THE LANDMARK ABU DHABI ALHABTOOR CCC JVSHORTENING PREDICTION

PREDICTION OF AXIAL SHORTENING

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 2

Introduction

� This presentation is intended toshed the light on the nature of the Shortening criterion in concrete, the method of predictionand application of information.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 3

TYPES OF SHORTENING

� Elastic shortening (instant)

� Shrinkage- Drying shrinkage (instant)- Autogenous shrinkage (time dependant).

� Creep (time dependant)

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 4

FACTORS AFFECTING SHORTENING

1 – ELASTIC SHORTENING

� Strength of concrete.

� Age of loading.

� Magnitude of loading

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 5

FACTORS AFFECTING SHORTENING

2 – SHRINKAGE

� Ambient humidity.

� Dimensions of element.

� Composition of concrete.

SHRINKAGE DOES NOT DEPEND ON LOADING

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 6

FACTORS AFFECTING SHORTENING

3 – CREEP

� Ambient humidity.� Dimensions of element.� Composition of concrete.� Strength of concrete.� Magnitude of sustained load.� Age of loading.

CREEP IS DEPENDANT ON SUSTAINED LOADING

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 7

MONITORED OBJECTS

Shortening is being predicted and monitored for all “Vertical

Structural Elements”,That is:

COLUMNS and

COREWALL ELEMENTS

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 8

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 9

LET’S LOOK AGAIN AT THAT LAST IMAGE….

Long term Shortening yet to take place AFTER PLACEMENT is the key figure to assess impact.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 10

LONG TERM SHORTENING YET TO TAKE PLACE AFTER PLACEMENT

� Long term Cumulative shortening for a column at level 30, starts well before placement date.

� Long term cumulative shortening yet to take place at that point equals:

Long term cumulative shortening at that point LESS Interim Cumulative Shortening that has already taken place at time of pouring the slab.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 11

WE NEED TO AGREE ON THE DEFINITION OF THE TERMS

JUST MENTIONED:

� Final floor Shortening: “FFS”Is the final (30+ years) shortening for a “VSE” at a given level.

� Final Cumulative Shortening “FCS”: Is the final (30 + years) and cumulative shortening for all the VSEsunderneath a point at a given level.

� Interim Cumulative Shortening “ICS”: Is the cumulative shortening for all the VSEs underneath a Target Point at a given time.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 12

MORE DEFINITIONS

� LEVEL ADJUSTMENT:

Floor slab should be constructed to a higher level than that designed such that design level would be reached to upon completion of final shortening.

Adjustment at a given level should be equal to the “Cumulative Shortening” yet to take place for all columns underneath that level from the date of slab placement and for 30 years to come after loading completion.

Level Adjustment = Final (30 Y) Cumulative Shortening at the point less the “Interim Cumulative Shortening at time of placement = FCS – ICS.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 13

WHY DO WE NEED TO PREDICT SHORTENING ?.

� To determine the level adjustment amount.

� To assess the impact on interfacing structures.

� To establish construction tolerance in interfacing installations (cladding, pipe risers, vertical railing ..etc) .

� To assess the impact of column / core wall differential shortening on the structure.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 14

CALCULATION METHODOLOGY

The magnitude of long term elastic, shrinkage and creep strains has been calculated as per the provisions of BS EN 1992-1-1:2004.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 15

PREDICTION METHODOLOGY 1 - ANALYSIS PARAMETERS

SHORTENING CALCULATIONS TO THE REQUIREMENTS OF "EUROCODE 2, BS EN 1992-1-1:2004

RH Relative Humidity % age

����H

A coefficient depending on the relative 1.5[1+(.012 RH)18] ho + 250 ����3 , <= 1500 ����3

humidity & member size - for fcm => 35

t0 Age of concrete at loading

����c Compressive stress applied at age to

ho Section notional size = 2 Area / Perimeter

t Age of concrete at the moment)

t-t0 Non-adjusted duration of loading

����cc(t)Cefficient for the calculation of

exp{s[1-(28/t)1/2]} = e{s[1-����(28/t)]}

compressive strength fcm(t) at age t

fcm(t) Compressive strength at age t ����cc(t). fcm

Ecm Concrete secant modulus of elasticity 22 (fcm/10)0.3

Ecm(t) Tangent Modulus of Elasticity at age "t" [fcm(t) / fcm]0.3 .Ecm

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 16

PREDICTION METHODOLOGY 2 - ELASTIC SHORTENING

����e����t���� Elastic strain at time "t" ����c / Ecm(t)

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 17

PREDICTION METHODOLOGY 3 - DRYING SHRINKAGE

����RHCoefficient related to relative humidity 1.55 [1 - (RH/RHO)3]

����ds1 Coefficient depends on cement type

����ds2 Coefficient depends on cement type

����cd.0 Basic drying shrinkage strain

0.85[(220+110.����ds1).

exp(-����ds2.fcm/fcmo)].����RH/106

����ds(t,ts)(t-ts)

(t-ts)+0.04����ho3

kh Coefficient depending on "ho" Equals 0.7 for ho =>500

����cd (t) Long term drying shrinkage ����ds(t,ts).kh.����cd.0����ca (����) 2.5(fck-10)106

����as(t) 1 - exp(-2t0.5)����ca (t) The autogenous shrinkage ����as(t) . ����ca (����)

����cs Total shrinkage strain ����cd + ����ca

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 18

PREDICTION METHODOLOGY 4 - CREEP

Ec Tangent Modulus of Elasticity. 1.05 Ecm

����1 ����1��������2,����3 are coefficients to (35/fcm)0.7

����2 consider the influence of the (35/fcm)0.2

����3 concrete strength on the creep strain. (35/fcm)0.5

����(to) A factor allowing for age of loading effect. 1 / (0.1 + to0.2)

����(fcm)A factor to allow for the effect of concrete 16.8

strength on the notional creep coefficient ����fcm

����(t,to) A coefficient to count time effect [(t-t0) / (����H + t - t0)]0.3

����RH A factor to allow for the effect of humidity. [1+(1-RH/100).����1/(0.1 ho^0.333)].����2

����0 Notional creep coefficient ����RH . ����(fcm). (����(t0)

��������t,to���� The creep coefficient. ���� . ����c(t,to)

����cc����t,to���� Creep deformation (strain) at time "t" ��������t,to������������c����Ec����

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 19

THE MASTER SPREADSHEET

Data base for geometric, material and loading information for each column / corewall element, including the construction schedule, has been entered into a Master Spreadsheet.

Cells of the Master Spreadsheet encapsulate the formulae needed to calculate the strain in the column corresponding to following loadings imposed by floor slabs supported by the column:

� SWL : Self Weight Load.� SDL : Super-imposed Dead Load.� SLL : Super-imposed Live Load.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 20

MASTER SPREAD SHEET - INSERTING CONSTRUCTION SCHEDULE

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 21

MASTER SPREAD SHEET - INSERTING COLUMN PROPERTIES

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 22

MASTER SPREAD SHEET – PART 1

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 23

MASTER SPREAD SHEET – PART 2DETAIL “A”

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 24

MASTER SPREAD SHEET – DETAIL “A”

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 25

MASTER SPREAD SHEET – GETTING A SHORTENING VALUE ON A GIVEN DATE

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 26

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 27

LEVEL ADJUSTMENT ACHIEVED

� To determine the level adjustment amount.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 28

MASTER SPREAD SHEET – GETTING A COLUMN PROFILE AT A GIVEN LEVEL

PREDICTED PROFILE FOR C1- L 30 TOP

-60.00

-50.00

-40.00

-30.00

-20.00

-10.00

0.00

28-J

an-0

8

28-F

eb-0

8

28-M

ar-0

8

28-A

pr-

08

28-M

ay-0

8

28-J

un

-08

28-J

ul-

08

28-A

ug

-08

28-S

ep-0

8

28-O

ct-0

8

28-N

ov-

08

28-D

ec-0

8

28-J

an-0

9

28-F

eb-0

9

28-M

ar-0

9

28-A

pr-

09

28-M

ay-0

9

28-J

un

-09

28-J

ul-

09

28-A

ug

-09

28-S

ep-0

9

28-O

ct-0

9

28-N

ov-

09

28-D

ec-0

9

28-J

an-1

0

28-F

eb-1

0

28-M

ar-1

0

28-A

pr-

10

28-M

ay-1

0

PREDICTED

FINAL

MEASURED

CHART NO. C3-L30-04009-01 COLUMN C3 POINT AT L 30 DATE 3-Jun-08

April 09

THE

LAN

DM

AR

K A

BU

DH

AB

I –A

LHA

BTO

OR

CC

C JV

SH

OR

TEN

ING

PR

ED

ICTIO

N29

MASTER SPREAD SHEET –

IMPACT OF SHORTENING

ON INTERFACING STRUCTURES (THE CANOPY)

-70.0

0

-60.0

0

-50.0

0

-40.0

0

-30.0

0

-20.0

0

-10.0

0

0.0

0

9-Feb-08

9-Mar-08

9-Apr-08

9-May-08

9-Jun-08

9-Jul-08

9-Aug-08

9-Sep-08

9-Oct-08

9-Nov-08

9-Dec-08

9-Jan-09

9-Feb-09

9-Mar-09

9-Apr-09

9-May-09

9-Jun-09

9-Jul-09

9-Aug-09

9-Sep-09

9-Oct-09

9-Nov-09

9-Dec-09

9-Jan-10

9-Feb-10

9-Mar-10

9-Apr-10

9-May-10

9-Jun-10

-140.0

0

-120.0

0

-100.0

0

-80.0

0

-60.0

0

-40.0

0

-20.0

0

0.0

0

26-Apr-08

26-May-08

26-Jun-08

26-Jul-08

26-Aug-08

26-Sep-08

26-Oct-08

26-Nov-08

26-Dec-08

26-Jan-09

26-Feb-09

26-Mar-09

26-Apr-09

26-May-09

26-Jun-09

26-Jul-09

26-Aug-09

26-Sep-09

26-Oct-09

26-Nov-09

26-Dec-09

26-Jan-10

26-Feb-10

26-Mar-10

26-Apr-10

26-May-10

26-Jun-10

26-Jul-10

26-Aug-10

A B

PROFILE AT L-7

PROFILE AT L-1

INT

ER

FAC

ING

STR

UC

TU

RE

LO

NG

TE

RM

DIM

EN

SION

AL

CH

AN

GE

��� �H

= A –

B = 4.9 m

m

INT

ER

FAC

ING

STR

UC

TU

RE

INST

AL

LA

TIO

N C

OM

PLE

TIO

N

14 APR

IL 2010

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 30

IMPACT ON INTERFACING STRUCTURES ASSESSED.

� To determine the level adjustment amount.

� To assess the impact on interfacing structures.

April 09

THE

LAN

DM

AR

K A

BU

DH

AB

I –A

LHA

BTO

OR

CC

C JV

SH

OR

TEN

ING

PR

ED

ICTIO

N31

MASTER SPREAD SHEET –

IMPACT OF SHORTENING

ON INTERFACING INSTALLATIONS (CURTAIN WALL)

-350.0

0

-300.0

0

-250.0

0

-200.0

0

-150.0

0

-100.0

0

-50.0

0

0.0

04-Dec-08

4-Jan-09

4-Feb-09

4-Mar-09

4-Apr-09

4-May-09

4-Jun-09

4-Jul-09

4-Aug-09

4-Sep-09

4-Oct-09

4-Nov-09

4-Dec-09

4-Jan-10

4-Feb-10

4-Mar-10

4-Apr-10

4-May-10

4-Jun-10

4-Jul-10

4-Aug-10

4-Sep-10

4-Oct-10

4-Nov-10

4-Dec-10

4-Jan-11

4-Feb-11

4-Mar-11

4-Apr-11

A

B

PROFILE AT L-36 PROFILE AT L-35

INT

ER

FAC

ING

STR

UC

TU

RE

LO

NG

TE

RM

DIM

EN

SION

AL

CH

AN

GE

��� �H

= A –

B = 2.1 m

m

INT

ER

FAC

ING

INST

AL

LA

TIO

N C

OM

PLE

TIO

N

20 APR

IL 2010

-350.0

0

-300.0

0

-250.0

0

-200.0

0

-150.0

0

-100.0

0

-50

.00

0.0

0

24-Dec-08

24-Jan-09

24-Feb-09

24-Mar-09

24-Apr-09

24-May-09

24-Jun-09

24-Jul-09

24-Aug-09

24-Sep-09

24-Oct-09

24-Nov-09

24-Dec-09

24-Jan-10

24-Feb-10

24-Mar-10

24-Apr-10

24-May-10

24-Jun-10

24-Jul-10

24-Aug-10

24-Sep-10

24-Oct-10

24-Nov-10

24-Dec-10

24-Jan-11

24-Feb-11

24-Mar-11

24-Apr-11

A

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 32

CONSTRUCTION TOLERANCE IN INTERFACING INSTALLATION VERIFIED

� To determine the level adjustment amount.

� To assess the impact on interfacing structures.

� To establish construction tolerance in interfacing installations (cladding, pipe risers, vertical railing ..etc) .

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 33

THE EXECUTIVE SUMMARY

Information extracted from various Master Spreadsheets has

been classified sorted in 5 schedules A through E.

These schedules were listed in an “Implementation Duty

Matrix” along with a listing for their

functions and concerned parties.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 34

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 35

SCHEDULE A

A summary for 30 years final

cumulative shortening

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 36

SCHEDULE B

Balance Final Cumulative

Shortening yet to take place

after placement of VSEs

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 37

SCHEDULE C

Change in inter-floor

height

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 38

SCHEDULE D

Floor level adjustment

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 39

SCHEDULE E

Differential shortening

between corewall & columns at

pivots.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 40

COLUMN / COREWALL DIFFERENTIAL SHORTENING COMPUTED.

� To determine the level adjustment amount.

� To assess the impact on interfacing structures.

� To establish construction tolerance in interfacing installations (cladding, pipe risers, vertical railing ..etc) .

� To assess the impact of column / core wall differential shortening on the structure.

April 09THE LANDMARK ABU DHABI – ALHABTOOR CCC JV

SHORTENING PREDICTION 41

THIS IS THE END OF THE PRESENTATION

Thank you very much for listening..

I shall be ready for your question after viewing a Master Spreadsheet.

M.H.