preliminary design (30%) with north/south landform …
TRANSCRIPT
OPTION 3R P1-A-1AMID-BLOCK GRADING SOLUTIONWITH NORTH/SOUTH LANDFORM
PRELIMINARY DESIGN (30%)
ENBRIDGE SHAFTAND PIPES
METROLINX RAIL EMBANKMENT
TO
E O
F F
PL
TOE
OF 3.
5% D
RY S
IDE
SLOP
E FP
L
4SUNCONSOLIDATIONSEWER
4SUN FLAP GATECHAMBER
VORTEXAPPROACHCHANNEL
REVISED DEAERATIONAND ADIT TUNNEL
ALIGNMENT
C
B
C
B
A
A
D
D
EE
F
CITY PROPERTY PARCEL
EXISTINGENTRANCE
EXISTINGENTRANCE
5 m WIDTHOF CREST
TW: 78.30mBW: 78.07m
2002 PROPERTYSURVEY PARCEL
GG
LANDFORM TIED INTO METROLINXRAILEMBANKMENT/STATION BOX
WITH ANTI-SEEPAGE COLLAR
LANDFORM TIED INTOEASTERN AVE. EMBANKMENTWITH ANTI-SEEPAGE COLLAR
EASTERN AVE
F
OPTION 3R P1-1AMID-BLOCK GRADING SOLUTION WITH NORTH/SOUTH
LANDFORM INTEGRATION
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON ESTABLISHMENT OF
EXISTING CONDITIONS SERVICING USING UNRECTIFIED
PHOTOS FROM THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING INFRASTRUCTURE
HAS NOT BEEN COMPLETED. EXISTING INFRASTRUCTURE
MAY NOT BE TO SCALE OR SITED CORRECTLY.
2. PORTION OF SUNLIGHT PARK ROAD REMOVED, EASTERN
RAMP TO BE RE-CONSTRUCTED IN PLACE.
3. LEVEL OF FLOOD PROTECTION FOR LANDFORM AND
GRADING FEATURE INCLUDES REGIONAL STORM WATER
SURFACE ELEVATION PLUS 0.5 m FREEBOARD.
4. TRCA FLOOD PROTECTION LAND FORMING TECHNICAL
DESIGN CONSIDERATIONS SLOPE REQUIREMENTS: WET SIDE
MAXIMUM SLOPE OF 5-10% WITH 10-15% ALLOWABLE FOR
LOCALIZED AREAS AND DRY SIDE MAXIMUM SLOPE OF 1.5 -
3.5% (APPLICABLE TO LANDFORM ONLY).
5. CONTOUR AND SPOT ELEVATION LABELS "EX" AND "PR"
INDICATE EXISTING AND PROPOSED CONDITIONS.
6. DURING THE REGIONAL STORM EVENT, THE FLOOD
PROTECTION LANDFORM IS ANTICIPATED TO BE SUBJECT TO
VELOCITIES BETWEEN 1 AND 4 m FOR THE NORTH LANDFORM
AND < 0.5 m FOR THE SOUTH LANDFORM. TOE EROSION
PROTECTION SHOULD BE CONFIRMED AT DETAILED AND HAS
BEEN ASSUMED TO BE ARMORSTONE FOR COSTING
PURPOSES.
7. FLOOD PROTECTION LANDFORM DESIGN INCLUDES A CLAY
CORE WITH 66.7% SIDE SLOPES EXTENDING FROM THE
CREST OF THE LANDFORM TO THE EXISTING GROUND AND
HAS BEEN ASSUMED TO BE KEYED INTO A DEPTH OF 5 m FOR
COSTING PURPOSES. FURTHER REFINEMENT TO THE KEY IN
DEPTH SHOULD BE UNDERTAKEN AT DETAILED DESIGN.
DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
NO. DATE REVISIONS
1:500
SCALE:
DATE:
FIGURE:
PRELIMINARY DESIGN (30%)
1
2
3
4
DEC. 14, 20205
C001
76
78
80
82
84
76
78
80
82
84
76
78
80
82
84
86
76
78
80
82
84
86
74
76
78
80
82
84
86
74
76
78
80
82
84
86
FIGURE
DATE:
NO. DATE REVISIONS
DEC. 14, 2020C002
SCALE:
HORIZONTAL: 1:750VERTICAL: 1:75
DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
PRELIMINARY DESIGN (30%) 1
2
3
4
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON ESTABLISHMENT OF
EXISTING CONDITIONS SERVICING USING UNRECTIFIED
PHOTOS FROM THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING INFRASTRUCTURE
HAS NOT BEEN COMPLETED. EXISTING INFRASTRUCTURE
MAY NOT BE TO SCALE OR SITED CORRECTLY.
2. PORTION OF SUNLIGHT PARK ROAD REMOVED, EASTERN
RAMP TO BE RE-CONSTRUCTED IN PLACE.
3. LEVEL OF FLOOD PROTECTION FOR LANDFORM AND
GRADING FEATURE INCLUDES REGIONAL STORM WATER
SURFACE ELEVATION PLUS 0.5 m FREEBOARD.
4. TRCA FLOOD PROTECTION LAND FORMING TECHNICAL
DESIGN CONSIDERATIONS SLOPE REQUIREMENTS: WET SIDE
MAXIMUM SLOPE OF 5-10% WITH 10-15% ALLOWABLE FOR
LOCALIZED AREAS AND DRY SIDE MAXIMUM SLOPE OF 1.5 -
3.5% (APPLICABLE TO LANDFORM ONLY).
5. CONTOUR AND SPOT ELEVATION LABELS "EX" AND "PR"
INDICATE EXISTING AND PROPOSED CONDITIONS.
6. DURING THE REGIONAL STORM EVENT, THE FLOOD
PROTECTION LANDFORM IS ANTICIPATED TO BE SUBJECT TO
VELOCITIES BETWEEN 1 AND 4 m FOR THE NORTH LANDFORM
AND < 0.5 m FOR THE SOUTH LANDFORM. TOE EROSION
PROTECTION SHOULD BE CONFIRMED AT DETAILED AND HAS
BEEN ASSUMED TO BE ARMORSTONE FOR COSTING
PURPOSES.
7. FLOOD PROTECTION LANDFORM DESIGN INCLUDES A CLAY
CORE WITH 66.7% SIDE SLOPES EXTENDING FROM THE
CREST OF THE LANDFORM TO THE EXISTING GROUND AND
HAS BEEN ASSUMED TO BE KEYED INTO A DEPTH OF 5 m FOR
COSTING PURPOSES. FURTHER REFINEMENT TO THE KEY IN
DEPTH SHOULD BE UNDERTAKEN AT DETAILED DESIGN.
OPTION 3R P1-1AMID-BLOCK GRADING SOLUTION WITH
NORTH/SOUTH LANDFORM INTEGRATION
76
78
80
82
76
78
80
82
76
78
80
82
84
86
76
78
80
82
84
86
76
78
80
82
76
78
80
82
76
78
80
82
76
78
80
82
7576788082
7576788082
FIGURE
DATE:
NO. DATE REVISIONS
DEC. 14, 2020
SCALE:
HORIZONTAL: 1:750VERTICAL: 1:75
DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
PRELIMINARY DESIGN (30%) 1
2
3
4
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON
ESTABLISHMENT OF EXISTING CONDITIONS
SERVICING USING UNRECTIFIED PHOTOS FROM
THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING
INFRASTRUCTURE HAS NOT BEEN COMPLETED.
EXISTING INFRASTRUCTURE MAY NOT BE TO
SCALE OR SITED CORRECTLY.
2. PORTION OF SUNLIGHT PARK ROAD REMOVED,
EASTERN RAMP TO BE RE-CONSTRUCTED IN
PLACE.
3. LEVEL OF FLOOD PROTECTION FOR LANDFORM
AND GRADING FEATURE INCLUDES REGIONAL
STORM WATER SURFACE ELEVATION PLUS 0.5 m
FREEBOARD.
4. TRCA FLOOD PROTECTION LAND FORMING
TECHNICAL DESIGN CONSIDERATIONS SLOPE
REQUIREMENTS: WET SIDE MAXIMUM SLOPE OF
5-10% WITH 10-15% ALLOWABLE FOR LOCALIZED
AREAS AND DRY SIDE MAXIMUM SLOPE OF 1.5 -
3.5% (APPLICABLE TO LANDFORM ONLY).
5. CONTOUR AND SPOT ELEVATION LABELS "EX"
AND "PR" INDICATE EXISTING AND PROPOSED
CONDITIONS.
6. DURING THE REGIONAL STORM EVENT, THE
FLOOD PROTECTION LANDFORM IS ANTICIPATED
TO BE SUBJECT TO VELOCITIES BETWEEN 1 AND
4 m FOR THE NORTH LANDFORM AND < 0.5 m FOR
THE SOUTH LANDFORM. TOE EROSION
PROTECTION SHOULD BE CONFIRMED AT
DETAILED AND HAS BEEN ASSUMED TO BE
ARMORSTONE FOR COSTING PURPOSES.
7. FLOOD PROTECTION LANDFORM DESIGN
INCLUDES A CLAY CORE WITH 66.7% SIDE
SLOPES EXTENDING FROM THE CREST OF THE
LANDFORM TO THE EXISTING GROUND AND HAS
BEEN ASSUMED TO BE KEYED INTO A DEPTH OF 5
m FOR COSTING PURPOSES. FURTHER
REFINEMENT TO THE KEY IN DEPTH SHOULD BE
UNDERTAKEN AT DETAILED DESIGN.
OPTION 3R P1-1AMID-BLOCK GRADING SOLUTION WITH
NORTH/SOUTH LANDFORM INTEGRATION
C003
HORIZONTAL: 1:750VERTICAL: 1:75
HORIZONTAL: 1:750VERTICAL: 1:75
HORIZONTAL: 1:250VERTICAL: 1:250
ENBRIDGE SHAFTAND PIPES
4SUNCONSOLIDATIONSEWER
4SUN FLAP GATECHAMBER
VORTEXAPPROACHCHANNEL
REVISED DEAERATIONAND ADIT TUNNEL
ALIGNMENT
0.44 ha
11
0.16 ha
6
0.16 ha
2
0.30 ha
5
0.17 ha
9
0.33 ha
10
0.28 ha
12
0.15 ha
1
0.20 ha
7
0.33 ha
8
0.9
0.9
0.9
0.9
0.9
0.4
0.9
0.4
0.9
0.20 ha
30.9
0.22 ha
40.9
0.9
0.22 ha
13 0.5
0.97 ha
14
0.6
BMW
DEALERSHIP
METROLINX RAIL EMBANKMENT
TO
E O
F F
PL
EASTERN AVE
TOE
OF 3.
5% D
RY S
IDE
SLOP
E FP
L
CITY PROPERTY PARCEL
EXISTINGENTRANCE
5 m WIDTHOF CREST
TW: 78.30mBW: 78.07m
2002 PROPERTYSURVEY PARCEL
EXISTINGENTRANCE
EXISTING STORMSEWER REMAINS
DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
NO. DATE REVISIONS
1:500
SCALE:
DATE:
FIGURE:
1
2
3
4
5
C004OPTION 3R P1-1AMID-BLOCK GRADING SOLUTION WITH NORTH/SOUTH
LANDFORM INTEGRATION w SITE SERVICING PLAN
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON
ESTABLISHMENT OF EXISTING CONDITIONS
SERVICING USING UNRECTIFIED PHOTOS FROM
THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING
INFRASTRUCTURE HAS NOT BEEN COMPLETED.
EXISTING INFRASTRUCTURE MAY NOT BE TO
SCALE OR SITED CORRECTLY.
2. PORTION OF SUNLIGHT PARK ROAD REMOVED,
EASTERN RAMP TO BE RE-CONSTRUCTED IN
PLACE.
3. LEVEL OF FLOOD PROTECTION FOR LANDFORM
AND GRADING FEATURE INCLUDES REGIONAL
STORM WATER SURFACE ELEVATION PLUS 0.5 m
FREEBOARD.
4. TRCA FLOOD PROTECTION LAND FORMING
TECHNICAL DESIGN CONSIDERATIONS SLOPE
REQUIREMENTS: WET SIDE MAXIMUM SLOPE OF
5-10% WITH 10-15% ALLOWABLE FOR LOCALIZED
AREAS AND DRY SIDE MAXIMUM SLOPE OF 1.5 -
3.5% (APPLICABLE TO LANDFORM ONLY).
5. CONTOUR AND SPOT ELEVATION LABELS "EX"
AND "PR" INDICATE EXISTING AND PROPOSED
CONDITIONS.
6. DURING THE REGIONAL STORM EVENT, THE
FLOOD PROTECTION LANDFORM IS ANTICIPATED
TO BE SUBJECT TO VELOCITIES BETWEEN 1 AND
4 m FOR THE NORTH LANDFORM AND < 0.5 m FOR
THE SOUTH LANDFORM. TOE EROSION
PROTECTION SHOULD BE CONFIRMED AT
DETAILED AND HAS BEEN ASSUMED TO BE
ARMORSTONE FOR COSTING PURPOSE.
7. FLOOD PROTECTION LANDFORM DESIGN
INCLUDES A CLAY CORE WITH 66.7% SIDE
SLOPES EXTENDING FROM THE CREST OF THE
LANDFORM TO THE EXISTING GROUND AND HAS
BEEN ASSUMED TO BE KEYED INTO A DEPTH OF
5 m FOR COSTING PURPOSES. FURTHER
REFINEMENT TO THE KEY IN DEPTH SHOULD BE
UNDERTAKEN AT DETAILED DESIGN.
PRELIMINARY DESIGN (30%)
DEC. 14, 2020
70
72
74
76
78
80
82
84
70
72
74
76
78
80
82
84
72
74
76
78
80
82
72
74
76
78
80
82
FIGURE
DATE:
NO. DATE REVISIONS SCALE:
HORIZONTAL: 1:750VERTICAL: 1:75
DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
1
2
3
4
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON
ESTABLISHMENT OF EXISTING CONDITIONS
SERVICING USING UNRECTIFIED PHOTOS FROM
THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING
INFRASTRUCTURE HAS NOT BEEN COMPLETED.
EXISTING INFRASTRUCTURE MAY NOT BE TO
SCALE OR SITED CORRECTLY.
2. PORTION OF SUNLIGHT PARK ROAD REMOVED,
EASTERN RAMP TO BE RE-CONSTRUCTED IN
PLACE.
3. LEVEL OF FLOOD PROTECTION FOR LANDFORM
AND GRADING FEATURE INCLUDES REGIONAL
STORM WATER SURFACE ELEVATION PLUS 0.5 m
FREEBOARD.
4. TRCA FLOOD PROTECTION LAND FORMING
TECHNICAL DESIGN CONSIDERATIONS SLOPE
REQUIREMENTS: WET SIDE MAXIMUM SLOPE OF
5-10% WITH 10-15% ALLOWABLE FOR LOCALIZED
AREAS AND DRY SIDE MAXIMUM SLOPE OF 1.5 -
3.5% (APPLICABLE TO LANDFORM ONLY).
5. CONTOUR AND SPOT ELEVATION LABELS "EX"
AND "PR" INDICATE EXISTING AND PROPOSED
CONDITIONS.
OPTION 3R P1-1AMID-BLOCK GRADING SOLUTION WITH
NORTH/SOUTH LANDFORM INTEGRATION
C005DEC. 14, 2020
PRELIMINARY DESIGN (30%)
BMW
DEALERSHIP
EX. FINISHED FLOORELEVATION = 78.90
EX. FINISHED FLOORELEVATION = 78.72
MINI
DEALERSHIP
METROLINX RAIL EMBANKMENT
CITY PROPERTYPARCEL
TO
E O
F F
PL
TOE
OF 3.
5% D
RY S
IDE
SLOP
E FP
L
5 m WIDTHOF CREST
2002 PROPERTYSURVEYPARCEL
TW: 78.30mBW: 78.07m
OPTION 3R P1-1AINTERIM GRADING PLAN
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON ESTABLISHMENT OF
EXISTING CONDITIONS SERVICING USING UNRECTIFIED
PHOTOS FROM THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING INFRASTRUCTURE
HAS NOT BEEN COMPLETED. EXISTING INFRASTRUCTURE
MAY NOT BE TO SCALE OR SITED CORRECTLY.
2. PORTION OF SUNLIGHT PARK ROAD REMOVED, EASTERN
RAMP TO BE RE-CONSTRUCTED IN PLACE.
3. LEVEL OF FLOOD PROTECTION FOR LANDFORM AND
GRADING FEATURE INCLUDES REGIONAL STORM WATER
SURFACE ELEVATION PLUS 0.5 m FREEBOARD.
4. TRCA FLOOD PROTECTION LAND FORMING TECHNICAL
DESIGN CONSIDERATIONS SLOPE REQUIREMENTS: WET SIDE
MAXIMUM SLOPE OF 5-10% WITH 10-15% ALLOWABLE FOR
LOCALIZED AREAS AND DRY SIDE MAXIMUM SLOPE OF 1.5 -
3.5% (APPLICABLE TO LANDFORM ONLY).
5. CONTOUR AND SPOT ELEVATION LABELS "EX" AND "PR"
INDICATE EXISTING AND PROPOSED CONDITIONS.
6. DURING THE REGIONAL STORM EVENT, THE FLOOD
PROTECTION LANDFORM IS ANTICIPATED TO BE SUBJECT TO
VELOCITIES BETWEEN 1 AND 4 m FOR THE NORTH LANDFORM
AND < 0.5 m FOR THE SOUTH LANDFORM.
7. FLOOD PROTECTION LANDFORM DESIGN INCLUDES A CLAY
CORE WITH 66.7% SIDE SLOPES EXTENDING FROM THE
CREST OF THE LANDFORM TO THE EXISTING GROUND AND
HAS BEEN ASSUMED TO BE KEYED INTO A DEPTH OF 5 m FOR
COSTING PURPOSES. FURTHER REFINEMENT TO THE KEY IN
DEPTH SHOULD BE UNDERTAKEN AT DETAILED DESIGN.
DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
NO. DATE REVISIONS
1:500
C006
SCALE:
DATE:
FIGURE:
PRELIMINARY DESIGN (30%)
1
2
3
4
OCT. 16, 20205
REMOVE 18 POLES, WITH 27 FIXTURES INTRIANGULAR AREA TO MAKE WAY FORBROADVIEW EXTENSION. REMOVE ORABANDON ELECTRICAL DUCTS.
TO XFMR BUILDING
RELOCATE EXISTING TRANSFORMER /ELECTRICAL BUILDING
AWAY FROM PROPOSED GRADING FEATURE
LIFT GATE ANDCORRESPONDING DUCTSTO BE REMOVED
SIGNAGE TO BEPOWERED VIA NEWAERIAL LIGHTING CCTS
MAIN BUILDING DUCT BANK TO BE REMOVED ANDREPLACED WITH DUCT BANK FROM NEW
TRANSFORMER BUILDING
PROPOSED LOCATION OFRELOCATED TRANSFORMER /
ELECTRICAL BUILDING
REMOVE ELECTRICAL EQUIPMENT ASSOCIATEDWITH DEMOLISHED CAR WASH BUILDING
RELOCATE POLE
REMOVE ALL ELECTRICAL DUCTSIN PROPOSED GRADING FEATURE
AREA INCLUDING SECURITY,LIGHTING, POWER, HYDRO AND
ABANDONED DUCTS ETC.REPLACMENT CABLES SHALL BE
AERIAL TO MAINTAIN INTEGRITY OFFLOOD PROTECTION. (TYP.)
INCOMING HYDRO DUCT BANKTO BE REMOVED. NEW AERIAL
HYDRO SERVICE DESIGNREQUIRED TO RELOCATED
TRANSFORMER BUILDING
REVISE LIGHTING TOACCOMMODATEREMOVED ENTRANCE
GROUND SPOTLIGHTS LOCATED INGRADING FEATURETO BE REMOVED(TYP.)
POLES IN GRADING FEATURE AREA TO BEREMOVED AND REINSTALLED TO SUIT NEWGRADE ELEVATION. NEW FOOTINGS REQUIRED.POLES SHALL BE REPLACED OR MODIFIED TOALLOW FOR AERIAL CABLING TO ELIMINATEDUCTS IN GRADING FEATURE AREA. (TYP.)
GROUND SPOT LIGHTSLOCATED IN GRADINGFEATURE AREA TO BEREMOVED (TYP.)
POLES, DUCTS AND LIGHTS ONWET SIDE OF FLOOD PROTECTIONLANDFORM TO BE REMOVED (TYP.)
INSTALL NEW ORRELOCATED POLEAFTER REMOVALOF CAR WASH
METROLINX RAIL EMBANKMENT
DISCLAIMER AND NOTES
1. SITE SERVICING DESIGN BASED ON ESTABLISHMENT OF
EXISTING CONDITIONS SERVICING USING UNRECTIFIED
PHOTOS FROM THE OCT. 2, 2002 SITE PLAN APPLICATION.
INVESTIGATION TO FIELD TRUTH EXISTING INFRASTRUCTURE
HAS NOT BEEN COMPLETED. EXISTING INFRASTRUCTURE
MAY NOT BE TO SCALE OR SITED CORRECTLY.
2. LIGHTING, SECURITY AND POWER CABLES CROSSING
PROPOSED GRADING FEATURE SHOULD BE SPANNED
AERIALLY TO MAINTAIN FLOOD PROTECTION AND GRADING
FEATURE INTEGRITY.
3. DUCTS AND ELECTRICAL EQUIPMENT SHOWN ON THIS
DRAWING ARE BASED ON EXISTING DRAWINGS AND
SATELLITE IMAGES ONLY. EXACT CONDITIONS AND
LOCATIONS OF ELECTRICAL PLANT MUST BE CONFIRMED.
4. FOR THE PURPOSES OF THIS ELECTRICAL DESIGN, IT IS
ASSUMED THAT THE SITE DESIGN AND THE LOCATIONS OF
LIGHT STANDARDS WILL REMAIN THE SAME. IT IS ALSO
ASSUMED THAT THE REMOVED BUILDINGS WILL BE
REPLACED WITH PARKING TO MATCH THE EXISTING SITE
DESIGN.
FIGURE
DATE:
NO. DATE REVISIONS
OCT. 16, 2020E001
SCALE:
HORIZONTAL: 1:500DESIGN FOR A FIRST PHASE OF THE
BROADVIEW AND EASTERN FLOOD
PROTECTION PREFERRED ALTERNATIVE
PRELIMINARY DESIGN (30%) 1
2
3
4
OPTION 3R P1-1AMID-BLOCK GRADING SOLUTION -
ELECTRICAL IMPACTS