Research• throughout the research period we was analysing Opening

tittle sequences so that we could have a greater understanding of how they’re constructed and structured so that our group will be able re create this process. we set dates out starting on March 10th till the 13th so that we have enough knowledge to be able to do so. however throughout the entire process we will always be researching so that our OTS will be as effective and efficient as possible

• Each day we will be spending 2 hours just for researching so that we have enough background knowledge

Page 4: Pre Production Schedule

Planning

• for our planning we did some practice horror shots so that we can get used to a variety of shots so that when it comes to creating our OTS it will have a range of effective camera angles and shots. This was similar to our preliminary as we will be practicing a range of shots.

• Another step in our planning was creating a storyboard prior to filming so that it will be more time efficient and have a rough idea of what we want to shoot.

• We will carry out the same duration throughout the planning also