precise energy managementenergenz.com/wp-content/uploads/2015/12/energenzbrochure_2015… ·...
TRANSCRIPT
GENERATING GREAT RETURNS.
energenz.com IMPROVING THE ENVIRONMENT.
PRECISE ENERGY MANAGEMENT
ABOUT
Why We’re Different
Energenz partners with clients over the life of a building to deliver great financial returns that
improve the efficiency and use of natural resources. Our team is made up of leading
resource efficiency experts. Our operations driven design, assessment services and energy
intelligence dashboards deliver significant values to our clients at all stages of the building
lifecycle.
Fresh Perspectives
Effective resource management combines technical understanding with operational and
financial considerations. We seek to bridge the gap between engineering and business
operations, using our experience to make effective resource management a reality for you.
Energenz is primarily an engineering
consultancy with a data driven,
evidence based methodology, used
to improve performance on
buildings.
Independent View
Energenz does not have commercial
relationships with any equipment
vendors. Our
independence ensures that you will receive advice that you can trust and we puts your needs
first.
ENERGENZ
energenz.com
ENERGENZ Strategic
Enhancement of
design brief
Energy and
operational focused
review of design and
control methodology
Right sizing of
equipment
Resource Modelling
Life Cycle Costing
Metering and
monitoring strategy
Commissioning
authority
LEED Support
Strategic planning and
management
Energy and operational
assessment
Supervise improvement
works
Measurement,
verification and
benchmarking
Retro-commissioning/
commissioning authority
Continuous
commissioning
Assessment
Information
Management
System (AIMS)
Real-time
monitoring and
reporting
Building Energy
Portfolio
management
Deployment of
energy
management
Se
rvic
es
Pro
vid
ed
Life Cycle Building Improvements Operations
Driven Design
Efficiency in
Operation
Energy
Intelligence
energenz.com
OPERATIONS DRIVEN DESIGN
Operations Driven Design - ODD
Our operations driven design service brings our lessons learnt from how efficient buildings are
operated and applies them to the design phase. Energenz act as the commissioning authority
and sit on the clients side of the table in order to ensure that efficiency is
integrated into the design and build process until the design is completed and
commissioned.
This service enables our client to make informed
decisions during the development phase. Our
operations focused engineers will act as an
independent advisor to the client exploring
functional and operational requirements, injecting
the building design with an operational focus that
enhances functionality, flexibility, commissionability
and efficiency. This links up operational interest with
design intent.
An energy efficiency-driven designed system does not necessarily
directly translate to a system working efficiently. Our engineers, acting as an
independent commissioning authority, will add value to the procurement and construction pro-
cess by injecting performance based specification and procure energy consuming systems that
are not only built and constructed as specified, but also commissioned, configured,
sequenced and fine-tuned for operational efficiency.
OPERATIONAL ENERGY CONSUMPTION MAKES UP TO 90% OF THE
ENERGY CONSUMED DURING THE LIFE OF A BUILDING
EFFICIENCY
Efficiency in Operation
Our energy assessments service takes our teams experience and applies it directly to your
site. From large scale commercial buildings to industrial plants, our team has the breadth
and depth of experience to ensure your assets become leaders in energy efficiency.
Energy Baseline—The first step in any energy management programme is to establish an
energy baseline. This is an annual consumption profile of your site over preceding years.
This gives you an understand-
ing of when and how much
you are using energy during
the year.
Energy Breakup—The second
step is to establish where your
energy is being used on the
site—is it the chiller plant, light-
ing, heating or compressed air
systems that are using the most
and how much is that? This al-
lows you to prioritize your
improvement efforts.
Energy Management Opportunities (EMOs)—The third and most important step is to under-
stand the opportunities available for reducing consumption at the sites. What this gives
you is a clear view on all of the financial investment cases for becoming a more efficient
enterprise. If the projects cannot be financed internally, we can source funds externally.
energenz.com
IN OPERATION
energenz.com
ENERGY
Software Assisted Monitoring and Commissioning
We now have access to lots of data about building performance. Hidden in this data are the
keys to cost reduction. Energy Intelligence is our real-time monitoring and continuous
commissioning service, using the latest technology for better management of energy,
water, and waste. Energenz use this software to keep virtual eyes trained on your site and
ensure it is delivering maximum efficiency all of the time.
This software automatically looks for issues and quantifies the cost of those issues over time,
allowing your site to gain the benefits of having an experienced engineer constantly monitoring
on your equipment, 24 hours a day, 7 days a week. A typical Energenz client finds energy cost
savings of 15% and payback times well under one year from this monitoring based commission-
ing approach.
Achieve energy savings at low cost
Maintain those savings over time
Run a more effective maintenance
program.
INTELLIGENCE
Benefits of Commissioning
“Dashboards are great but – I need someone
to tell me when I should look at a dashboard
– tell me when there is something important
that deserves my attention”
“I have been very satisfied with their work and recommend them as
highly competent energy auditors.”
- Mel Hansen, Director of Facilities Management | MGM China
“As part of our contractor
performance monitoring
programme, we have conducted an
evaluation of their performance on
this project. We consider their
performance to be good.”
- Stephen Hilton, Regional Head of
Engineering | Arcadis Group
MGM Macau
HSBC
“Energenz delivered on their side
of the project, on time and on
budget, and we will seek to use
their services again.”
- Julian Bott, Principal | Cundall Ltd
One Central Macau
Electronics Factory
“Energenz has a great offer which they combine with a great service.
They quickly identified significant energy cost saving opportunities of
over $1M USD/year, with a simple payback of less than 2 years.
Throughout their commission we were constantly impressed by their
enthusiasm and professionalism when presented with the challenges
such as resistance to change and local cultural differences. “
- Stephen Coulthard, Director | Turner & Townsend Shanghai
energenz.com
EXPERTISE
PROVIDING SOLUTIONS FOR
Affiliations
“The report was brilliant. I was very impressed with their
detailed approach to identifying energy efficiency
opportunities at our site.”
Waste Transfer Station
“Energenz helped us to identify and implement various cost
saving opportunities which is equivalent to HK $1.1M savings
in electricity a year .”
- Harvey Wong, Director of Engineering| Intercontinental Hong Kong
Intercontinental Hong Kong
Hospitality
High Tech Electronics
Apparel
Distribution Centers
Footwear
FMCG
Banking
Textiles
Automotive
MARKET SECTORS
DIFFERENT
energenz.com
PORTFOLIO CASE STUDIES
Site
HSBC Hong Kong possesses 8 buildings
including offices and data centres. Total
size area of 216,134.8 m2.
Role
Energy Auditor
Outcome
Resolved long standing issues on energy
inefficiencies at HMB
Energy saving initiatives identified at USD
$1.88M pa (28% of total site energy cost)
Project moving into EMO implementation
stage with all Energenz proposed EMO
(USD $5.16M) approved by HSBC
To be engaged as HSBC’s advisor on EMO
projects implementation
HSBC Asia
Site
A 500-room hotel with 8 restaurants.
Chiller plant consumption 7,500,000 kWh
Role
Energy Auditor
Chiller Optimization
Airside Optimization
Outcome
Actual energy reduction to date of 35% on
mechanical systems
Over USD $360,000 pa energy savings
implemented
Intercontinental
energenz.com
PORTFOLIO CASE STUDIES
Site
Site of 50,000 m2 mixed-used casino and
luxurious hotel
Role
Energy Auditor, advisor and manager for 4
years
Services and project includes:
Energy Audit
Energy Management Programme
Energy Information System
Boiler Replacement with Heat Pumps
Chiller Optimisation
Water and Waste Assessment
Education & Training
Design Optimization of new casinos Outcome
Multiple awards won (Macau Green Hotel,
CEM award 2 years running)
Verified energy reductions to date of 2011-
12%, 2012-8%, 2013-25%
MGM Macau
Site
Full coverage of the 550,000 m2 luxurious
resort
Role
ASHRAE Level 2 Energy Audit the whole site
Project delivered in 2 months
Outcome
Project delivered in 2 months
Identified quick win and low cost
opportunities for immediate
implementation
Electricity saving initiates identified at USD
$6.54M pa (21.5% of total site energy cost)
Diesel saving initiates identified at USD
$540,000 pa (1.8% of total site energy cost)
Galaxy Macau
energenz.com
PORTFOLIO CASE STUDIES
Site
20 sites including apparel, food/beverages,
cosmetic factories and distribution centres
Role
Energy Auditor
Energy Education Programme
Outcome
Multiple energy saving opportunities across
all factories
Energy reduction opportunities of greater
than 30%
Simple payback of 1-2 years
Common projects:
Steam system replacement
Compressed air enhancements
Lighting enhancements
Li & Fung
Site
6 sites electronic factories doing moulding
and performing assembly
Role
Energy Auditor
Smart metering installation
Energy Consultant for 2 years
Deployment of energy assessment
programmes (electronics factories, plastic
mould injection, packaging)
Outcome
Many common opportunities across all
factories
Energy reduction opportunities of 20-30%
Simple payback of 1-2 Years
Smart Metering Installations
Electronics Factories
energenz.com
PORTFOLIO CASE STUDIES
Site
Car factory producing over 2,000 cars/year
Role
Energy Auditor
Design Optimization for new assembly line,
weld shop and paint shop
Outcome
Many common opportunities across all
factories
Energy reduction opportunities of
USD$51,312 savings (25% of total site
energy cost)
Simple payback of 1-2 years
Opportunities include:
Ineffective process cooling
Stream routing inefficiencies
Compressed air opportunities
Nissan Car Factory
Site
22 sites, a total size area of 330,000 m2
Role
Energy Auditor
Full Energy Assessment of buildings on
campus
Outcome
Identified significant energy savings
opportunities of over 20%
Ongoing energy management to assist
client with delivery of energy savings over
time USD $1.5M
Science Park
GLOBAL EXCELLENCE
GENERATING GREAT RETURNS.
energenz.com IMPROVING THE ENVIRONMENT.
LOCATIONS
Singapore
8 Eu Tong Sen Street
#14-94 The Central
Singapore 059818
P: +65. 62.277.269
F: +65).62.277.267
Hong Kong
Unit 2905-08 Pacific Plaza
410 Des Voeux Road West
Hong Kong, CN
P+ 852.2161.1328
F+ 852.2161.1308
Las Vegas
5155 W. Patrick Lane
Las Vegas, NV 89118
P+ 1.702.362.9200
F+ 1.702.362.9862
Macau
Alm. Dr. Carlos D’ Assumpcao
No. 180
Tong Nam Ah Central Comercio,
14 Andar A.
Macau, CN
P+ 853.2875.7330
F+ 853.2875.7336
New Orleans
3525 N. Causeway Blvd., Suite 500
Metairie, LA 70002
P+ 1.504.830.0139
F+ 1.504.830.0197
Orange County
36 Technology Drive, Suite 200
Irvine, CA 92618
P+ 1.949.419.3030
F+ 1.949.419.3040
Phoenix
16425 N. Pima Rd
Bldg. A Suite 160
Scottsdale, AZ 85260
P+1.480.214.5823
F +1.480.219.0184
Shanghai Unit 2602D, 26/F,
Ascendas Plaza
333 Tianyaoqiao Road,
Xuhui District
Shanghai, CN 200030
P+ 86.21.2215.7793
F+ 86.21.2215.7887