G T ROAD
ISLAMABAD RAWALPINDI CITY
PRESENTATION ON PRESENTATION ON
DEVELOPMENT OF ACCESS CONTROLLED DEVELOPMENT OF ACCESS CONTROLLED
RAWALPINDI RING ROADRAWALPINDI RING ROAD
Zero Point
Rawat
MOTO
RW
AY
GOVERNMENT OF THE PUNJABGOVERNMENT OF THE PUNJAB
RAWALPINDI DEVELOPMENT AUTHORITYRAWALPINDI DEVELOPMENT AUTHORITY
3
ORIGINAL MASTER PLAN OF ISLAMABAD/RAWALPINDIORIGINAL MASTER PLAN OF ISLAMABAD/RAWALPINDI
PLANNED BY C.A. DOXIADIS IN YEAR 1960 PLANNED BY C.A. DOXIADIS IN YEAR 1960
Rawat
Islamabad
Hig
hw
ayI.J
Prin
cipal R
oadKashm
ir Hig
hway
La
ho
re
Pesh
awar Blu
e Are
a
Islamabad
Capital
Parliament
Zero Point
Faizabad
Rawal Lake
Rawalpindi
Blue A
rea
PROPOSED
AIRPORT
MO
TORW
AY
BUILT UP AREA 1969
BUILT UP AREA 1969-1996
BUILT UP AREA 2010
PREVIOUSLY
PROPOSED RING
ROAD 1998
Industri
al Zone
DIRECTIONAL GROWTH OF RAWALPINDI
POST 1969-96
Lahor
e
G T Road
G T Road
I CT Boundary
Dham
ialR
oad
AdyalaRoad
Chak
riR
oad
GirjaRoadMisria
l Road
BG
RV
Khanpur Dam
RDA GUIDED DEVELOPMENT PLAN
1996-2020
Simli
Dam
ORIGINAL MASTER PLAN OF ISLAMABAD/RAWALPINDIORIGINAL MASTER PLAN OF ISLAMABAD/RAWALPINDI
PLANNED BY C.A. DOXIADIS IN YEAR 1960 PLANNED BY C.A. DOXIADIS IN YEAR 1960
Rawat
Islamabad
Hig
hw
ayI.J
Prin
cipal R
oadKashm
ir Hig
hway
La
ho
re
Pesh
awar Blu
e Are
a
Islamabad
Capital
Parliament
Zero Point
Faizabad
Rawal Lake
Rawalpindi
Blue A
rea
PROPOSED
AIRPORT
MO
TORW
AY
BUILT UP AREA 1969
BUILT UP AREA 1969-1996
BUILT UP AREA 2010
PREVIOUSLY
PROPOSED RING
ROAD 1998
Industri
al Zone
DIRECTIONAL GROWTH OF RAWALPINDI
POST 1969-96RDA GUIDED DEVELOPMENT PLAN
1996-2020La
hore
G T Road
G T Road
I CT Boundary
Dham
ialR
oad
AdyalaRoad
Chakri Road
GirjaRoadMisria
l Road
BG
RV
PROPOSED ALIGNMENT OF RAWALPINDI RING ROAD,
REVAMPING OF GUIDE DEVELOPMENT PLAN
I-16
Murr
ee R
oad
LIN
K R
OA
D
LAI
NULLAH
I-17
RAWAT
CHORR
CHOWK
CH
AK
BALI R
OA
D
H-17
H-16G-1
7
E-17
SHAHRAH-E-K
HASHMIR
CHANNI
BRIDGE
ISLA
MA
BA
D H
IGH
WA
Y
CH
AK
RI
RO
AD
AD
YA
LA R
OA
D
GIRJA R
OAD
TARNOL
R D A
VIS
TA
S-II
18.55 km
MISRIA
L ROAD
ChanniBridge to Faizabad
22 KmKACHARY
CHOWK
PC
HAJJ
COMPLEX
THALIAN
BRIDGE Bahria
Town
DHA II
RDA VIS
TA
Bahria
Town
S-I
35.85 km
ChanniBridge to
Tarnol
42 Km
RAKH
DHAMIAL
RAKH LOHI
BHER
New Islamabad
International Airport
DHA III
DHA I
Faizabad to Pir Wahdhi
Morr
14 Km
Adyala
Jail
ORIGINATES FROM GT ROAD NEAR CHANNI BRIDGE & TERMINATES AT “I-16”
SECTOR OF ISLAMABAD NEAR HAJJ COMPLEX
CONNECTS NEW AIRPORT AND FATEH JANG ROAD ACROSS MOTORWAY VIA THALIAN FROM PROPOSED DHAMIAL ROAD INTERCHANGE.
Link from ILink from I--16 to G.T Road near 16 to G.T Road near KohKoh--ee--NoorNoor MillMillLink Road from Link Road from RawatRawat Junction to Ring RoadJunction to Ring Road
Misriot
Seham
Girja
Dera
Gorakh Pur
Kharkan
Gali
Jawa
Losser
Kalyam
Mughal
IJ PRIN
CIPAL R
OAD
Medical
College
F. J Univ
I-15
G-16
G-13
G-8
H-13
H-8
I-8
F-17
F-16
D-16
D-15
D-14
D-17
B-17
L
LA
HO
RE
LA
HO
RE
S-III
6.92 km
Zero point to Motorway
22 km
RDA
Economic zone
ChanniChanni Bridge to Bridge to RawatRawat Link Road IntersectionLink Road Intersection
to to DhamialDhamial Road ( 26 Km)Road ( 26 Km)DhamialDhamial Road Intersection to IRoad Intersection to I--16 (9.5 Km)16 (9.5 Km)DhamialDhamial Road Intersection to New Airport (15.9 Km)Road Intersection to New Airport (15.9 Km)New Airport to Fateh Jang Road (2.7 Km)New Airport to Fateh Jang Road (2.7 Km)PROPOSED ALIGNMENT OF RAWALPINDI RING ROAD,
REVAMPING OF GUIDE DEVELOPMENT PLAN
DH
AM
IAL R
OA
D
RAKH TAKHT
PARI
S-IV
8.82 km
FUTURE LAND
COMITMENTS
ChannniChannni Bridge Bridge
to to ChakChak BailiBaili RdRd
2010 2010 1708617086
2020 603282020 60328
2030 2030 8107681076
2040 1089592040 108959
ChakChak BailiBaili Rd Rd
to to RawatRawat LinkLink
2010 2010 1798717987
2020 676782020 67678
2030 2030 9095490954
2040 1222342040 122234
RawatRawat Link to Link to
AdyalaAdyala RdRd
2010 2010 3100931009
2020 874782020 87478
2030 2030 117563117563
2040 1579952040 157995
AdyalaAdyala Rd to Rd to
DhamialDhamial RdRd
2010 2010 3229232292
2020 853952020 85395
2030 2030 114715114715
2040 1541682040 154168
DhamialDhamial Rd to Rd to
MM--22
2010 2010 1915519155
2020 319572020 31957
2030 429482030 42948
2040 577182040 57718
MM--2 to Fateh 2 to Fateh
Jang RdJang Rd
2010 2010 301230122020 78352020 7835
2030 105302030 10530
2040 141512040 14151
DhamailDhamail Rd to Rd to I I -- 1616
2010 2010 4374643746
2020 1294102020 129410
2030 1739172030 1739172040 2337292040 233729
Existing & Projected Average Daily TrafficTotal Average Daily Total Average Daily
TrafficTraffic
2010 2010 165187165187
2020 4700452020 470045
2030 2030 631703631703
2040 8489542040 848954
Project ObjectivesProject Objectives
ImprovedConnectivity
Environmental Impact
Economic Growth
Planned City Growth
X – SECTION OF RING ROAD
SERVICE ROAD SHOULDER
BA
RR
IER
FUTURE
LANES
SH
OU
LD
ER
MEDIAN/FUTURE RAIL
SERVICE ROADSHOULDER
BA
RR
IER
FUTURE
LANES
SH
OU
LD
ER
3LANE CARRIAGE
TRANSPORT WAY
TRANSIT
3LANE CARRIAGE
WAY TRANSPORT
Economic Zone
Economic Zone
Ring Road
RAWALPINDI RING ROAD & ITS ECONOMIC ZONEX-SECTION, 3D VEIW
2 LANES FOR
FUTURE TRANSPORTATION
02 LANE FOR
FUTURE TRANSPORTATION
RAWALPINDI
RING ROAD
SERVICE LANE & PARKING 3 LANE CARRIAGE WAY3 LANE CARRIAGE WAY SERVICE LANE &
PARKING
� Total Length = 70 km
� Main Ring Road = 54.41 km
� Link Roads = 15.59 km
� Bridges = 06
� Culverts = 22
� Overhead Bridges = 10
� Interchanges = 03
� X-Section 800 feet wide comprises of:
� Road Section = 300 feet (91.43 meter)
� Economic Zone = 500 feet (152.39 meter)
(250 ft on either side)
Salient Features
� Breakup of Project Cost:
� Land Acquisition Cost (800’ Width) Rs. 18.688 bn .
� Compensation for Structures Rs. 3.700 bn
� Road Construction Cost for 70.K.M Rs. 28.79 bn -
� Economic Zone Development Cost Rs. 13.348 bn
� Contingencies, PMU Cost etc, Rs. 4.75 bn
� Total Cost of Project: Rs. 69.579 bn
Project Cost
(Cost is based upon the feasibility and premilnary Engineering Plans)
Land Acquisition CostRs. 22.388 bn
Road Construction CostRs. 33.54 bn
Economic Zone CostRs. 13.348 bn
Ring Road Project
Disposal of Saleable AreaRs. 75.909 bn
Toll Tax
In
Put69.579
bn
Out
put
Net Benefit for Roll over
Infrastructure investment Rs. 6.33 bn
500 Kanal to be retained By RDA
Rs. 5.50 bn
Plus
50% Toll collectedto RDA for 15 years
Plus
Project Funding MechanismProject Funding Mechanism
(Cost is adjustable as per detail design)
Land uses %ages in Economic ZonesUse of Land Total Area
(Kanals)Area
PercentagesSaleable Area
(Kanals)
Cottage Economic Based
Plots
658 5 658
Business, Trade Centers
& Service Areas
6,350 46 6,350
Roads 4,051 30 0
Worker’s Apartments &
Flats
1,106 8 1,106
Institutional Sites:
Offices, Schools,
Universities Colleges etc
in Govt & Pvt Sectors
704 5 704
Recreation 570 4 0
Farmland / Urban
Agricultural Land
218 2 218
Total 13,657 100 9036
Proposed OptionsProposed OptionsDescription
Option-I Option-II
300 Feet Road 800 Feet Road & Economic Zone
Project CostRs 41.543 Bn
i/c land cost of Rs 8.0 Bn
Total Project cost = 69.579
i) Land Acquisition = 22.688
ii) Dev. Economic Zones = 13.348
iii) Road Construction = 33.543
Rs. In Billion
Financing
Arrangement
100% Interest free loan
from GoPb to RDA
GoPb through RDA =22.68
(for Land Acquisition)
Financing By Investors :
i) Economic Zone = 13.348
ii) Road Const. = 33.543
Construction
Period 4-Years
4-Years for Road Construction
2-Years for development of Eco. Zone
Parameter of
Investment
�Payable from revenue of
toll tax.�Payback total loan in
project year 29.
�Funding from Investors = 50.891 �Payable from sale of plots within 5
years starting from Project year 5 - 9�Expected Revenue =75.909 bn
Project IRR (%)
5.5% at Toll of Rs 15/- PCU
10.5% at Toll of Rs 25/- PCU
18.1% at Toll of Rs 15/- PCU
23.2% at Toll of Rs 25/- PCU
� Feasibility Study of Route Alignment
� Traffic Study Report
� Topographic Survey & Utility Relocation Survey / Plans
� Land Acquisition Plan
� Geo Technical Investigation Reports
� Hydrology Report
� Environmental Impact Assessment Report
� Pavement Design Report
� Land uses of Economic Zones Report/Plan
� Future Land Use Pattern & Economic Growth for Rawalpindi
� Economic Evaluation Report.
� Draft Concession Agreement
� Engineer's Cost Estimate for the purpose of preparation of PC-I / Investment Bidding .
� Tender Documents
STUDIES CONDUCTED FOR FEASIBILTY & STUDIES CONDUCTED FOR FEASIBILTY &
INVESTMENT PLANINVESTMENT PLAN
Parameters for Inviting the InvestorsParameters for Inviting the Investors
�� Land about 33,000 Land about 33,000 KanalsKanals owned by RDAowned by RDA
�� Investor will be responsible for Road construction, Investor will be responsible for Road construction, Development of Economic Zone and Service Areas Development of Economic Zone and Service Areas by investing about by investing about RsRs 50 50 bnbn..
�� Detailed design of Economic Zone will be Detailed design of Economic Zone will be responsibility of Investor in the context of feasibility responsibility of Investor in the context of feasibility and preliminary plan prepared by RDAand preliminary plan prepared by RDA
�� Out of total saleable area of 9000 Out of total saleable area of 9000 KanalsKanals , investor to , investor to handover a minimum of 500 handover a minimum of 500 KanalsKanals in Economic in Economic Zone/ Service Area to RDA Zone/ Service Area to RDA
Parameters for Inviting the InvestorsParameters for Inviting the Investors
�� After sale of Economic Zone and Service Areas, After sale of Economic Zone and Service Areas, Investor to payback the value of land to RDA within Investor to payback the value of land to RDA within 10 years of the Project.10 years of the Project.
�� Price escalation and construction supervision is Price escalation and construction supervision is covered in the disposal of saleable area. covered in the disposal of saleable area.
�� Toll collection by Investor.Toll collection by Investor.
�� Concession period for collection of Toll by the Concession period for collection of Toll by the Investor is proposed for 15 years. During this period, Investor is proposed for 15 years. During this period, Investor will pay 50% of the Toll collected to RDA.Investor will pay 50% of the Toll collected to RDA.
�� Investor to hand over the Project to RDA on expiry of Investor to hand over the Project to RDA on expiry of concession period.concession period.
Investors are invited for the Investors are invited for the Investors are invited for the Investors are invited for the
partnership with Govt. of the partnership with Govt. of the partnership with Govt. of the partnership with Govt. of the
Punjab/RDA in the City Punjab/RDA in the City Punjab/RDA in the City Punjab/RDA in the City
Development Process of Development Process of Development Process of Development Process of
Rawalpindi Rawalpindi Rawalpindi Rawalpindi –––– Punjab.Punjab.Punjab.Punjab.