pre-qualification for company

62
Pre-Qualification Pre Qualification January. 2014 Contact Point : KIM D.H ([email protected], [email protected]) CHO C.M ([email protected], [email protected])

Upload: lamdang

Post on 18-Jan-2017

258 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Pre-Qualification for Company

Pre-QualificationPre QualificationJanuary. 2014

Contact Point : KIM D.H ([email protected],[email protected])

CHO C.M ([email protected],[email protected])

Page 2: Pre-Qualification for Company

Pre-Qualification for Company1 of 60

INDEX

2. Company History

1. General Company Introduction

3. Company Organization

4. Business Field

5. Application

6. ISO Certificates

7. Applied Code & Standards

8. Certificates & Awards

10. Business Experience Lists

9. Major Customers

11. ClientClient

Page 3: Pre-Qualification for Company

Pre-Qualification for Company2 of 60

1. 1. General Company IntroductionGeneral Company Introduction

TAE-HEUNG CORROSION ENGINEERING CO., LTD.COMPANY NAME ,COMPANY NAME

SEPTEMBER 26, 2000ESTABLISHMENT DATE

HYUNG-GIL, KANG (姜 炯 吉)

ULSAN, SOUTH KOREAHEAD OFFICE

CEO & PRESIDENT

USD $12 B (2013)SALES AMOUNT

ULSAN, SOUTH KOREAHEAD OFFICE

Seoul

Http://www. thce.co.krHOME PAGE

OFFICE : 500㎡Ulsan

1611-156 Enfield Place, Mississauga, Ontario, CanadaTel: 416 705 3059

OVERSEA OFFICE

OFFICE : 500㎡FABRICATION B/D : 3,000 ㎡AREA

Tel: 416-705-3059JASON AHN / [email protected]

Page 4: Pre-Qualification for Company

Pre-Qualification for Company3 of 60

1. 1. General Company IntroductionGeneral Company Introduction

HEAD OFFICE 573-4, Yaeum-Dong, Nam-Gu, Ulsan Metropolitan City, South KoreaTel : +82)52-258-2135~6 Fax : +82)52-258-2132

Dong-Hyuk, KIM / Vice President+82 10 3794 7346 / th 25@h il t

CONTACT POINT

Tel : +82)52 258 2135 6 Fax : +82)52 258 2132E-mail : [email protected]

Chong-Mun, CHO / Managing Director+82 10 5883 1664 / thce25@hanmail net

+82-10-3794-7346 / [email protected] [email protected]

+82-10-5883-1664 / [email protected] [email protected]

Page 5: Pre-Qualification for Company

Pre-Qualification for Company4 of 60

1. 1. General Company IntroductionGeneral Company Introduction

FABRICATION FACTORY 693-1, Gacheon-Ri, Samnam-Myeon, Uljoo-Gun,

Tel : +82)52-254-3049 Fax : +82)52-254-3049E-mail : [email protected]

Ulsan Metropolitan City, South Korea

Page 6: Pre-Qualification for Company

Pre-Qualification for Company5 of 60

2. Company History2. Company History

Established TAE-HEUNG Corrosion Engineering Corp.

Established Factory in Ulju-gun, Ulsan Metropolitan, Korea

Established TAE-HEUNG Corrosion Engineering Corp.Established TAE-HEUNG Corrosion Engineering Corp.

Established Factory in Ulju-gun, Ulsan Metropolitan, Korea Established Factory in Ulju-gun, Ulsan Metropolitan, Korea

Sep. 2000

Sep. 2001

Registered as an official maintenance service provider for KOSPO

ff f O O

Registered as an official maintenance service provider for KOSPORegistered as an official maintenance service provider for KOSPO

ff f O Off f O O

Oct. 2001

Registered as an official maintenance service provider for KOMIPO

Acquired ISO 9001 Certificate

Registered as an official maintenance service provider for KOMIPORegistered as an official maintenance service provider for KOMIPO

Acquired ISO 9001 CertificateAcquired ISO 9001 Certificate

Jul. 2002

Apr. 2003

Registered as experienced official supplier for KOSPO

R i t d i d ffi i l li f KOSEP

Registered as experienced official supplier for KOSPORegistered as experienced official supplier for KOSPO

R i t d i d ffi i l li f KOSEPR i t d i d ffi i l li f KOSEP

Jun. 2005

Registered as experienced official supplier for KOSEP

Acquired ISO 14001 Certificate

Registered as experienced official supplier for KOSEPRegistered as experienced official supplier for KOSEP

Acquired ISO 14001 CertificateAcquired ISO 14001 Certificate

Jan. 2006

May. 2007

Page 7: Pre-Qualification for Company

Pre-Qualification for Company6 of 60

2. Company History2. Company History

Established Taeheung Corrosion Engineering Corp.Established Taeheung Corrosion Engineering Corp.

Established Factory in Ulju-gun, UlsanEstablished Factory in Ulju-gun, Ulsan

Jul. 2008

Oct. 2009

Receive the Appreciation Certificate from SK energyReceive the Appreciation Certificate from SK energy

Registered as a partner to Doosan Heavy Industries & ConstructionRegistered as a partner to Doosan Heavy Industries & Construction

Registered as an official maintenance service provider for KOSPORegistered as an official maintenance service provider for KOSPO

ff f O Off f O O

Jun. 2010 Receive the Appreciation Plaque from Ulsan Thermal Plant of EWPReceive the Appreciation Plaque from Ulsan Thermal Plant of EWP

Registered as an official maintenance service provider for KOMIPORegistered as an official maintenance service provider for KOMIPO

Acquired ISO 9001 CertificateAcquired ISO 9001 Certificate

Jun. 2011

Jul. 2011

Acquired INNO-BIZ CertificateAcquired INNO-BIZ Certificate

Registered as a partner to POSCO E&CRegistered as a partner to POSCO E&C

Registered as experienced official supplier for KOSPORegistered as experienced official supplier for KOSPO

R i t d i d ffi i l li f KOSEPR i t d i d ffi i l li f KOSEP

Aug. 2011 Registered as a partner to KHNP & KEPCORegistered as a partner to KHNP & KEPCO

Registered as experienced official supplier for KOSEPRegistered as experienced official supplier for KOSEP

Acquired ISO 14001 CertificateAcquired ISO 14001 Certificate

Dec. 2011

Jul. 2012

Registered as a partner to DAEWOO E&C [Construction Field]Registered as a partner to DAEWOO E&C [Construction Field]

Registered as a partner to SK E&C [Construction Field]Registered as a partner to SK E&C [Construction Field]

Page 8: Pre-Qualification for Company

Pre-Qualification for Company7 of 60

3. Company Organization3. Company Organization

CEO & PRESIDENT

Q.A / Q.CQ.A / Q.CQ.A / Q.C

Vice President

Managing Director

Technical Dept.General Dept. Construction Dept.

EngineeringAdministration M f t i Construction Follow upSales Team Engineering Team

Administration Team

Manufacturing Team

Construction Team

Follow-upService Team

Page 9: Pre-Qualification for Company

Pre-Qualification for Company8 of 60

4. Business Field4. Business Field

CONSTRUCTION – Cathodic Protection · Anode

Concrete Rebar (Posts, Beams, Buildings)

Oil Storage Tanks, Steel-Pile Foundation g(Bridges and soil foundations)

Ships, Harbors, Offshore Platforms, Offshore Jackets BargesJackets, Barges

Page 10: Pre-Qualification for Company

Pre-Qualification for Company9 of 60

4. Business Field4. Business Field

CONSTRUCTION – Cathodic Protection · Anode

U/G Pipe (Integrated waterworks, Oil P/L, LNG P/L, Gas P/L)

Subsea Pipelines, Discharge Pipelines

P Pl tPower Plants(S/ Condenser, Heater ExchangerPiping, Storage Tanks)Petrochemical Plants

Page 11: Pre-Qualification for Company

Pre-Qualification for Company10 of 60

4. Business Field4. Business Field

MATRIAL – Cathodic Protection · Anode

RECTIFIER(Automatic & Manual)ANODE(Mg Anode Zn Anode Al Anode(Mg-Anode, Zn-Anode, Al-Anode,Pg-Ag Anode, Pt-Ti Anode, MMO Anode,MMO Tubular Anode, H.S.C.I Anode,Titanium Mesh Ribbon Anode ETC )

AL-ANODE ZINC Ref.ELECTRODE

Titanium Mesh Ribbon Anode ETC.)Wireline / Wireless Communication SystemOther Materials for Cathodic Protection

Zn-ANODE Ti-Ribbon ANODE

RECTIFIER MG-ANODE H.S.C.I ANODE

Page 12: Pre-Qualification for Company

Pre-Qualification for Company11 of 60

5. Application5. Application

CONCRETE (REPAIR WORKS)

Corrosion Investigation and Inspection at siteCorrosion Investigation and Inspection at site

Cathode Ray Connection and Electrode InstallationCathode Ray Connection and Electrode Installation

Page 13: Pre-Qualification for Company

Pre-Qualification for Company12 of 60

5. Application5. Application

CONCRETE (NEW WORKS – Cathodic Protection Installation)

Installation Installation of Rectcifier of Rectcifier and Pull Box for Work Process and Pull Box for Work Process

Page 14: Pre-Qualification for Company

Pre-Qualification for Company13 of 60

5. Application5. Application

CONCRETE (NEW WORKS – Cathodic Protection Installation)

Ribbon Mesh Anode Ribbon Mesh Anode

Ag/Ag/AgClAgCl Ref. ElectrodeRef. Electrode

Page 15: Pre-Qualification for Company

Pre-Qualification for Company14 of 60

5. Application5. Application

CONCRETE (NEW WORKS – Cathodic Protection Installation)

Ribbon Anode Clip InstallationRibbon Anode Clip InstallationRibbon Anode Clip InstallationRibbon Anode Clip Installation

Installation of FRP Cover and Mold for Work Process Installation of FRP Cover and Mold for Work Process

Page 16: Pre-Qualification for Company

Pre-Qualification for Company15 of 60

5. Application5. Application

U/G PIPELINE (NEW WORKS – Cathodic Protection Installation)

Test box Test box InstallationInstallation

Page 17: Pre-Qualification for Company

Pre-Qualification for Company16 of 60

5. Application5. Application

U/G PIPELINE (NEW WORKS – Cathodic Protection Installation)

Rectifier InstallationRectifier Installation

Page 18: Pre-Qualification for Company

Pre-Qualification for Company17 of 60

5. 5. ApplicationApplication

POWER PLANTS (Cathodic Protection · Anode)

Surface Condenser · Heater Exchanger · Storage TankSurface Condenser · Heater Exchanger · Storage Tank

Page 19: Pre-Qualification for Company

Pre-Qualification for Company18 of 60

6. ISO Certificates6. ISO Certificates

ISO 9001: 2000 Certificate ISO 14001 Certificate

Page 20: Pre-Qualification for Company

Pre-Qualification for Company19 of 60

NACE (National Association of Corrosion Engineering)

7. 7. Applied Code and StandardsApplied Code and Standards

DNV

API

NORSOK NORSOK

ANSI/IEEE

NFPA

BSI

Cathodic Protection Association

Page 21: Pre-Qualification for Company

Pre-Qualification for Company20 of 60

8. Certificates & Awards 8. Certificates & Awards

Page 22: Pre-Qualification for Company

Pre-Qualification for Company21 of 60

8. Certificates & Awards 8. Certificates & Awards

Page 23: Pre-Qualification for Company

Pre-Qualification for Company22 of 60

8. Certificates & Awards 8. Certificates & Awards

Page 24: Pre-Qualification for Company

Pre-Qualification for Company23 of 60

KEPCO / KHNP / KPS / KOPEC / KOSEP

99. Major Customers. Major Customers

POSCO ENGINEERING

KOGAS

K-WATER

KP CHEMICAL

LG CHEMICAL

HYUNDAI HEAVY INDUSTRIES

HYUNDAI GREEN POWERKP CHEMICAL

SK ENGINEERING & CONSTRUCTION

S&T COPORATION

HYUNDAI GREEN POWER

HYUNDAI ENGINEERING

HYUNDAI OIL BANK

DAELIM INDUSTRIES

DAEWOO E&C

HYUNDAI E&C

DAEWOO S&M

STX HEAVY INDUSTRIES

SAMSUNG C&T

LOTTE CHEMICAL

ISU CHEMICAL

KOLON GLOBAL

HANWHA ENERGY

GS CALTEX

GS E&C

HANWHA ENERGY

HANWHA CHEMICAL

HANJIN HEAVY INDUSTRY

DOOSAN HEAVY INDUSTRY & CONSTRUCTION

Page 25: Pre-Qualification for Company

Pre-Qualification for Company24 of 60

99. Major Customers. Major Customers

JAPAN

SAUDI ARABIA

CHILE

INDONESIAINDONESIA

UAE

LIBIYA

MALAYSIA

ALGERIA

QATAR

OMAN

PHILIPPINESPHILIPPINES

BANGLADESH

Page 26: Pre-Qualification for Company

Pre-Qualification for Company25 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2013 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for Bukpyeong thermal power plant #1,2(1000MW x 2 PACKAGE) 2013.12 ~ 2016.01 STX HEAVY

INDUSTRIES KEPCO

2 Cathodic Protection for Kumkang 2 Area Pipeline 2013.12 ~ 2018.06 HANJIN HEAVYINDUSTRIESINDUSTRIES

3 Cathodic Protection for U/G pipeline 2013.12 ~ 2014.02 HANWHA ENERGY

4 Delivery for Cathodic Protection System 2013.12 ~ 2013.12 C.A PROTEC

5 Delivery and Installation Anode for Cathodic Protection System 2013.12 ~ 2014.01 DONGKANG

6 Cathodic Protection System for Pipeline DCVG 2013.12 ~ 2016.10 KOGAS

7 Delivery and Installation Anode for Cathodic Protection System 2013.12 ~ 2013.12 TSM TECH

8 Cathodic Protection for MF-6003 Tank Bottom 2013.12 ~ 2014.04 HYUNDAI OIL BANK

9 Delivery and Installation Anode for Cathodic Protection System 2013.12 ~ 2013.12 DONGANG

10 Cathodic Protection System for Tank Bottom 2013.11 ~ 2013.12 KOREA EAST-WEST POWER KEPCO

11 Delivery for Cathodic Protection System Test box 2013.11 ~ 2013.11 CHUNGBUKCITY GAS

Page 27: Pre-Qualification for Company

Pre-Qualification for Company26 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2013 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for ULSAN Tank Terminal 800 Area 2013.11 ~ 2014.01 SAMSUNG C&T

13 Cathodic Protection System for DANGJIN #9, 10 (FGD)(1000MW x 2 PACKAGE) 2013.11 ~ 2014.10 STX HEAVY

INDUSTRIES KEPCO(1000MW x 2 PACKAGE) INDUSTRIES

14 SILO Pipe line for Cathodic Protection System 2013.11 ~ 2013.12 TAEYOUNGINDUSTRIES

15 Delivery for Cathodic Protection System Test box 2013.11 ~ 2013.11 CHUNGBUKCITY GASCITY GAS

16 Cathodic Protection for ULSAN Tank Terminal 800 Area 2013.11 ~ 2014.01 SAMSUNG C&T

17 Delivery and Installation Rectifier for Cathodic Protection 2013.11 ~ 2013.11 KOREA PETROCHEMICAL

18 Delivery for Cathodic Protection System Ref.electrode(500MW x 4 PACKAGE) 2013.10 ~ 2013.10 HYUNDAI GREEN

POWER

19 Inspection & repair work of Cathodic Protection for YANGSAN main pipeline 2013.10 ~ 2013.10 K-WATER

20 Cathodic Protection for 800 AREA Complex 2013.10 ~ 2014.01 TAEYOUNGINDUSTRIES

21 Cathodic Protection for ULSAN #4 CCW Heat Exchanger(948MW) 2013.10 ~ 2013.10 SEDAE ENERTECH KEPCO

22 Cathodic Protection for Ulsan Main pipeline 2013.09 ~ 2013.12 K-WATER

Page 28: Pre-Qualification for Company

Pre-Qualification for Company27 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2013 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Cathodic Protection for Yeosu Hanhwa Chemical NAOH 2013.09 ~ 2013.10 BUHMWOO MEASURING

24 Cathodic Protection for Yeosu MAIN pipeline 2013.09 ~ 2013.10 YEOSU INDUSTRIAL COMPLEXCOMPLEX

25 Inspection & repair work of Cathodic Protection Facilities 2013.09 ~ 2013.12 YNCC

26 Cathodic Protection for ULSAN Hyundai oil Terminal pipeline 2013.09 ~ 2014.01 BOOMYUNGCONSTRUCTIONCONSTRUCTION

27 Cathodic Protection for Sungun Tank Terminal Pipeline 2013.08 ~ 2013.11 SIMCHUN CONSTRUCTION

28 Cathodic Protection for S-OIL Steam Pipeline 2013.08 ~ 2014.03 DAEGONG

29 Cathodic Protection for ULSAN #4 CCPP of Intake Facility(948MW) 2013.08 ~ 2013.09 ILSHIN KEPCO

30 Delivery for Cathodic Protection System Anode 2013.07 ~ 2013.07 SAMWON

31 Cathodic Protection for Main pipeline in Tongyoung~Geoje 2013.07 ~ 2014.12 KOGAS

32 Delivery for Cathodic Protection System Anode 2013.07 ~ 2013.07 KJ CORP.

33 Cathodic Protection for #1,2 CWP Yard Area 2013.07 ~ 2013.07 KEPCO KPS KEPCO

Page 29: Pre-Qualification for Company

Pre-Qualification for Company28 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2013 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

34 SILO PROJECT for Cathodic Protection System 2013.06 ~ 2013.07 TAEYOUNGINDUSTRIES

35 PYEONGTAEK for Cathodic Protection System Facilities 2013.06 ~ 2014.05 KOLON GLOBAL

36 Test & Inspection work of Cathodic Protection System 2013.06 ~ 2013.12 YNCC

37 Delivery and Installation Anode for Cathodic Protection System 2013.05 ~ 2013.05 EWPULSAN PLANT KEPCOULSAN PLANT

38 #1 LBO(EPC) PROJECT for Cathodic Protection System 2013.05 ~ 2013.08 HYUNDAI ENG

39 Cathodic Protection System Facilities 2013.05 ~ 2013.06 KOREA MIDLAND POWER KEPCO

40 Delivery and Installation Anode for Cathodic Protection System 2013.05 ~ 2013.05 HYUNDAI GREEN

POWER

41 Delivery for IJP & PCR 2013.05 ~ 2013.05 TAEYOUNG ELECTRONICS

42 Cathodic Protection for Songsan~Sandan Water supply pipeline 2013.04 ~ 2013.09 K-WATER

43 Cathodic Protection System for DANGJIN #9, 10(1000MW x 2PACKAGE) 2013.04 ~ 2016.03 KOREA EAST-WEST

POWER KEPCO

44 Design service and Environment survey for Cathodic Protection System 2013.03 ~ 2013.01 DOWHA ENG

Page 30: Pre-Qualification for Company

Pre-Qualification for Company29 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2013 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

45 Cathodic Protection System for TS-7100 PROJECT 2013.03 ~ 2013.11 POSCO ENG

46 Cathodic Protection System for Wirye New Town 2013.03 ~ 2014.01 KWANGYOUNGENCENC

47 Delivery for MMO ANODE 2013.03 ~ 2013.03 KJ CORP.

48 Cathodic Protection for U/G Pipe line 2013.03 ~ 2013.05 ISU CHEMICAL

49 Inspection & repair work of Cathodic Protection Rectifier 2013.03 ~ 2013.04 TAEYOUNG HORIZON

50 Inspection & repair work of Cathodic Protection Facilities 2013.03 ~ 2013.04 LG CHEMICAL

51 Inspection & repair work of Cathodic Protection Facilities 2013.03 ~ 2013.03 TONGSUHPETROCHEMICAL

52 Delivery for Cathodic Protection System Matrial 2013.02 ~ 2013.02 SEAN PRECISION MACHINERY

53 Inspection & repair work of Cathodic Protection Facilities 2013.01 ~ 2013.12 LOTTE CHEMICAL

54 Cathodic Protection System for 2nd Pyeongtaek Combined Cycle power plant (500MW x 1 PACKAGE) 2013.01 ~ 2013.03 DAELIM INDUSTRIAL KEPCO

55 Delivery for Cathodic Protection System Matrial 2013.01 ~ 2013.01 DONGHWA

Page 31: Pre-Qualification for Company

Pre-Qualification for Company30 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2012 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for Pocheon~Gyoha Main pipe 2012.12 ~ 2015.09 KOGAS

2 Design service for Stabilize the business of Metropolitan 2012.12 ~ 2013.10 HAPDONG DISIGN

3 Cathodic Protection for Main Pipe in DAEGU new city 2012.12 ~ 2014.06 MJ ENC

4 Design service & Environment survey for Cathodic protection 2012.11 ~ 2012.12 K-WATER

5 Cathodic Protection for ULSAN #4 CCPP PROJECT 2012.11 ~ 2014.07 DAELIM INDUSTRIAL KEPCO

6 Cathodic Protection for Ulsan #4 CCPP S/ CONDENSER (948MW) 2012.11 ~ 2013.04 SEDAE ENERTEC KEPCO( )

7 Cathodic Protection System for Dongducheon Thermal power plant (500MW x 2 PACKAGE) 2012.11 ~ 2014.12 SAMSUNG C&T KEPCO

8 Design service for Cathodic protection 2012.10 ~ 2013.03 KOREAENGINEERING

9 PKX 5th Batch Waterject Anode Zinc 2012.11 ~ 2013.02 DOOSAN HEAVY INDUSTRIES

10 Electric work in Jangdong~Damyang, Okgwa~Namwon 2012.10 ~ 2012.12 SEWON E&I

11 Design service for Stabilize the business of Metropolitan 2012.10 ~ 2013.03 KECC

Page 32: Pre-Qualification for Company

Pre-Qualification for Company31 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2012 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for Onsan Tank terminal OSBL piping 2012.10 ~ 2013.06 T.E.C KOGAS

13 Cathodic Protection for OSBL piping of Onsan Tank Terminal 2012.10 ~ 2012.11 T.E.C KOGAS

14 Inspection Service for Cathodic Protection in Yeosu U/G Pipe 2012.09 ~ 2012.09 YEOSU INDUSTRIAL COMPLEX

15 Cathodic Protection for 500 Area Complex 2012.09 ~ 2012.11 TAEYOUNG INDUSTRIESINDUSTRIES

16 Cathodic Protection System for East Sea Biomass Power Plant (30MW) 2012.09 ~ 2012.12 BHI

17 Installation of Cathodic Protection system for ULSAN #4 CCPP Yard (948MW) 2012.09 ~ 2014.07 HYUNDAI HEAVY

INDUSTRIES KEPCO( )

18 Manufacture and Supply of Cathodic Protection Rectifier for Hyundai Green Power 2012.08 ~ 2012.11 PRIME CORP.

19 Cathodic Protection for Main Pipe in Samchuk~Yeongweol 2012.08 ~ 2013.12 KOGAS

20 Delivery and Installation Anode for Cathodic Protection System 2012.07 ~ 2012.08 HYUNDAI GREEN POWER

21 Cathodic Protection System for Pohang Gas Combined Cycle Power Plant #1,2 (290MW x 2 PACKAGE) 2012.07 ~ 2013.02 BHI POSCO

22 Cathodic Protection for G-project Utility equipment and Pipe in KP Chemical 2012.07 ~ 2012.09 SEAYOUNG CORP.

Page 33: Pre-Qualification for Company

Pre-Qualification for Company32 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2012 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Delivery and Installation Anode for Cathodic Protection System 2012.07 ~ 2012.08 EWPULSAN PLANT KEPCO

24 Yulchon ll CCPP Surface Condenser 2012.07 ~ 2013.02 BHI

25 Cathodic Protection for Bugok Office of extension work 2012.06 ~ 2013.05 KOGAS

26 Inspection of Cathodic Protection System for In/Out Site 2012.06 ~ 2012.09 YNCC

27 Maintenance of Cathodic Protection System For In/Out Site 2012.06 ~ 2012.10 YNCC

28 SEJONG Combined Heat & Power plant Anode Plate(500MW x 2 PACKAGE) 2012.06 ~ 2012.09 DOOSAN HEAVY

INDUSTRIES KEPCO( )

29 Cathodic Protection for Yeongheung heat power plant #5,6 (870MW x 2PACKAGE) 2012.05 ~ 2013.05 KOSEP

KC COTTRELL

30 Cathodic Protection for Songsan~Sandan Water supply pipeline 2012.04 ~ 2012.09 K-WATER

31 Cathodic Protection for SAMCHEOK Manufacturing Base #5~7 Storage Tank & Building Equipment Work 2012.04 ~ 2015.12 DAEWOO E&C

32 Cathodic Protection System for Shin Uljin NPP #1,2 S/ CONDENSER (1400MW x 2 PACKAGE) 2012.03 ~ 2015.03 S&TC KHNP

33 Cathodic Protection for Main Pipe in Nonsan~Buyeo, Asan~Baebang 2012.01 ~ 2013.02 KOGAS

Page 34: Pre-Qualification for Company

Pre-Qualification for Company33 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2011 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for Coast Maintenance Service In BUSAN Jagalchi Market 2011.12 ~ 2013.02 YANGJIN E&C

2 Cathodic Protection for Main pipeline in Gimje~Buan, Jangseong~Gochang 2011.12 ~ 2012.12 JEAIL ELECTRIC

POWER CORPJangseong Gochang POWER CORP.

3 Inspection Facility for Cathodic Protetion 2011.11 ~ 2012.10 KP CHEMICAL

4 Cathodic Protection for Hyundai Green Power Thermal Plant#5 ~ #8 (500MW x 4PACKAGE) 2011.11 ~ 2012.07 HYUNDAI E&C#5 #8 (500MW x 4PACKAGE)

5 Relocation of Cathodic Protection Test Box 2011.11 ~ 2011.11 KOREA NATIONAL OIL CORP.

6 Cathodic Protection of Main Pipe in Jinyoung V/S 2011.11 ~ 2011.12 KOGAS

7 Rectifier for Cathodic Protection System 2011.11 ~ 2011.12 EWPILSAN PLANT

8 Cathodic Protection system for OSBL Project 2011.10 ~ 2012.03 LG CHEMICAL

9 Maintenance of #4 Intake Chennel 2011.10 ~ 2011.11 KEPCO KPS KEPCO

10 Cathodic Protection of No.4 AN(E) DONGSUH PETRO CHEM. 2011.10 ~ 2012.12 DAELIM INDUSTRIAL

11 Inspection and Maintenance of U/G Pipe 2011.10 ~ 2013.09 HANHWACHEMICAL

Page 35: Pre-Qualification for Company

Pre-Qualification for Company34 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2011 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Maintenance of NAKDONG River 2011.10 ~ 2011.11 POWER DEVELOPMENT

13 Cathodic Protection for VCM U/G Pipe 2011.09 ~ 2011.10 HANHWA CHEMICAL

14 Young-Jong Sky City Auto-Cleannet 2011.09 ~ 2012.08 HWASUNG ELECTRONICS

15 Hyundai Oil Bank #2 BTX Project 2011.09 ~ 2014.09 HDO / HHI

16 Jinjung Bridge Salt Attack Protection Facility 2011.09 ~ 2011.10 CRS

17 Cathodic Protection System for 1100 Area Complex 2011.09 ~ 2011.11 TAEYOUNG INDUSTRIES

18 Exchange Controlling Board for B21~B26 Tank 2011.09 ~ 2011.10 EWPULSAN PLANT KEPCO

19 Cathodic Protection System for U/G Pipeline 2011.09 ~ 2011.09 DAEWOO S&T

20 Cathodic Protection for UC #1 C/TWR Area 2011.08 ~ 2011.12 YNCC

21 Cathodic Protection for Tank Farm Area 2011.08 ~ 2011.12 YNCC

22 Cathodic Protection for U/G Pipeline in ISU CHEMiCAL 2011.08 ~ 2011.08 TAEJONG ENG

Page 36: Pre-Qualification for Company

Pre-Qualification for Company35 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2011 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Cathodic Protection for Pohang New Port 2011.07 ~ 2012.06 DAEWOO ENGPOSCO

24 Delivery and Installation Rectifier for Cathodic Protection(500MW x 1 PACKAGE) 2011.06 ~ 2011.06 EWP

JEJU Plant KEPCO(500MW x 1 PACKAGE) JEJU Plant

25 Cathodic Protection System for VCM OC EDC TANK 2011.06 ~ 2011.08 LG CHEMICAL

26 Cathodic Protection System DATA System 2011.06 ~ 2011.09 CRS

27 Exchange of Oil Pipe in TAEKWANG Plant 2011.06 ~ 2011.08 JINSANCONSTRUCTION

28 Inspection & repair work of Cathodic Protection Rectifier 2011.05 ~ 2011.05 HANHWA CHEMICAL

29 Maintenance Rectifier of U/G Pipe 2011.05 ~ 2011.05 TAEYOUNG HOLIZEN

30 Cathodic Protection System for PKX 2ND BATCH WATERJET 2011.05 ~ 2011.05 DOOSAN HEAVY INDUSTRIES

31 Inspection of Cathodic Protection System for In/Out Site 2011.05 ~ 2011.12 YNCC

32 Inspection & Maintenance Rectifier of BD Plant for Cathodic Protection System 2011.05 ~ 2011.06 YNCC

33 Cathodic Protection System for LNG Leading-In Work in 11-00 Area 2011.05 ~ 2011.09 YEONHAP

DEVELOPMENT

Page 37: Pre-Qualification for Company

Pre-Qualification for Company36 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2011 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

34 LPG Storage Tank in LG SM Plant for Cathodic Protection 2011.04 ~ 2011.04 DAEKYUNG M&I

35 Inspection & repair work of Cathodic Protection Facilities 2011.04 ~ 2011.04 KOREA BASF

36 Cathodic Protection System for Yeosu Thermal Plant 2011.03 ~ 2011.03 HWASIN ELECTRONICS

37 Cathodic Protection System for KGS PUNCH 2011.03 ~ 2011.03 SAMSUNG ENG

38 Environment Survey & Design Service of Drainpipe 2011.02 ~ 2011.04 WATERWORK,NAMBU, SEOUL

39 Exchange City Gas of Cathodic Protection System 2011.02 ~ 2011.03 LGELECTRONICS

40 Cathodic Protection system for New PX U/G Pipe 2011.01 ~ 2011.03 HYOSUNG Corp.

41 Regular Inspection of U/G Oil Pipe Line 2011.01 ~ 2013.12 JUNGIL STOLT HEAVEN ULSAN

42 Delivery and Installation Anode for Cathodic Protection 2011.01 ~ 2011.02 T.S.M TECH

43 Cathodic Protection system for Samcheok LNGProduction Facility Maintenance 2011.01 ~ 2013.12 KOGAS

DAELIM INDUSTRIAL

44 Cathodic Protection for Main pipeline in Tongyoung ~ Geoje 2011.01 ~ 2012.12 KOGAS

Page 38: Pre-Qualification for Company

Pre-Qualification for Company37 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2010 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for SAMCHEOK Manufacturing Base #1~#4 Storage Tank & Building Equipment Work 2010.12 ~ 2013.12 KOGAS,

DAELIM

2 Delivery and Installation Anode for Cathodic Protection 2010.12 ~ 2011.03 EWP

3 Inspection of Cathodic Protection Facilities 2010.11 ~ 2011.10 KP CHEMICAL

4 Installation for Potential Facility 2010.11 ~ 2010.12 GS CALTEX

5 Cathodic Protection Facility for Buried Pipe 2010.11 ~ 2010.12 KOREA NATIONAL OIL CORP.

6 Cathodic Protection Control System for Intake #2 2010.11 ~ 2010.12 KOSEP

7 Exchange anode for Cathodic Protection System 2010.11 ~ 2010.11 KEPCO KPS

8 Delivery and Installation Anode for Cathodic Protection 2010.10 ~ 2010.10 ILSHIN

9 Change Construction for ISU~JSTT U/G Oil Pipe 2010.10 ~ 2010.10 ISU CHEMICAL

10 Cathodic Protection for Tank Bottom & U/G Pipe 2010.10 ~ 2010.12 TAEYOUNG INDUSTRY

11 Cathodic Protection for Gumi purification plant 2010.09 ~ 2010.11 K-WATER

Page 39: Pre-Qualification for Company

Pre-Qualification for Company38 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2010 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for BTX Revamping PJT 2010.08 ~ 2010.11 SAMSUNG C&T

13 Cathodic Protection for Main pipeline in Maecheon~Boeun, Okcheon~Muju 2010.08 ~ 2010.12 KOGASOkcheon Muju

14 Cathodic Protection for Gwanggyo Combined Heat & Power plant 2010.07 ~ 2012.12 KOREA DISTRICT

HEATING CORP.

15 Cathodic Protection for TK-2384 & U/G Pipe 2010.06 ~ 2010.07 SKC

16 Inspection of Cathodic Protection Facilities, the First/Second half of 2010 2010.06 ~ 2010.12 YNCC

17 Cathodic Proetction system for PKX 3rd Batch Waterjet 2010.06 ~ 2010.06 DOOSAN HEAVY INDUSTRIES

18 Cathodic Protection for Main pipeline in Mokpo~Haenam 2010.06 ~ 2010.12 KOGAS

19 Cathodic Protection System Rectifier for Condenser & Heat Exchanger 2010.05 ~ 2010.06 KOREA WESTERN

POWER KEPCO

20 Inspection and Maintenance for Cathodic Protection System 2010.05 ~ 2010.12 KOREAEXPRESSWAY CORP.

21 Anode Exchange in Condenser for Cathodic Protection System 2010.04 ~ 2010.04 KEPCO KPS KEPCO

22 Design service & Environment survey for Cathodic protection 2010.04 ~ 2010.05 K-WATER

Page 40: Pre-Qualification for Company

Pre-Qualification for Company39 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2010 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Cathodic Protection for #HOU PJT Jetty Modification 2010.04 ~ 2010.10 HYUNDAI OIL BANKJAEHYUN E&C

24 Cathodic Materials for Base Material Duct Line 2010.04 ~ 2010.05 CHEIL INDUSTRIES

25 Cathodic Protection for Civil Gas Pipe, 2010 2010.04 ~ 2011.02 SK E&S

26 Delivery and Installation for Cathodic Protection System 2010.03 ~ 2011.02 SK ENERGY

27 Inspection of Cathodic Protection System in All Site 2010.03 ~ 2010.05 YNCC

28 Cathodic Protection for YEOMPO Dock 2010.03 ~ 2010.04 U-CHANG PLANT

29 Cathodic Protection for Main pipeline in Gimje~Buan 2010.03 ~ 2012.12 KOGAS A-JEON ENC

30 Delivery and Installation Anode for Cathodic Protection System 2012.02 ~ 2012.04 PUBLIC PROCUREMENT

31 Cathodic Protection for Industrial Water Pipe Line in ULSAN(2nd Year) 2010.01 ~ 2010.12 K-WATER

32 Cathodic Protection for Main pipeline in Eumseong~Goesan, Jecheon~Danyang 2010.01 ~ 2011.12 KOGAS

33 Cathodic Protection System for CPS KPC 3-2 PROJECT 2010.01 ~ 2010.03 SAMSUNG EVERLANG

Page 41: Pre-Qualification for Company

Pre-Qualification for Company40 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 200910. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Delivery Reftifier for Cathodic Protection System 2009.12 ~ 2009.12 EWP ULSAN Plant KEPCO

2 Cathodic Protection for Main pipeline in Eumseong~Goesan, Jecheon~Danyang 2009.11 ~ 2009.12 KOGAS

GS E&CJecheon Danyang GS E&C

3 Cathodic Proetction for B-Project 2009.11 ~ 2010.10 LOTTE E&C

4 Cathodic Protection for Oil pipeline 2009.11 ~ 2009.12 KOREA NATIONALOIL CORP.OIL CORP.

5 Cathodic Protection for Seom-jin River Bridge in Namhae Highway 2009.11 ~ 2009. 12 KOREA

EXPRESSWAY CORP.

6 Inspection & repair work of Cathodic Protection Facilities(2nd half of year 2009) 2009.11 ~ 2010.01 YNCC( y )

7 Cathodic Protection for Circulating waterline 2009.10 ~ 2009.11 KOSEPSAMCHEONPO Plant KEPCO

8 Cathodic Protection for U/G pipeline in Tong-yeong Manufacturing Base #15~#16 Storage Tank Area 2009.10 ~ 2011.10 KOGAS

DAELIM INDUSTRIAL

9 Research & development outsourcing of control equipment applicable to optimum efficiency protection current 2009.10 ~ 2010.11 EWP

ULSAN Plant KEPCO

10 Cathodic Protection for Underground Pipelines 2009.10 ~ 2009.11 TAEYOUNGINDUSTRIES

11 Cathodic Protection for Main pipeline in Samcheok Manufacturing Bas~Yeongwol 2009.10 ~ 2013.12 KOGAS

Page 42: Pre-Qualification for Company

Pre-Qualification for Company41 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 200910. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for Drawback of LG Chem ETC 4 Area 2009.09 ~ 2009.09 LG CHEMICAL

13 Inspection & repair work of Cathodic Protection Facilities 2009.09 ~ 2009.12 YNCC

14 Cathodic Protection for Outline pipe in NCC 2009.08 ~ 2009.12 LG CHEMICAL

15 Cathodic Protection for #1, #3 CSU Cleaning PIT in Gwangyang Port 2009.08 ~ 2010.02 POSCO

DAEWOO ENGGwangyang Port DAEWOO ENG

16 Cathodic Protection for Main pipeline in Gimcheon ~ Mungyeong 2009.08 ~ 2012.12 KOGAS

SSANGYONG E&C

17 Temporary Cathodic Protection for Main pipeline in Uljin~Sokcho 2009.08 ~ 2013.11 KOGAS

DAELIM INDUSTRIALj

18 Cathodic Protection for Main pipeline in Eumseong ~ Goesan, Jecheon~Danyang 2009.08 ~ 2012.12 KOGAS

19 S-OIL Onsan Refinery Expansion Project 2009.08 ~ 2010.08 S-OILSAMSUNG ENG

20 Installation for Cathodic Protection System 2009.07 ~ 2009.11 SKC

21 Cathodic Protection System 2009.07 ~ 2009.07 TONGSUHPETROCHEMICAL

22 Cathodic Protection System Goyang·Samsong Community Energy Facilities 2009.06 ~ 2011.10 KOREA DISTRICT

HEATING CORP.

Page 43: Pre-Qualification for Company

Pre-Qualification for Company42 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 200910. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Cathodic Protection for OIL pipeline 2009.06 ~ 2009.07 KOREA VOPAC TERMINAL

24 Cathodic Protection for Woterworks pipeline 2009.06 ~ 2009.07 WEST Water & Wastewater AgencyWastewater Agency

25 Cathodic Protection for SP PROJECT 2009.06 ~ 2010.06 WOONJIN POLYSILICON

26 Cathodic Protection for main pipeline in ULSAN 2009.05 ~ 2009.12 K-WATER

27 Cathodic Protection for U/G Pipeline in Yeongwol Thermal power station 2009.05 ~ 2010.06 KOGAS

28 Delivery and Installation Control module for Cathodic Protection System in CONDENSER 2009.05 ~ 2009.06 KOREA MIDLAND

POWER KEPCOy

29 Inspection & repair work of Cathodic Protection Facilities(1st half of year 2009) 2009.04~ 2009.06 YNCC

30 Delivery and Installation Rectifier for Cathodic Protection 2009.04 ~ 2009.06 KANGDONG Water & Wastewater Agency

31 Cathodic Protection for City gas pipeline (2009) 2009.04 ~ 2010.03 SK E&S

32 Delivery and Installation AL-ANODE for Cathodic Protection 2009.04 ~ 9009.04 SONGO CONSTRUCTION

33 Cathodic Protection for Intake Facilities inYeongwol Thermal power station 2009.03 ~ 2009.05 ILSHIN

Page 44: Pre-Qualification for Company

Pre-Qualification for Company43 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2009 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

34 Cathodic Protection for Pile in Hyundai Samho Heavy Industries 2009.03 ~ 2009.09 HYUNDAI E&C

35 Cathodic Protection for Pipeline in Gancheok 2009.03 ~ 2009.05 ILSHIN

36 Delivery and Installation Flask Junction Box for Cathodic Protection System 2009.03 ~ 2009.08 TSM TECH

37 Delivery and Installation Rectifier for Cathodic Protection 2009.02 ~ 2009.03 WEST Water & Wastewater AgencyWastewater Agency

38 Inspection of Cathodic Protection System for U/G pipeline 2009.02 ~ 2010.12 JUNGIL STOLT HEAVEN ULSAN

39 Cathodic Protection for #1 Condenser 2009.02 ~ 2009.03 EWP ULSAN Plant KEPCO

40 Inspection of Cathodic Protection System for U/G pipeline 2009.02 ~ 2009.12 KOREA EXPRESSWAY CORP.

41 Cathodic Protection for LS Cable & System site 2009.01 ~ 2009.12 CHARMVIT CHUNG-BUK CITY GAS

42 Cathodic Protection for Elicia APT 2009.01 ~ 2009.12 CHARMVIT CHUNG-BUK CITY GAS

Page 45: Pre-Qualification for Company

Pre-Qualification for Company44 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2008 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for Natural Gas valve station 2008.12 ~ 2009.01 KOGAS

2 Cathodic Protection for 50,000 Tons Water Storage Tank 2008.12 ~ 2009.02 LG CHEMICALYEOSU PlantYEOSU Plant

3 Cathodic Protection for Route 1 Installation of an underground Road 2008.12 ~ 2009.05 UIWANG CITY

SHINAN E&C

4 Cathodic Protection for JEONGOK Port Theme Port Development Project 2008.12 ~ 2009.06 HWASUNG CITY

HYUNDAI E&CDevelopment Project HYUNDAI E&C

5 Cathodic Protection of Facilities #3 Condenser 2008.11 ~ 2008.11 EWPULSAN Plant KEPCO

6 Cathodic Protection for HDPE Underground pipeline 2008. 11 ~ 2009.03 DAELIM INDUSTRIAL

7 Inspection and Maintenance for Cathodic Protection Facilities 2008.11 ~ 2010.10 KP CHEMICAL

8 Relocation of Cathodic Protection Facilities in GS-Caltex Site 2008.11 ~ 2009.01 LG CHEMICAL

9 Cathodic Protection for Pipe External 3 District 2008.10 ~ 2009.01 SKC AIR GAS

10 Cathodic Protection for Steel Pile Multifunction tank in KUKDONG Port 2008.10 ~ 2009.01 JAEHYUN E&C

11 Cathodic Protection for #2 Thermal Plant in JEJU 2008.10 ~ 2009.06 KOMIPODAELIM INDUSTRIAL KEPCO

Page 46: Pre-Qualification for Company

Pre-Qualification for Company45 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2008 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for YONG-IN Main Pipe 2008.10 ~ 2011.12 KOGAS,DAELIM INDUSTRIAL

13 Electric Work for ULSAN “Whale Museum” 2008.10 ~ 2009.10 NAM-GU OFFICE ULSAN CITYULSAN CITY

14 Supply and Installation the AL-Anode for maintenance 2008.09 ~ 2008.10 DONGWON SHIPBUILDING

15 Cathodic Protection for LC U/G Pipe 2008.09 ~ 2008.10 SKC

16 Cathodic Protection for OS Tank 2008.08 ~ 2009.03 KP CHEMICAL

17 Cathodic Protection for NG Supply Pipe#1,2 Complex 2008.08 ~ 2008.08 EWPULSAN Plant KEPCO

18 Cathodic Protection for GUNSAN Complex Thermal Site(EC-06-02) 2008.07 ~ 2010.05 KOWEPO

DAELIM INDUSTRIAL KEPCO

19 Supply of Cathodic Protection Rectifier 2008.07 ~ 2008.11 WATERWORK,GANGNAM

20 Cathodic Protection for HYUNDAI Green Power Plant #1~#4(500MW x 4 PACKAGE) 2008.06 ~ 2010.12 DAELIM INDUSTRIAL KEPCO

21 Installation Work of Cooling &Heating System in DAEHYUN MIDDLE SCHOOL 2008.06 ~ 2008.08 DISTRICT OF

EDUCATION,ULSAN

22 Cathodic Protection for Nitrogen, oxygen Pipe 2008.05 ~ 2008.10 SDG

Page 47: Pre-Qualification for Company

Pre-Qualification for Company46 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2008 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Cathodic Protection for TK1 SK NAC 2008.05 ~ 2008.07 SDG

24 Installation Work of Cooling &Heating System in DAEHYUN MIDDLE SCHOOL 2008.05 ~ 2008.10 SK E&S MIDDLE SCHOOL

25 Relocation of Cathodic Protection for Regional Water Supply Pipe 2008.05 ~ 2008.07 KWANGMYUNG CITY

26 Inspection and Maintenance for Cathodic Protection System 2008.05 ~ 2008.12 YNCC

27 Cathodic Protection of Oil Pipe 2008.05 ~ 2008.09 BAKYANG MEGA TECH

28 Cathodic Protection for Automated Waste Collection in GIMPO 2008.04 ~ 2011.09 KLHCHYUNDAI E&C

29 Manufacturing for Intake Rectifier 4 Sets 2008.04 ~ 2008.06 KOSEP

30 Installation of BASF Inner M/S POWER LINE 2008.04 ~ 2008.05 SKC AIR GAS

31 Maintenance of Cathodic Protection #5 Intake 2008.04 ~ 2008.04 EWPULSAN Plant KEPCO

32 Manufacturing and Installation of Cathodic Protection Rectifier for POSCO CONDENSER 2008.04 ~ 2008.06 HANDONG

INDUSTRY

33 Cathodic Protection for Steel Pipe in 1 Yard 2008.04 ~ 2008.04 SEKYUNG CONStrUCTION

Page 48: Pre-Qualification for Company

Pre-Qualification for Company47 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2008 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

34 Drainage Work for Motor Control Panel 2008.03 ~ 2008.04 NAM-GU OFFICE ULSAN

35 Cathodic protection for Tank Terminal in ONSAN Port 2008.03 ~ 2009.02 TAEYOUNG E&C KOGAS

36 Cathodic Protection for STC OCU Project 2008.02 ~ 2008.09 SAMSUNG C&T

Page 49: Pre-Qualification for Company

Pre-Qualification for Company48 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 200710. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for Vofak 2 Terminal 2007.11 ~ 2007.12 KOREA VOFAK TERMINAL KOGAS

2 Cathodic Protection (Base~Buoy) 2007.11 ~ 2007.12 KNOC, ULSAN

3 Maintenance of Cathodic Protection at site 2007.11 ~ 2008.02 YNCC

4 Cathodic Protection for Gas Supply Pipe 2007.10 ~ 2008.02 YEONHAP DEVELOPMENTDEVELOPMENT

5 Cathodic Protection for U/G Pipeline 2007.10 ~ 2007.08 KOREA AIRTECH

6 Cathodic Protection for HPPO Project 2007.10 ~ 2008.01 SKC

7 Cathodic Protection for Local high-tech 2007.06 ~ 2008.01 CHARMVIT CHUNG-BUK CITY GAS

8 Cathodic Protection System 2007.06 ~ 2008.03 SK, HYUNDAI E&C

9 Cathodic Protection of U/G Pipe between SDG and SKC 2007.05 ~ 2007.10 SDG

10 Cathodic Protection for Intake Tower 2007.05 ~ 2007.07 K-WATER

11 Cathodic Protection for Methans Gas Introduction (PO22175) 2007.05 ~ 2007.07 SAMSUNG BPCHEMICAL

Page 50: Pre-Qualification for Company

Pre-Qualification for Company49 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 200710. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for BORYEONG #7,8 2007.05 ~ 2008.12 KOMIPO KEPCO

13 Inspection of Cathodic Protection System in All Site 2007.05 ~ 2008.02 YNCC

14 Cathodic Protection in JECHEON 2007.04 ~ 2007.05 CHUNGJU CITY GAS

15 Cathodic Protection system 2007.04 ~ 2007.05 DAEWOO S&M

16 Cathodic Protection for Steel Pipe 2007.04 ~ 2007.05 SAMCHEONPO SUHYUP

17 Cathodic Protection for U/G Pipeline 2007.04 ~ 2008.03 SK E&S

18 Manufacturing and Installation of Cathodic Protection Rectifier for POSCO CONDENSER 2007.03 ~ 2007.06 HANDONG

INDUSTRY

19 Relocation of Cathodic Protection for Oil Pipe 2007.02 ~ 2007.02 TAEYOUNG INDUSTRY

20 Cathodic Protection of U/G Oil Pipeline 2007.02 ~ 2007.11 TAEYOUNG HOLIZEN KOREA TERMINAL

21 Maintenance of Cathodic Protection for Condenser #5,6 2007.02 ~ 2007.05 EWPULSAN Plant KEPCO

22 Delivery for Cathodic Protection System 2007.02 ~ 2007.03 SK E&S

Page 51: Pre-Qualification for Company

Pre-Qualification for Company50 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 200710. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Inspection of Cathodic Protection Facilities 2007.01 ~ 2007.12 HANHWAPETROCHEMICAL

24 Cathodic Protection of U/G Pipeline 2007.01 ~ 2007.09 CHARMVIT WONJOO CITY GASCITY GAS

25 Cathodic protection among N a quay building and appurtenant work the third (Engineering Works) 2007.01 ~ 2008.03 DAEWOO S&M

26 Cathodic Protection for HADONG #7, #8 Plant(EPC) (500MW x 2PACKAGE) 2007.01 ~ 2008.10 KOSPO

SAMSUNG C&T KEPCO(500MW x 2PACKAGE) SAMSUNG C&T

27 Cathodic Protection LP ETHYLENE TANK 2007.01 ~ 2007.05 LG CHEMICAL

28 NEW FCC PJT Cathodic Protection System 2007.01 ~ 2008.03 SK E&C

Page 52: Pre-Qualification for Company

Pre-Qualification for Company51 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2006 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Cathodic Protection for Industrial Water PipeKWANGYANG Step 3 2006.12 ~ 2008.12 K-WATER

2 Maintenance of Cathodic Protection 2ND Complex 2006.11 ~ 2006.11 EWPULSAN Plant KEPCOULSAN Plant

3 Coating Maintenance of U/G Pipe and Installation the Test Box 2006.11 ~ 2006.12 HANHWAPETROCHEMICAL

4 Reinforcement of Cathodic Protection 2006.10 ~ 2006.10 DAESUNG INDUSTRIAL GASINDUSTRIAL GAS

5 Maintenance of Cathodic Protection Industrial Water Pipe 2006.10 ~ 2006.12 K-WATER

6 Cathodic Protection System of Civil Gas 2006.09 ~ 2006.12 SK E&S

7 Regular Inspection of OXO 2006.09 ~ 2006.11 LG CHEMICAL

8 JUNGHEUNG Port Cathodic Protection 2006.09 ~ 2007.01 HONAM PETROCHEMICAL

9 Cathodic Protection and Inspection Service of U/G Pipe 2006.09 ~ 2006.12 TONGSUH PETROCHEMICAL

10 Cathodic Protection Maintenance of Pipe in GIM-CHEON 2006.09 ~ 2006.10 K-WATER

11 Complementary Work of Cathodic Protection 2006.09 ~ 2006.10 KNOC

Page 53: Pre-Qualification for Company

Pre-Qualification for Company52 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2006 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Inspection Service and Maintenance of Cathodic Protection Facilities 2006.07 ~ 2006.12 KOREA

EXPRESSWAY CORP.

13 Installation External Power Supply of AYANG Bridge and Anode of HAJOO Bridge 2006.07 ~ 2006.08 DAEGU CITY GAS Anode of HAJOO Bridge

14 Maintenance of Cathodic Protection Steam Turbine Condenser 2006.07 ~ 2006.10 KP CHEMICAL

15 Inspection of Cathodic Protection System in All Site 2006.07 ~ 2006.12 YNCC

16 Cathodic Protection for #600 Zone 2006.06 ~ 2006.06 TAEYOUNG INDUSTRY

17 Maintenance of Sea Water Electrolysis Facilities Cell Box 2006.05 ~ 2006.06 EWPULSAN Plant KEPCO

18 Cathodic Protection of OS Tank Expansion 2006.04 ~ 2006.10 LOTTE E&C

19 Cathodic Protection System 2006.04 ~ 2007.04 CHANBIT YUNGDONG GAS

20 Cathodic Protection System 2006.04 ~ 2007.04 CHANBIT WONJOOGAS

21 Cathodic Protection System 2006.04 ~ 2007.04 CHANBIT CHUNGBUKGAS

22 Maintenance of U/G Pipe Cathodic Protection Facilities in All Work Site and Outside 2006.04 ~ 2006.11 YNCC

Page 54: Pre-Qualification for Company

Pre-Qualification for Company53 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2006 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Replace Anode in Fuel Storage(B21,B25 Tank) 2006.04 ~ 2006.04 EWPULSAN Plant KEPCO

24 Maintenance of Condenser #4, Cathodic Protection Facilities 2006.04 ~ 2006.05 EWPULSAN Plant KEPCOULSAN Plant

25 Cathodic Protection for Recovery of Sea Water Intake to Typhoon No. 14 “NABI” 2006.03 ~ 2006.04 DAEJIN E&C

26 Inspection Service of Cathodic Protection Facilities 2006.03 ~ 2006.12 KOREA EXPRESSWAY CORP.EXPRESSWAY CORP.

27 Cathodic Protection of check and maintenance 2006.03 ~ 2006.12 DEOKYANG ENERGEN

28 Cathodic Protection for KPTG ISO BUTANE 3“ Pipe 2006.02 ~ 2006.03 KOREA PTG

29 Reinforcement of External U/G Pipe in KP Chemical M-X8 2006.02 ~ 2006.04 JINSAN C&C

30 Cathodic Protection System in ULSAN~CHEONAN 2006.01 ~ 2006.01 HANYANG ENG

31 Inspection of Cathodic Protection Facilities 2006.01 ~ 2006.12 HANHWAPETROCHEMICAL

32 Maintenance of U/G Pipe Sacrifice Anode 2006.01 ~ 2006.02 ISU CHEMICAL

33 Cathodic Protection for U/G Oil Pipe on TAEKWANG Site 2006.01 ~ 2006.01 TAEYOUNG INDUSTRY

Page 55: Pre-Qualification for Company

Pre-Qualification for Company54 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2005 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

1 Installation Ref. Electrode for Fuel Oil Storage Tank(B21~B26) 2005.12 ~ 2005.12 EWPULSAN Plant KEPCO

2 Installation External Power Supply in Jinryang Industrial Complex 2005.11 ~ 2005.12 DAEGU CITY GAS Complex

3 Measurement Required Current 2005.10 ~ 2005.10 K-WATER

4 The 2ND Half Inspection of 3AA Team 2005.10 ~ 2005.10 LG CHEMICAL

5 Relocation of Lighthouse Construction in ULSAN Harbor 2ND Quay 2005.09 ~ 2005.11 ULSAN MARITIME

AFFAIRS &PORT

6 Measurement Potential of U/G Pipe in Total Site 2005.08 ~ 2005.09 YNCC

7 Relocation Cathodic Protection Rectifier Panel of Storage Tank 2005.08 ~ 2005.08 KP CHEMICAL

8 Relocation Cathodic Protection Rectifier Panel of Storage Tank 2005.08 ~ 2005.11 KOREA BASF, ULSAN

9 Regular Inspection of U/G Oil Pipe Line 2005.07 ~ 2005.11 JUNGIL STOLT HEAVEN ULSAN

10 Cathodic Protection for PIPE RACK 2005.07 ~ 2005.08 SAMSUNG MOTORS

11 Cathodic Protection for TK-3001, 3003 Tank Bottom 2005.07 ~ 2005.07 SAMSUNG C&T

Page 56: Pre-Qualification for Company

Pre-Qualification for Company55 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2005 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 Cathodic Protection for T-701,704,705,706 Tank Bottom 2005.07 ~ 2005.08 TAEYOUNG INDUSTRY

13 Cathodic Protection for U/G Pipeline in Busan 2005.06 ~ 5005.09 MS ENG

14 Cathodic Protection for Wansan LPG Gas Station 2005.06 ~ 2005.06 E1

15 Inspection Service of Cathodic Protection Facilities (SK #2 BUOY) 2005.05 ~ 2005.06 SK E&C(SK #2 BUOY)

16 Cathodic Protection for U/G Pipeline 2005.05 ~ 2005.06 YUNCHANG PLANT

17 Cathodic Protection for U/G Pipeline 2005.05 ~ 2005.10 HANHWA S&C

18 Inspection & repair work of Cathodic Protection Facilities 2005.05 ~ 2005.10 TONGSUHPETROCHEMICAL

19 Inspection & repair work of Cathodic Protection Facilities at Plant No.1 2005.05 ~ 2005.05 KP CHEMICAL

20 Inspection & repair work of Cathodic Protection Facilities 2005.04 ~ 2005.06 KOREA BASFULSAN

21 Cathodic Protection of External Self Storage Tank and Plant 1 2005.04 ~ 2005.06 KP CHEMICAL

22 Cathodic Protection for U/G Pipeline 2005.04 ~ 2005.04 WATERWORK,ULSAN

Page 57: Pre-Qualification for Company

Pre-Qualification for Company56 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

DomesticsDomestics - 2005 10. Business Experience Lists10. Business Experience Lists

O OJ C O C

23 Cathodic Protection for LPG Tank 2005.04 ~ 2005.11 DAEKYUNG M&I

24 Cathodic Protection for Waterline in SAMSAN District 2005.04 ~ 2009.12 HANJIN HEAVY INDUSTRIESINDUSTRIES

25 Cathodic Protection Inspection Service of NAKDONG River Bridge 2005.03 ~ 2005.12 KOREA

EXPRESSWAY CORP.

26 Inspection Service of Cathodic Protection Facilities 2005.03 ~ 2005.12 KOREA EXPRESSWAY CORP.EXPRESSWAY CORP.

27 Cathodic Protection for Cold Storage Foundation Pile 2005.02 ~ 2005.03 HAE-WON

28 Cathodic Protection of check and maintenance 2005.02 ~ 2005.12 DEOKYANG ENERGEN

29 Electric Work LPG Charging Stations in New Airport 2005.02 ~ 2005.05 YUNCHANG PLANT

30 Cathodic Protection System (ICCP) 2005.01 ~ 2005.05 KYUNGDONG CITY GAS

31 Cathodic Protection for LPG Charging Station's Tank 2005.01 ~ 2005.12 YUNCHANG PLANT

32 Cathodic Protection Survey of Underground P/L 2005.01 ~ 2005.12 SKC

Page 58: Pre-Qualification for Company

Pre-Qualification for Company57 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

10. Business Experience Lists10. Business Experience Lists Overseas 2007~2013Overseas 2007~2013

O OJ C O C

1 ASHUGANJ 225MW COMBINED CYCLE POWER PLANT 2013.08 ~ 2013.12 HYORIM INDUSTRIES Bangladesh

2 PRAI CCGT POWER PLANT PROJECT 2013.07 ~ 2014.05 BHI Malaysia

3 TRIPOLI WEST POWER PLANT PROJECT S/ CONDENSER(1000MW X 2PACKAGE) 2013.04 ~ 2014.01 BHI Libiya

4 ZWITINA CONBINED CYCLE ADD-ON PROJECT (250MW) 2013.04 ~ 2013.11 HYORIM INDUSTRIES Libiya

5 CAMPICHE 240MW CFPP PROJECT 2013.04 ~ 2013.05 BHI Chile

6 TRIPOLI WEST POWER PLANT PROJECT CCW HEATER(1000MW X 2 PACKAGE) 2013.04 ~ 2013.09 TSM TECH Libiya( )

7 ALGERIA CENTRALE CYCLE COMBINE A RAS-DJINET(500MW x 2 PACKAGE) 2013.04 ~ 2013.12 TSM TECH Algeria

8 Delivery Anode for Cathodic Protection System 2012.11 ~ 2012.12 SAMSUNG C&TTSM TECH UAE

9 [Fertil_2 Ammonia/Urea Expansion Project] Anode Protection for 5 Tanks 2011.12 ~ 2012.02 WIN-TECO Corp. UAE

10 Supply for MERAK CFPP (175MW) 2011.04 ~ 2011.06 ILSHIN Indonesia

11 Supply for AL-KHALIJ 4/350MW Power Plant Project 2009.10 ~ 2009.10 BHI Qatar

Page 59: Pre-Qualification for Company

Pre-Qualification for Company58 of 60

NO. PROJECT NAME PERIOD CLIENT REMARK

Overseas 2007~2013Overseas 2007~201310. Business Experience Lists10. Business Experience Lists

O OJ C O C

12 SIPCO 160MW Combined Cycle Co-Generation Project 2009.04 ~ 2009.08 TSM TECH Saudi Arabia

13 CAMPICHE 240MW CFPP PROJECT 2009.02 ~ 2009.04 BHI Chile

14 MA'ADEN AMMONIA Project, S/ CONDENSER(16 PACKAGE) 2008.11 ~ 2009.02 TSM TECH Saudi Arabia

15 Cathodic Protection for HHIC-PHIL SUBIC Project 2008.10 ~ 2008.12 HANJIN HEAVY INDUSTRIES PhilippinesINDUSTRIES

16 Cathodic Protection for L-PROJECT 2007.03 ~ 2008.05 SK CORP.PERTAMINA Indonesia

Page 60: Pre-Qualification for Company

Pre-Qualification for Company59 of 60

11. CLIENT11. CLIENT

Page 61: Pre-Qualification for Company

Pre-Qualification for Company60 of 60

11. 11. CLIENTCLIENT

Page 62: Pre-Qualification for Company

THANK YOU VERY MUCH FOR YOUR ATTENDANCEFOR YOUR ATTENDANCE

January. 2014TAEHEUNG CORROSION ENGINEERING