pre-feasibilty reportenvironmentclearance.nic.in/writereaddata/online/...district & state spsr...
TRANSCRIPT
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
EXECUTIVE SUMMARY
PRE-FEASIBILTY REPORT
(Towards Getting EC)
Under Violation
For
ROAD METAL MINING (6.00 Acres/ 2.42 Ha)
OF
M/s East Coast Minerals
ROAD METAL SY.NO. 87/P, Kundakur (V), Gudur (M), SPSR
Nellore District ANDHRA PRADESH
PREPARED BY
H.O: Block-B, B-1, IDA, Autonagar, Visakhapatnam – 530 012
Ph: 0891-2755528, Tel/Fax: 0891-2755529, E-mail: [email protected]
B.O: 2-53, Mahipala St., Yanam–533 464, Ph: 0884-2321528, Ph: 9440338628
QCI NABET Accredited & Recognized by MOE&F, New Delhi.
2017
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
1.0 INTRODUCTION
This Prefeasibility report is prepared for M/s East Coast Minerals who was granted
for Quarry lease of Road Metal over an extent of 2.42 Hectares/ 6.00 Acres in
Sy. No. 87/P of Kundakur Village, Gudur Mandal, SPSR Nellore District, Andhra
Pradesh.
1.2 SALIENT FEATURES OF THE PROJECT
The mine lease area falls under the Toposheet No. 57 N/11 bearing following
Topo sheet details: 57N/11
SI. No. Latitude Longitude
1 14°05'06.8"N 79°44'51.0"E
2 14°04'57.6"N 79°44'54.0"E
3 14°04'55.0"N 79°44'55.6"E
4 14°04'52.9"N 79°44'57.7"E
5 14°04'51.4"N 79°44'59.6"E
6 14°04'49.4"N 79°44'57.8"E
7 14°04'56.9"N 79°44'53.3"E
8 14°05'06.0"N 79°44'49.9"E
The Quarry lease area is well connected from Jayampu - Gudur Road and state
and private transportation is available from Venkatagiri – Gudur Road.
Details about Project Site
Nature of the project M/s East Coast Minerals,
Mining of Road Metals.
Size of the Project 10909 m3/Annum
LOCATION OF PROJECT
District & State SPSR Nellore District, Andhra Pradesh
Village & Mandal Kundakur Village, Gudur Mandal
Land Availability 2.42 Ha / 6.00 Acres.
Nearest Village Kundakur village at a distance of 1.34 Kms
Ownership Government Waste land
Toposheet No. 57 N / 11
GENERAL CLIMATIC CONDITIONS
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
Annual rainfall 700 to 800 mm
Min and max temp. 20 C and 38 C
Avg. relative humidity 75%
Predominant wind direction SW & NE
HISTORICAL / IMPORTANT PLACES
Nearest human settlement Kundakur village at a distance of 1.34 Kms
Nearest town Gudur at a distance of 12.73 Kms
Nearest railway station Kondagunta Railway station at a distance of
4.87 kms,
Vendodu Railway Station at 6.83 kms
Gudur Railway station at 12.77 Kms.
Archaeological /Historically
Important Site
None within 10 km radius of the site
Sensitive Places None within 10 km radius of the site
Sanctuaries / National parks None within 10 km radius of the site.
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of project and project proponent. In case of mining project, a copy
of mining lease/letter of intent should be given.
Details of Project Proponent:
M/s East Coast Minerals who was granted for Quarry lease of Road Metal over an
extent of 2.42 Hectares/ 6.00 Acres in Sy. No. 87/P of Kunadkur Village, Gudur
Mandal, SPSR Nellore District, Andhra Pradesh.
Table 1.1: Description of Project Proponent
Address of the lessee Address of Mine
M/s East Coast Minerals, Mg. partner : Sri B. Subba Reddy, D. No. 25-2-423, New Military Colony, A.K. Nagar, Podalakur Road, SPSR Nellore District, Andhra Pradesh
Sy .No. 87/P, Kundakur Village, Gudur Mandal, SPSR Nellore District, Andhra Pradesh.
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
2.2 Brief Description of nature of the project
M/s East Coast Minerals represented by its Mg. Partner Sri K. Srinadh Reddy has
applied for first renewal of Quary leae for Road Metal, over an extent of 6.00 Acres in
Sy. No. 87/P of Kundakur Village, Gudur Mandal, SPSR Nellore District for a period
of 15 years.
The renewal application of M/s East Coast Minerals was processed by ADM&G,
Nellore, A.P., and recommended grant of Quarry lease over an extent of 6.00 Acres in
Sy. No 87/P of Kundakur Village, Gudur mandal, SPSR Nellore District, A.P.
The DDM&G, Guntur based on the recommendation from ADM&G, Nellore was
sanction Quarry lease to M/s East Coast Minerals for Road in an area of 6.00 Acres
covered in S.No. 87/P of Kundakur Village, Gudur Mandal, SPSR Nellore District,
A.P. fopr a period of 15 years w.e. from 27.07.2011 to 25.04.2026 vide their
proceeding 2501/Q5/2011, dated : 26-06-2012 by the DDM&G, Guntur(Annexure-II).
Mining plan was approved by ZJDM&G, DDM&G, Guntur, Quary leae for Road
Metal, over an extent of 6.00 Acres in Sy. No. 87/P of Kundakur Village, Gudur
Mandal, SPSR Nellore District for a period of 4 years from 2017-18 to 2020-21 vide
letter No 4617/MP/RM/NLR/2017, dated: 03.10.2017.
The quarry is operating since 2012 without EC. As per notification S.O. 804(E)
14.03.2017, it comes under Violation. In this connection proponent proposes to apply
Form-1 and PFR for obtaining ToR for EC under violation case for their Road metal
Quarry of 2.42 ha/ 6.00 Acres.
Need for the project and its importance to the country and or region.
In the present scenario, the Road Metal has good market in the country for export for
construction of buildings, roads, dams etc. The available of 100% of Road Metal is
useful. There won’t be any wastage.
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
2.3 Demand-supply Gap.
There is a demand of Road Metal and is ever growing with the growth of construction
sector in the country. The requirement of the mineral is always found high in
adjoining areas.
2.4 Domestic/ Export Markets
100% of the excavated road metal will be supplied to consumers for roads laying,
earth filling, infrastructure works etc.
2.5 Employment generation (Direct and Indirect due to the project)
The proposed project will generate direct employment to 09 people of the poorest
section of the society, while benefitting more people indirectly.
3.0 PROJECT DESCRIPTION
3.1 Type of project including interlinked and interdependent projects, if any
The proposed mine located Sy. No. 87/P of Kundakur Village, Gudur Mandal, SPSR
Nellore District, Andhra Pradesh. And mining of Road Metals is opencast semi
mechanized method and is transported through vehicles.
3.2 Location
The mining area is located in Sy. No. 87/P of Kundakur Village, Gudur Mandal,
SPSR Nellore District, Andhra Pradesh.
The mine lease area falls under the Toposheet No. 57 N / 11
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
GOOGLE MAP AROUND 10 KM RADIUS
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
TOPO MAP
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
3.3 Details of alternate sites considered
The mineral is site specific, hence there are no alternative sites considered. Mining
activities are carried out based on local geology and availability of the mineral.
Reserves:
Classification Code Quantity in Cum
A. Mineral Reserve
(1) Proved Mineral Reserve 111 109816
(2) Probable Mineral Reserve 121+122 --
B. Remaining Resources
Feasibility Mineral Resources 211 2, 65, 120
Life of the Mine
= (Total of Mineable Proved, Probable & Possible)/ Avg. Annual Production.
= (109816) M3 / (10297) M3
= 10.66 years, say 11 years
3.4 Size or magnitude of operation
The proposed mine has lease over an area of 2.42 ha. The total extractable material
would be approx.10909 Cu .m/annum.
Year Saleable Road metal
@ 100% recovery
2017-18 10110
2018-19 10080
2019-20 10909
2020-21 10089
Grand Total 41188
Annual Average 10297
3.5 Project description with process details
The mining activity was carried out by semi mechanized open cast method with the 3
benches of each 5 m height and width of the bench will be more than bench height
with help of drilling and blasting in plan period. The dolerite is hard in nature the
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
blasting is required for its excavation. The blasting work will be allocated to
outsourcing agencies. The blasted material will be loaded in to dumpers of 20t
capacity by excavator (TATA Hitachgi – 250 LC). The loaded ROM will be
transported to the crusher, located in outside of the quarry lease area within 100 mtrs
distance on southern side in private land.
LIST OF MACHIENRY:
Machinery Quantity Description
Excavator 1 TATA Hitachi-250Lc
Loader 1 3t capacity
Tippers/Dumpers 4 20t Capacity
Compressor 1 120cfm
Drill Machine 1 4” DTH Pneumatic Drill
Water Tanker 1 200 L capacity
3.6 Raw Material Required Along With Estimated Quantity, Likely Source,
Marketing Area of Final Product/S, Mode of Transport of Raw Material and
Finished Product
No raw material will be required in the proposed project.
3.7 Resource optimization/ recycling and reuse.
Generation of Sub-Grade or reject material and waste is nil. 100% of material will be
utilized including dust or soil.
3.8 Availability of water its source, energy/ power requirement and source
3.8.1 Water Requirement
Source of water: Tankers
S. No Description Fresh water Waste water Disposal
1
2
3
Domestic
Green belt
Dust suppression
1.0 KLD
2.0 KLD
2.0 KLD
0.8 KLD
--
--
Septic tank followed
by soak pit
Total 5.0 KLD 0.8 KLD
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/ disposal.
0.8 KLD of domestic waste water will be generated and disposed to septic tank
followed by soak pit and generation of sub grade or reject material and waste is nil.
3.9.1 Solid Waste Generation & its Disposal
100% of the produced Road Metal will be useful. Hence no needs of waste dump
management. The top soil will be preserved within the lease area for using reclamation
of the pit at the time of closure.
3.9.2 Liquid Effluent
0.8 KLD of domestic waste water will be generated and disposed to septic tank
followed by soak pit
4. SITE ANALYSIS
4.1 Connectivity
State transport / Bus services play from Jayampu – Gudur Road frequently.
Guntur-Chennai Highway-AH5 at 13.92 kms from mine site.
Nearest Railway Station
The nearest railway station is Kondagunta Railway station at a distance of 4.87 kms,
Vendodu Railway Station at 6.83 kms and Gudur Railway station at a distance of
12.77 Kms from the Site.
Nearest Seaport:
Nearest Seaport is Krishnapatnam port which is 42.56 km away from the site.
Nearest Highway:
National highway AH-5 at a distance of 13.77 kms from the mine site.
Nearest state Highway:
State Highway is at a distance of 3.10 kms from the mine site.
4.2 Land form, land use and land ownership:
During the ensuing scheme period an area of 2.42 ha mining will be done as per
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
approved mine plan. Measures will be taken for the reclamation only after the end of
mining scheme period.
4.3 Topography
The quarry lease area belongs to M/s East coast minerals and it is located on East side
of the existing quarry lease belongs to M/s Sunshine Stone Crusher. 0.90 ha of the
area is covered by old pit. The quarry lease area with topo relief of 15M. the lowest
counter is 100 M and highest counter is 110 M.
4.4 Existing land use pattern
The Road Metal Quarry Lease area is surrounded by Stone crushers and open lands.
4.5 Existing infrastructure
As it is the fresh mine, no infrastructure like office sheds are available at site. Well-
equipped first aid facilities with vehicle will be made available at office.
4.6 Top soil management
The top soil will be preserve within the lease area and the same will be used for roads,
filling ditches and reclamation whenever necessary .
4.7 Climatic data from secondary sources
CLIMATE & RAINFALL
The quarry lease area is situated in semi arid zone and also extreme weather, during
summer season the temperature 38oC and 200C in summer. The predominant rain fall
is 700-800 mm during June - September.
4.8 Social infrastructure available
Primary & Upper primary school education is available at Kundakur village. Higher
education is available at Gudur Towns. Registered medical practitioner is available at
Gudur Mandal & SPSR Nellore District.
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
5. PLANNING BRIEF
5.1 Planning concept (Type of industries, facilities, transportation etc) Town and
Country Planning/Development authority Classification.
The mining activity was carried out by semi mechanized open cast method with the 3
benches of each 5 m height and width of the bench will be more than bench height
with help of drilling and blasting in plan period. The dolerite is hard in nature the
blasting is required for its excavation. The blasting work will be allocated to
outsourcing agencies. The blasted material will be loaded in to dumpers of 20t
capacity by excavator (TATA Hitachgi – 250 LC). The loaded ROM will be
transported to the crusher, located in outside of the quarry lease area within 100 mtrs
distance on southern side in private land.
5.2 Assessment of Infrastructure Demand (Physical and Social)
Safety equipments, small rest shelter and first aid facilities will be made available for
the workers in the mine lease area.
5.3 Amenities/facilities
The following facilities will be extended by the mine management:
i. Direct and indirect Employment.
ii. Arrangement for safe and healthy working conditions.
iii. Provision of drinking water.
iv. Conducting medical camps for workers and nearby villagers at regular intervals.
6. PROPOSED INFRASTRUCTURE
6.1 Industrial area (Processing Area)
No mineral processing will be carried out in the mine lease area. After excavation, the
Road Metals will be dispatched as per orders.
6.2 Residential area (Non Processing Area)
The mine workers will be hired from nearby villages, so residential areas will not be
made.
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
6.3 Green belt
We are developing green belt around the mine lease area along 7.5 M wide safety
zone.
6.4 Connectivity
This area falls in south-east direction of Chennai – Guntur National Highway
AH-5.
6.5 Water Management
The mining operations will not generate any quantity of water as sewage. The
processes of mining also do not generate any water.
6.6 Sewage System
Domestic waste water generated will be treated in septic tank followed by soak pit.
6.7 Industrial Waste Management
Not applicable
6.8 Solid Waste management
100% of the produced Road Metal will be useful. Hence no need of waste dump
management. The top soil will be preserved within the lease area for using reclamation
of the pit at the time of closure.
6.9 Power Requirement & Supply/ Source
Electricity is available in all the nearby villages and in agricultural lands.
7 REHABILITATION AND RESETTLEMENT (R&R) PLAN
7.1 Policy to be adopted (Central/State) in respect of the project affected persons
including home oustees, land oustees and landless laborers (a brief outline to be
given)
The nearest Kundakur village at a distance of 1.34 Kms from the quarry lease
area.
Agriculture and sheep breeding are important profession of the people living in the
villages besides involving themselves in quarrying activity.
PROJECT: M/s East Coast Minerals Pre-Feasibility Report
8. PROJECT SCHEDULE & COST ESTIMATES
8.1 Likely date of start of construction and likely date of completion (Time schedule
for the project to be given)
The project will commence once Environmental Clearance and other necessary
certificates are obtained from the respective departments.
8.2 Estimated project cost along with analysis in terms of economic viability of the
project.
The Total cost of project would be around Rs. 10 Lakhs.
9. ANALYSIS OF PROPOSAL (Final recommendations)
9.1 The project will bring economical benefits to the state by the ways of royalty of
mineral. The mining operations shall be providing employment to approximately 16
people of the poorest section of the society.
The quarry lease area is surrounded by 5 villages within a distance of Kms.
Agriculture and sheep breeding are important professions of these people living in the
village besides involving themselves in quarrying activity. There is no adverse socio
economic impact on the persons in the villages, due to the quarrying operations. There
is a positive impact of the quarry operations on the socio economic standards of the
villagers. The persons from the villages are being given employment in the quarry
suiting to their education level and experience. The management is also participating
actively in the “Corporate Responsibility” schemes by grouping with other quarry
managements or individually, depending on the merits of the service.
Production Details:
The quarry is operating since 2012 and dispatch details are as follows.
Year Production in Cum
2012-13 19550
2013-14 44540
2014-15 66064
2015-16 30000
2016-17 16620
Total 176774
Ref: Approved Mining Plan, Letter No: 4617/MP/RM/NLR/2017 dated: 03.10.2017.