Pre-Feasibility Study onThe Bosphorus Road Tunnel Crossing
NIPPON CIVIC ENGINEERING CONSULTANT CO., LTD.
Ministry of TransportThe Republic of Turkey
Traffic Volume Crossing the Bosphorus
350,000 vehicles/day
Contents of Pre-F/S
Preliminary Engineering
Economic & Traffic Study
Viability of the Project
①
②
③
④
⑤
: Selected Route
: Compared Route
: Railway Crossing
RouteSelection
Characteristics of the Route ④
Least costly because of the shortest tunnel length of the five alternatives.
Cost
Preferable because of no building exists around vertical shafts.
Constructionability
The route is avoiding historic heritages in the European Side (passing the outside of the historic castle wall).
Environment
The land around both tunnel entrances are mainly government’s property.
Land Use
The best location (distance from the existing 2 bridges) will ease traffic congestions of the crossing vehicles.
RemarksTraffic Operation
Item
Tunnel Sections
the Bosphorus Crossing A86 Paris
InspectionGallery
Size of Vehicle in the Tunnel
Mini Bus(Dölmuş )
Small Bus
Mini Bus Small Bus
Size of Tank & Tunnel Section
[SIZE]Total Length:10.93 mBody Length :7.722 mWidth : 3.74 mHeight : 2.64 mWeight : 60.2 t
◆ Leopard 2 A6
Plan & ProfileAccess to “ANKARA ISTANBUL DEVLET YOLU”and “TIBBIYE Cad.”Toll GatesAccess to
“KENNEDY Cad.”
Reservation from the deepest point
Ventilation Shaft
Shield Tunnel:2.7 km NATM+Open:1.8 km
Project Total:5.8 km
NATM+Open:1.3 km
SubmarinePassage
ROCK ROCKSOIL
WATER
Bird’s-eye View
Ramp Section
Section 1
Section 1
Section 2
Section 2
Section 3
Section 3
Section 4
Section 4
Aseimic System
Behavior of Flexible Tunnel Tube during the Earthquake
Flexible Segment
Seismic Joint
Segment
Rock
Soil
Flexible SegmentSegment Joint
Segment
SegmentRing Joint
Tunnel Tube
Seismic Joint Segment
Ventilation System
To Europe
To Anatolia
Drainage System
Fire Protection
Every 200 meter
InspectionGallery
EmergencyStaircase
Emergency Evacuation System
InspectionGallery
Construction Period4 + α
Commissioning
EquipmentInstallation
AnatoliaLand Sect.
UnderseaSection
EuropeLand Sect.
Tendering
5 + αα 3 + α2 +α1
F/S & Bid Doc.
Year
Construction & Operation Cost
¥ 39,540 Mil.Total Construction Cost¥ 15,380 Mil.Equipment¥ 24,160 Mil.Total Tunnel Construction Cost ¥ 5,528 Mil.Anatolia Land Tunneling¥ 16,750 Mil.Undersea Tunneling¥ 1,882 Mil.
CostEurope Land Tunneling
Item (Construction)
¥ 2,400 Mil.Labor Cost / 50-year
¥ 350 Mil./year¥ 17,200 Mil.¥ 4,400 Mil.¥ 10,400 Mil.
Cost
Operation & Maintenance Cost / yearOperation & Maintenance Cost / 50-year
Electricity / 50-yearMaintenance / 50-year
Item (Operation & Maintenance)
¥1,500 MilEngineering Cost
¥ 2,160 Mil. / 50-years (¥ 433 Mil. / 1 year)
¥ 1,720 Mil. / 50-years(¥ 350 Mil. / 1 year)Maintenance Cost
¥ 39,540 Mil.2 lanes
¥ 51,400 Mil.3 lanes
Construction Cost
Comparison of 2-Lanes & 3-Lanes2-lanes 3-lanes
Forecast Peak Hour Traffic Volume
Unit: PCU/hours
15,444 12,192 13,438 10,601 Total 5,293 4,068 4,767 3,664 Traffic Europe - Asia
10,151 8,124 8,671 6,937 Traffic Asia - Europe2030201020302010Year
3 X 32 X 2Number of Lanes
Forecast Road Traffic DemandAcross the Bosphorus (Peak Hour)
Unit: PCU/hour
1.018 1.424 55,865 39,226 Total1.012 1.267 15,444 12,192 Highway Tunnel1.024 1.621 21,600 13,321 Bosphorus 21.016 1.372 18,821 13,713 Bosphorus 1
Growth Rate(B)/(A)2030 (B)2010 (A)
By Istanbul Transport Master Plan Model
Economic EvaluationUnit: 100 million Yen
0.2830 455.784.4371.3Case 2(3 x 3)
0.3293419.380.5338.8Case 1 (2 x 2)
IRRTotal Benefit
Time Cost Saving Benefit (TCS)
VOC Saving Benefit (VOCS)
Financial Evaluation
Unit: 100 million Yen
0.2147 166.5Case 2 (3 x 3)
0.2314148.8Case 1 (2 x 2)
FIRRToll Revenues
Conclusion
Economically Viable
Financially Marginal
Detailed F/S Required
The End
NIPPON CIVIC ENGINEERING CONSULTANT CO., LTD.
Thank you very much for your cooperation.