
adopted NEPM EIL and NEPM HIL A criteria at all sample locations.
▪ Landserv concludes that based on the data gathered during a preliminary soil
investigation for OCP that there is negligible risk to human health when results
are compared to conservative health investigation levels.
It should be noted that, not having physically investigated the whole site, Landserv
cannot exclude the possibility of localised contamination of natural soils, or of small
volumes of contaminated fill or waste being encountered at the site.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 11
7 LIMITATIONS
This report has been prepared by Landserv Pty Ltd (Landserv) only for the use of VSBA.
No other parties should rely on the information in this report without prior written consent
from Landserv and VSBA.
Landserv has performed its services for this project in accordance with the scope of
work commissioned by VSBA and in a manner consistent with the level of quality and
skill generally exercised by members of its profession.
It should be noted that geological, environmental and contamination conditions often
vary from those observed at the locations where investigation data has been obtained.
Limited data can therefore result in uncertainty in the interpretation of geological,
environmental and contamination conditions.
Geological, environmental and contamination conditions also often vary with the
passing of time after the data is obtained, as do regulatory requirements, laws and
guideline criteria.
Landserv cannot exclude the possibility of localised contamination of natural soils, or of
contaminated fill or waste being encountered during any earthworks.
Despite Landserv’s due professional care, all of these uncertainties should be
considered in relying and acting on the information contained in our reports. This is
particularly relevant if few locations have been sampled, if a report is used after a
significant delay in time, if regulations and guideline criteria are known to have
changed, or if a change is proposed to the land use for the site.
Opinions and recommendations in this report are based on the information available to
Landserv at the time of undertaking the works, including the information gained during
the investigation. The information in this report relating to the current condition of the
Site is considered to be accurate at the time the report is issued.
No warranty of site conditions is intended.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 12
8 REFERENCES
Department of Environment and Primary (formerly Department of Sustainability and
Environment) (2005), General Practice Note, Potentially Contaminated Land, June 2005.
Environment Protection Authority Victoria (2009), Industrial Waste Resource Guidelines,
Soil Sampling, publication IWRG702, June 2009.
National Environment Protection Council (1999), National Environment Protection
(Assessment of Site Contamination) Amendment Measure 2013 (No. 1), 1999.
Standards Australia (2005), Australian Standard Guide to the sampling and investigation
of potentially contaminated soil Part 1: Non-volatile and semi-volatile compounds.
Publication AS 4482.1, 2005.
State Environment Protection Policy (2002), Prevention and Management of
Contamination of Land (‘Land SEPP’), June 2002.
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18 13
9 ABBREVIATIONS
AHD Australian Height Datum
BH Borehole
COC Chain of Custody
DBYD Dial Before You Dig
EIL Ecological investigation Level
ESL Ecological Screening Level
EPA Environment Protection Authority
ESA Environmental Site Assessment
GIL Groundwater Investigation Level
HIL Health Investigation Level
HSL Health Screening Level
HSEP Health, Safety and Environment Plan
LOR Limit of reporting
mBGL Metres Below Ground Level
MGA Map Grid of Australia
NATA National Authority of Testing Authorities
NEPC National Environment Protection Council
NEPM National Environment Protection Measure
QA/QC Quality Assurance/Quality Control
RPD Relative Percent Difference
SEPP State Environmental Protection Policies
SWMS Safe Work Method Statement
Preliminary Soil Investigation
Bellarine Secondary College – Drysdale Campus
G0611_RPT004_OCP Bellarine_21Sep18
APPENDIX A
FIGURES
Belchers Road
Jurg
ens R
oad
Project Number :
Drawn By :
Checked By :
G0611 Date : 20 Sep 18
Approx. Scale :
Legend :
Figure : 1
0 100 m
Client :
Location :
Figure Title :
VSBA - DET
Bellarine High School, Drysdale Campus
Site Location Plan
N
Horsham Bendigo
Ballarat
MELBOURNE
Geelong Traralgon
Bairnsdale
Shepparton Wangaratta
Wodonga
Swan Hill
Mildura
Hamilton
Portland Warrnambool
Not to scale
T: 03 5222 4173PO Box 1628 Geelong VIC 3220
Email [email protected]
GEELONG OFFICE14 Albert Street,Geelong West Vic 3218 T: 03 9646 0833
MELBOURNE OFFICE293A Bay Street, Port Melbourne
Revision : -
Drysdale
Approx. Site BoundaryApprox. Site Location
Client :
Location :
Figure Title :
Project Number :
Drawn By :
Legend :
T: 03 5222 4173PO Box 1628 Geelong VIC 3220
GEELONG OFFICE
T: 03 9646 0833
MELBOURNE OFFICE293A Bay Street, Port Melbourne14 Albert Street
Scale :
VSBA - DET
Bellarine High Scool, Drysdale Campus
Soil Sample Location Plan
G0611
Revision : -
Date : 31 August 2018
100 mGeelong West, Vic 3218
Figure : 2
Checked By :
4,4
-DD
E
a-B
HC
Ald
rin
Ald
rin
+ D
ield
rin
b-B
HC
ch
lord
an
e
Ch
lord
an
e (
cis
)
Ch
lord
an
e (
tra
ns)
d-B
HC
DD
D
DD
T
DD
T+D
DE+
DD
D
Die
ldrin
En
do
sulfa
n
mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg
EQL 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
NEPM 2013 Table 1A(1) HILs Res A Soil - - - 6 - 50 - - - - - 240 - 270
NEPM 2013 Table 1B(5) Generic EIL - Urban Res & Public Open Space - - - - - - - - - - 180 - - -
Lab Report Number Sample Code Field ID Date
18-39770 18-39770_5792306 BH01-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792308 BH02-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792310 BH03-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792312 BH04-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792313 BH04-0.5 1/09/2018 <0.05 <0.05 <0.05 0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.05 <0.05
18-39770 18-39770_5792314 BH05-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792316 BH06-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792317 BH06-0.5 1/09/2018 0.08 <0.05 <0.05 0.13 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.08 0.13 <0.05
18-39770 18-39770_5792318 BH07-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792320 BH08-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792321 BH08-0.5 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792322 BH09-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792323 BH09-0.5 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792324 BH010-0.0 1/09/2018 <0.05 <0.05 <0.05 0.06 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.06 <0.05
18-39770 18-39770_5792327 BH509-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792328 BH11-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792330 BH12-0.0 1/09/2018 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06
18-39770 18-39770_5792332 BH13-0.0 1/09/2018 <0.05 <0.05 <0.05 0.07 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.07 <0.05
18-39770 18-39770_5792334 BH14-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792336 BH15-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792338 BH16-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792339 BH16-0.5 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792340 BH17-0.0 1/09/2018 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06
18-39770 18-39770_5792342 BH18-0.0 1/09/2018 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06
18-39770 18-39770_5792344 BH19-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792345 BH19-0.5 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792346 BH20-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 18-39770_5792349 BH520-0.0 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Organochlorine Pesticides
TABLE 1: Soil Laboratory Analysis Results
CLIENT: Department of Education and Training
SITE: Bellearine Secondary College - Drysdale Campus
PROJECT NUMBER: G0611
EQL
NEPM 2013 Table 1A(1) HILs Res A Soil
NEPM 2013 Table 1B(5) Generic EIL - Urban Res & Public Open Space
Lab Report Number Sample Code Field ID Date
18-39770 18-39770_5792306 BH01-0.0 1/09/2018
18-39770 18-39770_5792308 BH02-0.0 1/09/2018
18-39770 18-39770_5792310 BH03-0.0 1/09/2018
18-39770 18-39770_5792312 BH04-0.0 1/09/2018
18-39770 18-39770_5792313 BH04-0.5 1/09/2018
18-39770 18-39770_5792314 BH05-0.0 1/09/2018
18-39770 18-39770_5792316 BH06-0.0 1/09/2018
18-39770 18-39770_5792317 BH06-0.5 1/09/2018
18-39770 18-39770_5792318 BH07-0.0 1/09/2018
18-39770 18-39770_5792320 BH08-0.0 1/09/2018
18-39770 18-39770_5792321 BH08-0.5 1/09/2018
18-39770 18-39770_5792322 BH09-0.0 1/09/2018
18-39770 18-39770_5792323 BH09-0.5 1/09/2018
18-39770 18-39770_5792324 BH010-0.0 1/09/2018
18-39770 18-39770_5792327 BH509-0.0 1/09/2018
18-39770 18-39770_5792328 BH11-0.0 1/09/2018
18-39770 18-39770_5792330 BH12-0.0 1/09/2018
18-39770 18-39770_5792332 BH13-0.0 1/09/2018
18-39770 18-39770_5792334 BH14-0.0 1/09/2018
18-39770 18-39770_5792336 BH15-0.0 1/09/2018
18-39770 18-39770_5792338 BH16-0.0 1/09/2018
18-39770 18-39770_5792339 BH16-0.5 1/09/2018
18-39770 18-39770_5792340 BH17-0.0 1/09/2018
18-39770 18-39770_5792342 BH18-0.0 1/09/2018
18-39770 18-39770_5792344 BH19-0.0 1/09/2018
18-39770 18-39770_5792345 BH19-0.5 1/09/2018
18-39770 18-39770_5792346 BH20-0.0 1/09/2018
18-39770 18-39770_5792349 BH520-0.0 1/09/2018
TABLE 1: Soil Laboratory Analysis Results
CLIENT: Department of Education and Training
SITE: Bellearine Secondary College - Drysdale Campus
PROJECT NUMBER: G0611
Halogenated
Benzenes
En
do
sulfa
n I
En
do
sulfa
n I
I
En
do
sulfa
n
sulp
ha
te
En
drin
En
drin
ald
eh
yd
e
En
drin
ke
ton
e
g-B
HC
(Li
nd
an
e)
He
pta
ch
lor
He
pta
ch
lor
ep
ox
ide
Me
tho
xy
ch
lor
Ox
yc
hlo
rda
ne
He
xa
ch
loro
be
nze
n
e
mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
- - - 10 - - - 6 - 300 - 10
- - - - - - - - - - - -
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06
<0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06 <0.06
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Organochlorine Pesticides
4,4
-DD
E
a-B
HC
Ald
rin
Ald
rin
+ D
ield
rin
b-B
HC
ch
lord
an
e
Ch
lord
an
e (
cis
)
Ch
lord
an
e (
tra
ns)
d-B
HC
DD
D
DD
T
DD
T+D
DE+
DD
D
Die
ldrin
mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg
EQL 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
Lab Report Number Field ID Matrix Type Date
18-39770 BH09-0.0 soil 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 BH509-0.0 soil 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
RPD 0 0 0 0 0 0 0 0 0 0 0 0 0
18-39770 BH09-0.0 soil 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
14734 BH609-0.0 soil 1/09/2018 <0.1 <0.1 <0.1 - <0.1 - <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1
RPD 0 0 0 - 0 - 0 0 0 0 0 0 0
18-39770 BH20-0.0 soil 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
18-39770 BH520-0.0 soil 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
RPD 0 0 0 0 0 0 0 0 0 0 0 0 0
18-39770 BH20-0.0 soil 1/09/2018 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
14734 BH620-0.0 soil 1/09/2018 <0.1 <0.1 <0.1 - <0.1 - <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1
RPD 0 0 0 - 0 - 0 0 0 0 0 0 0
Organochlorine Pesticides
TABLE 2: Soil Laboratory Field QA/QC Results
CLIENT: VSBA
SITE: Bellarine Secondary College - Drysdale Campus
PROJECT NUMBER: G0611
EQL
Lab Report Number Field ID Matrix Type Date
18-39770 BH09-0.0 soil 1/09/2018
18-39770 BH509-0.0 soil 1/09/2018
RPD
18-39770 BH09-0.0 soil 1/09/2018
14734 BH609-0.0 soil 1/09/2018
RPD
18-39770 BH20-0.0 soil 1/09/2018
18-39770 BH520-0.0 soil 1/09/2018
RPD
18-39770 BH20-0.0 soil 1/09/2018
14734 BH620-0.0 soil 1/09/2018
RPD
TABLE 2: Soil Laboratory Field QA/QC Results
CLIENT: VSBA
SITE: Bellarine Secondary College - Drysdale Campus
PROJECT NUMBER: G0611
Halogenated
Benzenes
En
do
sulfa
n
En
do
sulfa
n I
En
do
sulfa
n I
I
En
do
sulfa
n
sulp
ha
te
En
drin
En
drin
ald
eh
yd
e
En
drin
ke
ton
e
g-B
HC
(Li
nd
an
e)
He
pta
ch
lor
He
pta
ch
lor
ep
ox
ide
Me
tho
xy
ch
lor
Ox
yc
hlo
rda
ne
He
xa
ch
loro
be
nze
n
e
mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg
0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
0 0 0 0 0 0 0 0 0 0 0 0 0
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
- <0.1 <0.1 <0.1 <0.1 <0.1 - <0.1 <0.1 <0.1 <0.1 - <0.1
- 0 0 0 0 0 - 0 0 0 0 - 0
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
0 0 0 0 0 0 0 0 0 0 0 0 0
<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
- <0.1 <0.1 <0.1 <0.1 <0.1 - <0.1 <0.1 <0.1 <0.1 - <0.1
- 0 0 0 0 0 - 0 0 0 0 - 0
Organochlorine Pesticides
Lab Report NumberSample
DateNumber
RPD
range %
No. within
recommended
range
NumberRecovery
range %Type
No. within
recommended
range
Number
No. within
recommended
range
18-39770 1/09/2018 52 0-20 52 44 81.8-122 MS 44 52 52
14734 1/09/2018 - - - 11 64-84 LCS 11 21 21
Duplicates Spikes Blanks
TABLE 3: Results of Laboratory QA/QC Analysis
CLIENT: VSBA
SITE: Bellarine Secondary College - Drysdale Campus
PROJECT NUMBER: G0611
La−ftCHAIN OF CUSTODY
18−36177()LANDSERV DETAILS LABORATORY DETAILSAddress: 14 Albert St. Geelong West. VIa 3218 Tel: 61 352224173 Lab. Name: ALS Be.Project Manager.
E,moll: j a n d s e r v . c o m . c u Lob. Address: 22 Dolmore Drive, Scoresby, VIC Preliminary Report by:
Contact Name: fInal Report by:
Tel: Lab Oriole No: SC/266/1 7Sampled By: I,andserv Project No: 00611 Project Name: Ballerina OCR
SpeclRcoltons:
− − −Analysis Request
−
I. TAT requked? Standard
Yes /No − 11111111111111iIi o lii i −other−2. Fast TAT Guarantee Required? No C
3. Is any sediment layer present in waters to be excluded from extractions?: No − L A N I)4. %extraneouu material removed from samples to be reported as per NEPM 5,1.1?: Na nSERV
5. Specie] slorogerequkements: No 8 LANOSERV 18−397706. Lowreporting limlisrequked forgraundwateq? Na MEL•C04 Due Dale: 10/0912016
Lob I.D. Number Sample ID SamMold. Preservolloss Container
ple Date − − −sell waler leochote RUed acid Ice (No. & type)
BHOI'O.O 1/09/2018 x x lxglonujor i<
BH0b0.5 1/09/2018 X X legIons ar
E1−1024).0 /09/1018 N N Isgiassjar
111020.5 1/09/2018 N IC lxglasslar
BHO3'O.O 1/09/2018 N N txolasslar x
8H03−0,S 1/09/2018 X x lxglossjar
E1104'0,0 /09/2018 5 N lxglassjar
111040.5 1/09/2018 N 0 lx glaxn or 'C−
E1105−0.0 1/09/2018 N 0 lx glasn or N
11105−0.5 1/09/2018 N S lxglosnlar
81106−0.0 5/09/1018 N N lxglaxslar x
51−106−0.5 1/09/2018 N N lxglcssjar X
tt407−0.0 1/09/2018 5 5 lxglarujar
31107−0.5 1/09/2018 5 0 lx glass or
81108−0.0 1/09/2018 N S leglasajor N
BHO8−0.5 1/09/2018 N IC lxglassjar N
81409−0.0 1/09/2018 N N lxglasujar N
11109−0.5 IM9/2018 N S lx glasslar N
8 1 1 0 1 0 − 0 . 0 / 0 9 / 2 0 1 8 5 Se Ixglaxsjar X
11110−0.5 1 0 I X I 8 N N ixglosslar
8115074,5 /09/2018 IC N Isglasslor
811509−0,0 1/09/2018 N N lxglasnjar N
LabReportNa. LEnkylDRelinquished by: Signed: Date: Relinquished by: Signed: Date:
Received by: Signed: Dat ' Received by: Signed: Dole:
dIntv.es'ppuas.......M5_F007o_RovE_i OMayl 3_Chain_OLCrntody_Geeuang
2'−.
18-3977018-39770
LhdservCHAIN OF CUSTODY
LAN0000V DETAILS LASOPATORY DETAILSAddress: 14 Albert SI, Geeloog West, Vic 3218 Trek 61 352224173 USIAName; ALS PasoProject Manager
Snarl: I o n d s e r v . c o m , o u Lob. Address: 22 Dolmcce Drive. Scoresby. VIC Preanirnery R . I . by:
Contact Name: floral 0eperi bwret Lob Outs. No: SC/266/0 7
Sonr l . d By: Ln,idoeni Project Nor 00605 Project Horn.: B .H.M. DC?
Specltcatio,rr:
.MCETb Request
Yes /nto
___________Oltrer
I. M r reqtirod? StandardNo
2. Parr TAT Guarantee Required? No 03. is orysedirnont layer preronl inwalors l o b e oucludod lons orlracltcorn: No1. %aolraneous maloriol romovod from romplor l obe roporled or per NSPMS.l.r7: No5. SpecIal rtorogo rrqolrorireorrc No 8
6. Law oeporcrg iir'rdtr required for groundwoierr? No
Mains Preservation j ConlokrerLou, I.D. Number Sample ID Sample Oatc − − −−'−−Isoil I worse leoctrole filredl acid I Ice (No. & lype)
ell 11.0.0 1/07/2018 0 0
al
16910cr jar
Bifi .0,5 1/09/2018 0 Is glass Jar
8112−0.0 1)09/2018 0 0 1. [.sr jar X− − − −
0H12'03 1/09/1018 0 0 l x glou jar− −
N034.0 1/09/2018 0 0 lxglosr Jar 0
61113.0.5 1/09/2018 0 0 lugl as, jcr− − − −
0H14−0.0 /09/1010 0 0 lx glossjor x−
r1114o3 /09/2008 0 ix as, jar
81:5.0.0 1,09MIS 0 0 luglorrjar
OHIO−U.S 1/09/2018 X S lxqlorcjor
8H16−0.0 /09/2010 0 0 On alassjor
SF616.03 1/09/2018 0−
K lsglorsjor X− − − −
67117.0.9 1/09/2018 0 It lxglorrjor X− − −
8117.0.5 /09/2016 0 0 Is glorsjor
SNOB−GO 1/09/2010 0 X Is aIorsjor 00
OHIO'O.S 1/09/2018 0 0 l x Macs or
84190.5 0(09/2018 0 0 Icalossjor
04117.03 1/09/2018 00 0 I I orors jar
SF6100.0 0/09/lore S I Ixglasrjar
6H20'0.5 0/09/20:8 0 0 Ix glou jar
6H512'0,5 1/09/2018 0 0 Ic 010cr or
0H520−0.0 1/09/1008 00 0 Irarolr jar
cab Bepoil No, Inky ID
Relinquished lust Vence : Oala: Rellnqiflnhed ran, Signed: Dote:
ReceIved b y Signed: Dole: Received o r SIgned: Dole:
iNS 7a_RovOjOMay3_ChaitoLCuslodyGeoIong
Caribbean Business Park, 22 Dalmore Drive, Scoresby, VIC 3179
Sample Receipt Advice (SRA)
ALS WaterA trading name of:
Ecowise Australia Pty Ltd ABN: 94 105 060 320
www.ecowise.com.au www.alsglogal.com
Client Contact:
Phone :
Mobile :
Fax :
Email :
03 5222 4173
@landserv.com.au
Client:
293A Bay Street
PORT MELBOURNE VIC 3207
Landserv Pty Ltd
Lab. Contact :
@alsglobal.com
Phone: (03)
18-39770
Client Job Ref : G0611 Bellarine OCP
Program :
Purchase Order :
NATA report : Reqd.
n/aMisc Analysis
Batch Summary:
No. of Sample(s) :
10-Sep-2018
Date Received :
Scheduled Reporting Date :
ALS Water Batch No :
Delivery Details:
COC Received :
Sample Temperature on Receipt.
Samples preserved where applicable #
Comments:
YES
3.0
44
Please direct any enqeris you have regarding this project to the above ALS Water contact .
C ⁰
3/09/2018 1:54:50PM
ALS Water
Disclaimer : This document contains priviledged and confidential information intended only for the use of the addressee. If you are not the
addressee, you are hereby notified that you must not disseminate, copy or take action of its contents. If you have received this
document in error, please notify the ALS Water immediately.
# Comparisons are made against pretreatment/prersevation as per AS,VICEPA,APHA,USEPA standards
Sample disposal - Aqueous (14 days), Solid (60 days) from date of completio of work order
Client Contact:
Phone :
Mobile :
Fax :
Email :
03 5222 4173
@landserv.com.au
Client:
293A Bay Street
PORT MELBOURNE VIC 3207
Landserv Pty Ltd
Test Count
5792306 BH01-0.0 01/09/2018 2
5792308 BH02-0.0 01/09/2018 2
5792310 BH03-0.0 01/09/2018 2
5792312 BH04-0.0 01/09/2018 2
5792313 BH04-0.5 01/09/2018 2
5792314 BH05-0.0 01/09/2018 2
5792316 BH06-0.0 01/09/2018 2
5792317 BH06-0.5 01/09/2018 2
5792318 BH07-0.0 01/09/2018 2
5792320 BH08-0.0 01/09/2018 2
5792321 BH08-0.5 01/09/2018 2
5792322 BH09-0.0 01/09/2018 2
5792323 BH09-0.5 01/09/2018 2
5792324 BH010-0.0 01/09/2018 2
5792327 BH509-0.0 01/09/2018 2
5792328 BH11-0.0 01/09/2018 2
5792330 BH12-0.0 01/09/2018 2
5792332 BH13-0.0 01/09/2018 2
5792334 BH14-0.0 01/09/2018 2
5792336 BH15-0.0 01/09/2018 2
5792338 BH16-0.0 01/09/2018 2
5792339 BH16-0.5 01/09/2018 2
5792340 BH17-0.0 01/09/2018 2
5792342 BH18-0.0 01/09/2018 2
5792344 BH19-0.0 01/09/2018 2
5792345 BH19-0.5 01/09/2018 2
5792346 BH20-0.0 01/09/2018 2
5792349 BH520-0.0 01/09/2018 2
Summary of Sample and Received Analysis:
Sample Name DateALS Sample
ALS Water
Disclaimer : This document contains priviledged and confidential information intended only for the use of the addressee. If you are not the
addressee, you are hereby notified that you must not disseminate, copy or take action of its contents. If you have received this
document in error, please notify the ALS Water immediately.
# Comparisons are made against pretreatment/prersevation as per AS,VICEPA,APHA,USEPA standards
Sample disposal - Aqueous (14 days), Solid (60 days) from date of completio of work order
CERTIFICATE OF ANALYSIS
05-Sep-2018
Page 1 of 6
707563
Caribbean Business Park, 22 Dalmore Drive, Scoresby, VIC 3179
Scoresby Laboratory
03 8756 800003 9763 1862
293A Bay Street
PORT MELBOURNE VIC 3207
Final Report
18-39770
Landserv Pty Ltd
Batch No:
Client:
Contact:
Address:
Client Program Ref:
ALS Program Ref:
PO No:
G0611 Bellarine OCP
LANDSERV
Not Available
Page
Laboratory
AddressPhoneFax
Contact:
Date Sampled:
Date Samples Received:
Date Issued:
Client Manager
@alsglobal.com
01-Sep-2018
03-Sep-2018
The hash (#) below indicates methods not covered by NATA accreditation in the performance of this service .
Analysis Method Laboratory Analysis Method Laboratory Analysis Method Laboratory
WP068A ScoresbyOCP
Name Title Name Title
Team Leader Organics Chemist/Analyst
Measurement Uncertainties values for your compliance results are available at this link
Signatories
RIGHT SOLUTIONS | RIGHT PARTNER Page: Page 1 of 6
18-39770
G0611 Bellarine OCP
707563
Page 2 of 6
Landserv Pty Ltd
Page:
Batch No:
Report Number:
Client:
Client Program Ref:
Sample Sampled Date Your Ref
OCP OCP OCP OCP OCP OCP OCP OCP OCP
BHC (alpha)
mg/kg
a-Endosulphan
mg/kg
Aldrin
mg/kg
BHC (beta)
mg/kg
b-Endosulphan
mg/kg
Chlordane
mg/kg
cis-Chlordane
mg/kg
trans-Chlordane
mg/kg
BHC (delta)
mg/kg
5792306 01-09-18 BH01-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792308 01-09-18 BH02-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792310 01-09-18 BH03-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792312 01-09-18 BH04-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792313 01-09-18 BH04-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792314 01-09-18 BH05-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792316 01-09-18 BH06-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792317 01-09-18 BH06-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792318 01-09-18 BH07-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792320 01-09-18 BH08-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792321 01-09-18 BH08-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792322 01-09-18 BH09-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792323 01-09-18 BH09-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792324 01-09-18 BH010-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792327 01-09-18 BH509-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792328 01-09-18 BH11-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792330 01-09-18 BH12-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792332 01-09-18 BH13-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792334 01-09-18 BH14-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792336 01-09-18 BH15-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792338 01-09-18 BH16-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792339 01-09-18 BH16-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792340 01-09-18 BH17-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792342 01-09-18 BH18-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792344 01-09-18 BH19-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792345 01-09-18 BH19-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792346 01-09-18 BH20-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792349 01-09-18 BH520-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Analysis:
Component:
Units:
Sample Type
Soil O.C. Pesticides
LORR Limit of Reporting has been raised due to high moisture content, insufficient sample or matrix interference.
A blank space indicates no test performed. Soil results expressed in mg/kg dry weight unless specified otherwise. Soil microbiological testing was commenced within 48 hours from the day received unless otherwise stated.
Water microbiological testing was commenced on the day received and within 24 hours of sampling unless otherwise stated.
MM524: Plate count results <10 per mL and >300 per mL are deemed as approximate.
MM526: Plate count results <2,500 per mL and >250,000 per mL are deemed as approximate.
Calculated results are based on raw data.
Samples not collected by ALS and are tested as received.
18-39770
G0611 Bellarine OCP
707563
Page 3 of 6
Landserv Pty Ltd
Page:
Batch No:
Report Number:
Client:
Client Program Ref:
Sample Sampled Date Your Ref
OCP OCP OCP OCP OCP OCP OCP OCP OCP
DDD
mg/kg
DDE
mg/kg
DDT
mg/kg
Dieldrin
mg/kg
Endosulphan
mg/kg
Endosulfan Sulfate
mg/kg
Endrin
mg/kg
Endrin Aldehyde
mg/kg
Endrin Ketone
mg/kg
5792306 01-09-18 BH01-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792308 01-09-18 BH02-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792310 01-09-18 BH03-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792312 01-09-18 BH04-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792313 01-09-18 BH04-0.5 SOIL <0.05 <0.05 <0.05 0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792314 01-09-18 BH05-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792316 01-09-18 BH06-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792317 01-09-18 BH06-0.5 SOIL <0.05 0.08 <0.05 0.13 <0.05 <0.05 <0.05 <0.05 <0.05
5792318 01-09-18 BH07-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792320 01-09-18 BH08-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792321 01-09-18 BH08-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792322 01-09-18 BH09-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792323 01-09-18 BH09-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792324 01-09-18 BH010-0.0 SOIL <0.05 <0.05 <0.05 0.06 <0.05 <0.05 <0.05 <0.05 <0.05
5792327 01-09-18 BH509-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792328 01-09-18 BH11-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792330 01-09-18 BH12-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792332 01-09-18 BH13-0.0 SOIL <0.05 <0.05 <0.05 0.07 <0.05 <0.05 <0.05 <0.05 <0.05
5792334 01-09-18 BH14-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792336 01-09-18 BH15-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792338 01-09-18 BH16-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792339 01-09-18 BH16-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792340 01-09-18 BH17-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792342 01-09-18 BH18-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792344 01-09-18 BH19-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792345 01-09-18 BH19-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792346 01-09-18 BH20-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792349 01-09-18 BH520-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Analysis:
Component:
Units:
Sample Type
Soil O.C. Pesticides
LORR Limit of Reporting has been raised due to high moisture content, insufficient sample or matrix interference.
A blank space indicates no test performed. Soil results expressed in mg/kg dry weight unless specified otherwise. Soil microbiological testing was commenced within 48 hours from the day received unless otherwise stated.
Water microbiological testing was commenced on the day received and within 24 hours of sampling unless otherwise stated.
MM524: Plate count results <10 per mL and >300 per mL are deemed as approximate.
MM526: Plate count results <2,500 per mL and >250,000 per mL are deemed as approximate.
Calculated results are based on raw data.
Samples not collected by ALS and are tested as received.
18-39770
G0611 Bellarine OCP
707563
Page 4 of 6
Landserv Pty Ltd
Page:
Batch No:
Report Number:
Client:
Client Program Ref:
Sample Sampled Date Your Ref
OCP OCP OCP OCP OCP OCP OCP OCP
HexaChlorBenzene
mg/kg
Heptchlor Epoxide
mg/kg
Heptachlor
mg/kg
Lindane
mg/kg
Methoxychlor
mg/kg
Oxychlordane
mg/kg
DDD+DDE+DDT
mg/kg
Aldrin and Dieldrin
mg/kg
5792306 01-09-18 BH01-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792308 01-09-18 BH02-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792310 01-09-18 BH03-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792312 01-09-18 BH04-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792313 01-09-18 BH04-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.05
5792314 01-09-18 BH05-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792316 01-09-18 BH06-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792317 01-09-18 BH06-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.08 0.13
5792318 01-09-18 BH07-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792320 01-09-18 BH08-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792321 01-09-18 BH08-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792322 01-09-18 BH09-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792323 01-09-18 BH09-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792324 01-09-18 BH010-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.06
5792327 01-09-18 BH509-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792328 01-09-18 BH11-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792330 01-09-18 BH12-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792332 01-09-18 BH13-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.07
5792334 01-09-18 BH14-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792336 01-09-18 BH15-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792338 01-09-18 BH16-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792339 01-09-18 BH16-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792340 01-09-18 BH17-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792342 01-09-18 BH18-0.0 SOIL <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR <0.06 LORR
5792344 01-09-18 BH19-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792345 01-09-18 BH19-0.5 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792346 01-09-18 BH20-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792349 01-09-18 BH520-0.0 SOIL <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Analysis:
Component:
Units:
Sample Type
Soil O.C. Pesticides
LORR Limit of Reporting has been raised due to high moisture content, insufficient sample or matrix interference.
A blank space indicates no test performed. Soil results expressed in mg/kg dry weight unless specified otherwise. Soil microbiological testing was commenced within 48 hours from the day received unless otherwise stated.
Water microbiological testing was commenced on the day received and within 24 hours of sampling unless otherwise stated.
MM524: Plate count results <10 per mL and >300 per mL are deemed as approximate.
MM526: Plate count results <2,500 per mL and >250,000 per mL are deemed as approximate.
Calculated results are based on raw data.
Samples not collected by ALS and are tested as received.
18-39770
G0611 Bellarine OCP
707563
Page 5 of 6
Landserv Pty Ltd
Page:
Batch No:
Report Number:
Client:
Client Program Ref:
Quality ControlOCP OCP OCP OCP OCP OCP OCP OCP OCP
BHC (alpha) a-Endosulphan Aldrin BHC (beta) b-Endosulphan Chlordane cis-Chlordane trans-Chlordane BHC (delta)
5792906 DUPLICATE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792906 DUPLICATE Duplicate Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792906 DUPLICATE % RPD 0 0 0 0 0 0 0 0 0
5792312 SPIKE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792312 SPIKE Expected Value 1.6 1.6 1.6 1.6 1.6 3.2 1.6 1.6 1.6
5792312 SPIKE % Recovery 97.8 105 122 106 106 121 118 122 106
5795020 BLANK Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792344 SPIKE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792344 SPIKE Expected Value 1.5 1.5 1.5 1.5 1.5 2.9 1.5 1.5 1.5
5792344 SPIKE % Recovery 99.0 111 109 111 108 100 100 100 109
5793045 DUPLICATE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5793045 DUPLICATE Duplicate Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5793045 DUPLICATE % RPD 0 0 0 0 0 0 0 0 0
5795228 BLANK Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Soil O.C. Pesticides
OCP OCP OCP OCP OCP OCP OCP OCP OCP
DDD DDE DDT Dieldrin Endosulphan Endosulfan Sulfate Endrin Endrin Aldehyde Endrin Ketone
5792906 DUPLICATE Sample Value <0.05 <0.05 <0.05 0.28 <0.05 <0.05 <0.05 <0.05 <0.05
5792906 DUPLICATE Duplicate Value <0.05 <0.05 <0.05 0.23 <0.05 <0.05 <0.05 <0.05 <0.05
5792906 DUPLICATE % RPD 0 0 0 21.5 0 0 0 0 0
5792312 SPIKE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792312 SPIKE Expected Value 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6
5792312 SPIKE % Recovery 95.8 96.4 83.6 108 86.2 115 97.6 94.6
5795020 BLANK Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792344 SPIKE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792344 SPIKE Expected Value 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
5792344 SPIKE % Recovery 103 93.0 87.2 103 98.4 103 86.8 94.8
5793045 DUPLICATE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5793045 DUPLICATE Duplicate Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5793045 DUPLICATE % RPD 0 0 0 0 0 0 0 0 0
5795228 BLANK Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Soil O.C. Pesticides
A blank space indicates no test performed. Soil results expressed in mg/kg dry weight unless specified otherwise. Soil microbiological testing was commenced within 48 hours from the day received unless otherwise stated.
Water microbiological testing was commenced on the day received and within 24 hours of sampling unless otherwise stated.
MM524: Plate count results <10 per mL and >300 per mL are deemed as approximate.
MM526: Plate count results <2,500 per mL and >250,000 per mL are deemed as approximate.
Calculated results are based on raw data.
Samples not collected by ALS and are tested as received.
18-39770
G0611 Bellarine OCP
707563
Page 6 of 6
Landserv Pty Ltd
Page:
Batch No:
Report Number:
Client:
Client Program Ref:
OCP OCP OCP OCP OCP OCP OCP OCP
HexaChlorBenzene Heptchlor Epoxide Heptachlor Lindane Methoxychlor Oxychlordane DDD+DDE+DDT Aldrin and Dieldrin
5792906 DUPLICATE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.28
5792906 DUPLICATE Duplicate Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.23
5792906 DUPLICATE % RPD 0 0 0 0 0 0 0 19.6
5792312 SPIKE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05
5792312 SPIKE Expected Value 1.6 1.6 1.6 1.6 1.6
5792312 SPIKE % Recovery 100 112 110 100 81.8
5795020 BLANK Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5792344 SPIKE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05
5792344 SPIKE Expected Value 1.5 1.5 1.5 1.5 1.5
5792344 SPIKE % Recovery 99.4 94.2 98.2 105 83.6
5793045 DUPLICATE Sample Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5793045 DUPLICATE Duplicate Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
5793045 DUPLICATE % RPD 0 0 0 0 0 0 0 0
5795228 BLANK Value <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05
Soil O.C. Pesticides
A blank space indicates no test performed. Soil results expressed in mg/kg dry weight unless specified otherwise. Soil microbiological testing was commenced within 48 hours from the day received unless otherwise stated.
Water microbiological testing was commenced on the day received and within 24 hours of sampling unless otherwise stated.
MM524: Plate count results <10 per mL and >300 per mL are deemed as approximate.
MM526: Plate count results <2,500 per mL and >250,000 per mL are deemed as approximate.
Calculated results are based on raw data.
Samples not collected by ALS and are tested as received.
Envirolab Services Pty Ltd
ABN 37 112 535 645 - 002
25 Research Drive Croydon South VIC 3136
ph 03 9763 2500 fax 03 9763 2633
www.envirolab.com.au
SAMPLE RECEIPT ADVICE
Attention
Landserv Pty LimitedClient
Client Details
10/09/2018Date Results Expected to be Reported
03/09/2018Date Instructions Received
03/09/2018Date Sample Received
14734Envirolab Reference
G0611 - Bellarine OCPYour reference
Sample Login Details
YESSampling Date Provided
IceCooling Method
2Temperature on Receipt (°C)
StandardTurnaround Time Requested
2 SoilNo. of Samples Provided
YESSamples received in appropriate condition for analysis
Sample Condition
Nil
Comments
Please direct any queries to:
Email: @envirolab.com.auEmail: @envirolab.com.au
Fax: 03 9763 2633Fax: 03 9763 2633
Phone: 03 9763 2500Phone: 03 9763 2500
Analysis Underway, details on the following page:
Page | 1 of 2
Envirolab Services Pty Ltd
ABN 37 112 535 645 - 002
25 Research Drive Croydon South VIC 3136
ph 03 9763 2500 fax 03 9763 2633
www.envirolab.com.au
PBH609-0.0
PBH620-0.0
OC
P in
So
il
Sample ID
The ' THIS IS NOT A REPORT OF THE RESULTS.P' indicates the testing you have requested.
Requests for longer term sample storage must be received in writing.
Sample storage - Waters are routinely disposed of approximately 1 month and soils approximately 2 months from receipt.
Additional Info
Page | 2 of 2
Envirolab Services Pty Ltd
ABN 37 112 535 645 - 002
25 Research Drive Croydon South VIC 3136
ph 03 9763 2500 fax 03 9763 2633
www.envirolab.com.au
CERTIFICATE OF ANALYSIS 14734
293A Bay st, Port Melbourne, VIC, 3207Address
Attention
Landserv Pty LimitedClient
Client Details
03/09/2018Date completed instructions received
03/09/2018Date samples received
2 SoilNumber of Samples
G0611 - Bellarine OCPYour Reference
Sample Details
Results are reported on a dry weight basis for solids and on an as received basis for other matrices.
Samples were analysed as received from the client. Results relate specifically to the samples as received.
Please refer to the following pages for results, methodology summary and quality control data.
Analysis Details
Tests not covered by NATA are denoted with *Accredited for compliance with ISO/IEC 17025 - Testing.
NATA Accreditation Number 2901. This document shall not be reproduced except in full.
07/09/2018Date of Issue
07/09/2018Date results requested by
Report Details
Laboratory Manager
Authorised By
Senior Chemist
Results Approved By
Revision No: R00
14734Envirolab Reference: Page | 1 of 7
Client Reference: G0611 - Bellarine OCP
92100%Surrogate p-Terphenyl-d14
<0.1<0.1mg/kgTotal +ve reported DDT+DDD+DDE
<0.1<0.1mg/kgMethoxychlor
<0.1<0.1mg/kgEndosulfan Sulphate
<0.1<0.1mg/kgpp-DDT
<0.1<0.1mg/kgEndrin Aldehyde
<0.1<0.1mg/kgpp-DDD
<0.1<0.1mg/kgEndosulfan II
<0.1<0.1mg/kgEndrin
<0.1<0.1mg/kgDieldrin
<0.1<0.1mg/kgpp-DDE
<0.1<0.1mg/kgEndosulfan I
<0.1<0.1mg/kgalpha-chlordane
<0.1<0.1mg/kggamma-Chlordane
<0.1<0.1mg/kgHeptachlor Epoxide
<0.1<0.1mg/kgAldrin
<0.1<0.1mg/kgdelta-BHC
<0.1<0.1mg/kgHeptachlor
<0.1<0.1mg/kggamma-BHC
<0.1<0.1mg/kgbeta-BHC
<0.1<0.1mg/kgHexachlorobenzene
<0.1<0.1mg/kgalpha-BHC
07/09/201807/09/2018-Date analysed
05/09/201805/09/2018-Date extracted
SoilSoilType of sample
01/09/201801/09/2018Date Sampled
BH609-0.0BH620-0.0UNITSYour Reference
14734-214734-1Our Reference
OCP in Soil
Envirolab Reference: 14734
R00Revision No:
Page | 2 of 7
Client Reference: G0611 - Bellarine OCP
1420%Moisture
06/09/201806/09/2018-Date analysed
05/09/201805/09/2018-Date prepared
SoilSoilType of sample
01/09/201801/09/2018Date Sampled
BH609-0.0BH620-0.0UNITSYour Reference
14734-214734-1Our Reference
Moisture
Envirolab Reference: 14734
R00Revision No:
Page | 3 of 7
Client Reference: G0611 - Bellarine OCP
Soil samples are extracted with Dichloromethane/Acetone and waters with Dichloromethane and analysed by GC-MS. Note, For OCs the Total +ve reported DDD+DDE+DDT PQL is reflective of the lowest individual PQL and is therefore simply a sum of the positive individually report DDD+DDE+DDT.
Org-012
Moisture content determined by heating at 105 deg C for a minimum of 12 hours.
Inorg-008
Methodology SummaryMethod ID
Envirolab Reference: 14734
R00Revision No:
Page | 4 of 7
Client Reference: G0611 - Bellarine OCP
[NT]84[NT][NT][NT][NT]80Org-012%Surrogate p-Terphenyl-d14
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgMethoxychlor
[NT]64[NT][NT][NT][NT]<0.1Org-0120.1mg/kgEndosulfan Sulphate
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgpp-DDT
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgEndrin Aldehyde
[NT]72[NT][NT][NT][NT]<0.1Org-0120.1mg/kgpp-DDD
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgEndosulfan II
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgEndrin
[NT]68[NT][NT][NT][NT]<0.1Org-0120.1mg/kgDieldrin
[NT]64[NT][NT][NT][NT]<0.1Org-0120.1mg/kgpp-DDE
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgEndosulfan I
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgalpha-chlordane
[NT]68[NT][NT][NT][NT]<0.1Org-0120.1mg/kggamma-Chlordane
[NT]68[NT][NT][NT][NT]<0.1Org-0120.1mg/kgHeptachlor Epoxide
[NT]64[NT][NT][NT][NT]<0.1Org-0120.1mg/kgAldrin
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgdelta-BHC
[NT]64[NT][NT][NT][NT]<0.1Org-0120.1mg/kgHeptachlor
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kggamma-BHC
[NT]68[NT][NT][NT][NT]<0.1Org-0120.1mg/kgbeta-BHC
[NT][NT][NT][NT][NT][NT]<0.1Org-0120.1mg/kgHexachlorobenzene
[NT]68[NT][NT][NT][NT]<0.1Org-0120.1mg/kgalpha-BHC
[NT]07/09/2018[NT][NT][NT][NT]07/09/2018-Date analysed
[NT]05/09/2018[NT][NT][NT][NT]05/09/2018-Date extracted
[NT]LCS-1RPDDup.Base#BlankMethodPQLUnitsTest Description
Spike Recovery %DuplicateQUALITY CONTROL: OCP in Soil
Envirolab Reference: 14734
R00Revision No:
Page | 5 of 7
Client Reference: G0611 - Bellarine OCP
Not ReportedNR
National Environmental Protection MeasureNEPM
Not specifiedNS
Laboratory Control SampleLCS
Relative Percent DifferenceRPD
Greater than>
Less than<
Practical Quantitation LimitPQL
Insufficient sample for this testINS
Test not requiredNA
Not testedNT
Result Definitions
Australian Drinking Water Guidelines recommend that Thermotolerant Coliform, Faecal Enterococci, & E.Coli levels are less than1cfu/100mL. The recommended maximums are taken from "Australian Drinking Water Guidelines", published by NHMRC & ARMC2011.
Surrogates are known additions to each sample, blank, matrix spike and LCS in a batch, of compounds whichare similar to the analyte of interest, however are not expected to be found in real samples.
Surrogate Spike
This comprises either a standard reference material or a control matrix (such as a blank sand or water) fortifiedwith analytes representative of the analyte class. It is simply a check sample.
LCS (LaboratoryControl Sample)
A portion of the sample is spiked with a known concentration of target analyte. The purpose of the matrix spikeis to monitor the performance of the analytical method used and to determine whether matrix interferencesexist.
Matrix Spike
This is the complete duplicate analysis of a sample from the process batch. If possible, the sample selectedshould be one where the analyte concentration is easily measurable.
Duplicate
This is the component of the analytical signal which is not derived from the sample but from reagents,glassware etc, can be determined by processing solvents and reagents in exactly the same manner as forsamples.
Blank
Quality Control Definitions
Envirolab Reference: 14734
R00Revision No:
Page | 6 of 7
Client Reference: G0611 - Bellarine OCP
Measurement Uncertainty estimates are available for most tests upon request.
Where sampling dates are not provided, Envirolab are not in a position to comment on the validity of the analysis whererecommended technical holding times may have been breached.
When samples are received where certain analytes are outside of recommended technical holding times (THTs), the analysis hasproceeded. Where analytes are on the verge of breaching THTs, every effort will be made to analyse within the THT or as soon aspracticable.
In circumstances where no duplicate and/or sample spike has been reported at 1 in 10 and/or 1 in 20 samples respectively, thesample volume submitted was insufficient in order to satisfy laboratory QA/QC protocols.
Matrix Spikes, LCS and Surrogate recoveries: Generally 70-130% for inorganics/metals; 60-140% for organics (+/-50% surrogates)and 10-140% for labile SVOCs (including labile surrogates), ultra trace organics and speciated phenols is acceptable.
Duplicates: >10xPQL - RPD acceptance criteria will vary depending on the analytes and the analytical techniques but is typically inthe range 20%-50% – see ELN-P05 QA/QC tables for details; <10xPQL - RPD are higher as the results approach PQL and theestimated measurement uncertainty will statistically increase.
For VOCs in water samples, three vials are required for duplicate or spike analysis.
Spikes for Physical and Aggregate Tests are not applicable.
Filters, swabs, wipes, tubes and badges will not have duplicate data as the whole sample is generally extracted during sampleextraction.
Duplicate sample and matrix spike recoveries may not be reported on smaller jobs, however, were analysed at a frequency to meetor exceed NEPM requirements. All samples are tested in batches of 20. The duplicate sample RPD and matrix spike recoveries forthe batch were within the laboratory acceptance criteria.
Laboratory Acceptance Criteria
Envirolab Reference: 14734
R00Revision No:
Page | 7 of 7