PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE CAPACITY Steel Billets/Ingots- 25,200TPA to 1, 72,800TPA Rounds, TMT Bars, wire rode, Flats- 1, 50,000TPA By M/S SHARU SPECIAL ALLOYS (P) LIMITED VILLAGE- GOBINDGARH, ADJOINING PHASE-VII, FOCAL POINT, LUDHIANA, PUNJAB. PREPARED BY CHANDIGARH POLLUTION TESTING LABORATORY EIA-DIVISION (Sl. No.- 26 in list Accredited Consultants Rev.81, Oct.2019 ) Address: E- 126, Phase- VII, Industrial Area, Mohali, Punjab- 160055. Contacts: 0172-4669295, 5090312 E-mail: [email protected] / [email protected] Website: www.cptl.co.in CPTL-11-2019/R1

Upload: others

Post on 15-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

M/s SAECO STRIPS PVT. LTD. 1 CPTL-EIA

PRE-FEASIBILITY REPORT

FOR

EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE

CAPACITY

Steel Billets/Ingots- 25,200TPA to 1, 72,800TPA

Rounds, TMT Bars, wire rode, Flats- 1, 50,000TPA

By

M/S SHARU SPECIAL ALLOYS (P) LIMITED VILLAGE- GOBINDGARH, ADJOINING PHASE-VII,

FOCAL POINT, LUDHIANA, PUNJAB.

PREPARED BY CHANDIGARH POLLUTION TESTING LABORATORY

EIA-DIVISION (Sl. No.- 26 in list Accredited Consultants Rev.81, Oct.2019 ) Address: E- 126, Phase- VII, Industrial Area, Mohali, Punjab- 160055.

Contacts: 0172-4669295, 5090312 E-mail: [email protected] / [email protected]

Website: www.cptl.co.in

CPTL-11-2019/R1

Page 2: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

1

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

INDEX

1.0 EXECUTIVE SUMMARY 1-4

2.0 INTRODUCTION OF PROJECT & PROPONENT 5-7

Introduction 5

Partner background 5

Brief Description 5

Need of the project 6

Employment Generation 7

3.0 PROJECT DESCRIPTION 8-18

Category of project 8

Location of Project 9

Alternate site selection 14

Size & magnitude of operation 14

Manufacturing Process details 14

Raw material & product details 17

Resources optimization 17

Sources of water 18

Quantity of waste generation 18

4.0 SITE ANALYSIS 20

5.0 DESCRIPTION OF THE ENVIRONMENT 21-26

6.0 ENVIRONMENT IMPACT & MANAGEMENT PLAN 27-30

7.0 PROPOSED INFRASTRUCTURE 31

8.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN 32

9.0 PROJECT SCHEDULE & COST ESTIMATES 32

10.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) 33

11.0 CSR 34

Page 3: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

2

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

LIST OF FIGURES:

1.0 Location of Project 2

3.1 Google Location Plan 10

3.2 Location map general 11

3.3 Layout plan 12

3.4 Location on master Plan 13

3.5 Flow Chart of Manufacturing Process 15

3.6 Material Balance 16

LIST OF TABLES:

1.1 Détails of area 3

3.1 Project détails 8

3.2 Project co-ordinates 9

3.3 Raw material & Product 17

5.1 Primary data Description 21

Page 4: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

1

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

PRE-FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

M/s SHARU SPECIAL ALLOYS (P) LIMITED

Village- Gobindgarh, Adjoining, Phase-VII, Focal Point, Ludhiana, Punjab.

Location Co-ordinates: Latitude : 30°52'17.53"-30°52'15.14"N,

30°52'15.37"-30°52'12.64"N,

Longitude : 75°56'27.74"-75°56'33.24"E,

75°56'26.41"-75°56'31.81"E,

Elevation : 256 m

Total project cost: - Rs 27.55 Crores (after addition of proposed machinery)

- The location of the project site is given in Figure 1.0 on map of India and other area details are

given in Table 1.1

Page 5: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

M/S SHAR

Locati

RU SPECIAL

ion of Punjab

Location of P

L ALLOYS (P

State at Polit

Project Site on

) LTD., LUDH

ical Map of In

n District Map

Fi

Location o

2

HIANA

ndia

p Lo

igure 1.0

of the Projec

P

Location of

ocation of Proj

ct Site

PRE-FEASIB

f District on Pu

ject Site on Go

BILITY REPO

CPTL-E

unjab Map

oogle Earth M

ORT

EIA

Map

Page 6: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

3

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

TABLE – 1.1 DETAILS OF THE AREA

S. No.

Particulars Details

A. Location details

1. Location

a Village/ Town/Plot No. Gobindgarh b Tehsil Ludhiana c District Ludhiana d State Punjab e Latitude 30°52'12.50"-30°52'15.14"N,

30°52'17.85"-30°52'15.00"N, f Longitude 75°56'32.33"-75°56'33.83"E,

75°56'27.70"-75°56'26.15"E, 2. Topo sheet No.

H43J13

3. Project Area Total Area –4. 5 acres or 1.821hectare or 18210 m2

C. Production Capacity Existing: 1) Steel Billets-25,200TPA 2) Forged Roll-3300TPA After Expansion: 1) Steel Billets-1,72,800TPA 2) Round,TMTBars&Flats-

1,50,000TPA 3) Forged Roll- 3300TPA

D. Environmental settings

1. Nearest Village Project exists in Industrial Focal Point.

2. Nearest City Ludhiana, approx. 7 km in NW direction from the project site

3. National Highway/State Highway/ Express Highway

NH-95 Kharar-Ludhiana is approx 1.0 km in North direction from the project site.

4. Nearest Railway Station Dhandari Kalan, approx. 3.5 km in west direction from the project site

Page 7: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

4

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

5. Nearest Airport Chandigarh Airport approx. 85 km in east direction from the project site.

6. National Parks/ Wild Life Sanctuaries/ Biosphere Reserves within 10 km radius

Nil

7. Reserved / Protected Forest within 10 km radius (Boundary to boundary distance)

No Reserved Forests exists within 10 km radius.

8. Nearest water bodies Sirhind Kanal about 11.0 km

9. Source of Water Ground water Existing tube-well

10. Seismic Zone Seismic Zone – IV

D. COST DETAILS

1. Capital Cost of the project Existing -Rs 03.75 Cr Proposed -Rs 23.80 Cr Total -Rs 27.55Cr

2. Total cost for Environmental Management Plan (EMP)

Rs 110.0 Lacs

Page 8: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

5

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

2.0 INTRODUCTION OF THE PROJECT AND PROPONENT M/s Sharu Special Alloys Pvt. Ltd. is already manufacturing Steel Ingot & forged roll at

Village- Gobindgarh, adjoining Phase-VII, Focal Point Ludhiana, Punjab. It is proposed to

enhance the capacity of unit by replacing the existing furnace of 6 TPH with two no Induction

furnaces of 20TPH capacities each, Concast and a rolling mill. It is also proposed to make

structural steels i.e. Round, MS Bars, TMT Bars, wire rod & Flats. The total project cost of the

unit after expansion will be Rs 27.55 Crores. The projects have already 4.5 acres land. No

additional land is required for expansion. The capacity of the unit after expansion will be 1,

72,800 TPA steel Billets/Ingots, 3300TPA forged roll & 1, 50,000 TPA Round, TMT bars,

wire rod, steel bars, channels and flats.

As per G.O.I Notification dated 14/09/2006 any change in product/expansion required

Environmental Clearance. Accordingly it is mandatory to submit Form No- I along with Pre-

Feasibility Report and other relevant documents for getting Environmental Clearance. Further,

the project site falls within the “critically polluted areas” Ludhiana as notified by the Central

Pollution Control Board, categorizing the project as Category ‘A’ and the environmental

clearance accorded by the Central Govt. in the MoEF&CC New Delhi. This Prefeasibility

report has, therefore, been prepared to assess the likely impact of the proposed expansion on

various factors which may be affected with the implementation of the programme and to

suggest remedial / precautionary measures, if any.

I. Partner’s Background: M/s Sharu Special Alloys (Pvt.) Ltd is a Private Limited Company. The Directors of the

company are as under:

1. Mr. Naresh Kumar Jain

2. Mr. Gaurav Jain

II. Brief description of nature of the project.

In view of the tremendous market potential of Iron & steel, promoters have decided to expand

the capacity of the existing Steel Plant by replacing the existing furnace 6 TPH with two no

Induction furnaces of 20TPH capacities each, Concast and rolling mill. Addition in the existing

Page 9: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

6

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

plant would improve the overall profitability of the project making it financially more viable.

The production details of unit existing & proposed are as under:

Product Name Existing (TPA) Proposed (TPA) Total (TPA)

Alloy/ Non Alloys Steel

Billets/Ingots

25,200 1,47,600 1,72,800

Structural Steel (TMT bars & flats,

MS bars, wire road)

NIL 1,50,000 1,50,000

Forged roll 3300 Nil 3300

III. Need for the project and its importance to the country and or region.

India is the world’s third-largest steel producer in 2016. The growth in the Indian steel sector

has been driven by domestic availability of raw materials such as iron ore and cost-effective

labor. Consequently, the steel sector has been a major contributor to India’s manufacturing

output. India’s crude steel output grew 10.7 per cent year-on-year to 25.76 million tons (MT)

during January-March 2017. India’s crude steel output during April 2017 grew by 5.4 per cent

year-on-year to 8.107 MT. India’s finished steel exports rose 102.1 per cent to 8.24 MT, while

imports fell by 36.6 per cent to 7.42 MT in 2016-17. India’s steel exports rose 142 per cent in

April 2017 to 747,000 tons over April 2016, while imports fell by 23 per cent to 504,000 tons

in April 2017 over April 2016. Total consumption of finished steel grew by 3.4 per cent year-

on-year at 6.015 MT during April 2017 (Source: Indian Brand Equity Foundation).

For a developing country like India, Iron & Steel Industry has a pivotal role to play as a pre-

requisite for industrial, construction and infrastructural development. As per report of World

Steel Association (WSI), India has surpassed US and became third largest producer of Steel.

The region will be benefited by:

Economic up-liftment of suppressed class

Bridging demand –supply gap

Infrastructural development of the area

Employment to locals

Revenue to state exchequer

Page 10: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

7

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

IV. Employment Generation (Direct and Indirect) due to the project.

Direct employment: - for expansion additional 400 Persons will be required. Total Number of

manpower after expansion will be 450 No’s.

Page 11: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

8

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

3.0 PROJECT DESCRIPTION:

I. Category & type of project including interlinked and interdependent projects, if any.

It is originally Category ‘B’ project. As situated within critically polluted area of Ludhiana, it

will be appraised as Category A, project under schedule 3(a) in EIA Notification, 2006.

Details of project is given in Table-3.1

TABLE-3.1

S.

No.

PARTICULARS

EXISTING

PROPOSED

TOTAL

A EXISTING & PROPOSED CAPACITY OF FURNACES & ROLLING MILLS

1 Induction Furnace 6TPH (To be Replaced) & Concast

Two N. IF 20 TPH each & Concast

2 Rolling Mills Nil

1 Rolling Mill

1 Rolling Mills

B PRODUCTS 1 Steel Ingot/Billets

(TPA) 25,200 1,47,600 1,72,800

2 MS Bars, Round, Flats, TMT Bars, wire rod (TPA)

Nil 1,50,000 1,50,000

3 Forged Roll (TPA) 3300 Nil 3300

C RAW MATERIAL

1 MS Scrap (TPA) 27,900 1,62,000 1,89,900

2 Ferro-alloys(TPA) 297 1683 1980

D GENERALS

1 Project Cost (Crores) Rs 3.75 Rs 23.8 Rs 27.55

2 Land (Acres) 4.5 NIL 4.5

3 Power (KW) 2495 18505 21000

4 Manpower (No’s) 50 400 450

5 Working days 24 hrs 360 working days in year

Page 12: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

9

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

II. Location (map showing general location- Figure-3.1, specific location- Figure-3.2, and

project boundary & project site layout- Figure-3.3) with coordinates.

LOCATION: The proposed project site is located at Village Gobindgarh, Near Phase-VII, Focal Point,

Ludhiana Distt. Ludhiana (Punjab). The coordinate of project site is given in Table 3.2. The

general location plan of project is given Figure-3.1 & on goggle 3.2. The layout plan of the

project showing different activity is given in Figure 3.3.

Table-3.2

LATITUDE 30°52'12.50"-30°52'15.14"N, 30°52'17.85"-30°52'15.00"N,

LONGITUDE 75°56'32.33"-75°56'33.83"E, 75°56'27.70"-75°56'26.15"E,

Page 13: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

10

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure-3.1 Google Location map

LUDHIANA

KHARAR

NH-95

Page 14: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

11

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure-3.2 Location map General

KHARAR

LUDHIANA

SAMRALA

NH-95

PROJECT SITE

Location plan - NTS

Page 15: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

12

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure-3.3 Layout Plan

Page 16: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

13

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure-3.4

Location on Master Plan

Page 17: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

14

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

III. Alternate sites considered and the basis of selecting the proposed site, particularly the

environmental considerations gone into should be highlighted.

Addition will be done within existing premises. So, consideration of alternate site is not applicable.

IV. Size or magnitude of operation.

Existing plant is having Induction furnace of 6 TPH capacities and forging plant. Now, it is proposed

to enhance the capacity of plant by replacing existing furnace with two no. new furnaces having

capacity 20TPH each, a Concast and a rolling mill. After expansion the production details will be as

under:

Product Name Existing (TPA) Proposed (TPA) Total (TPA)

Alloy/ Non Alloys Steel

Billets/Ingots

25,200 1,47,600 1,72,800

Structural Steel (TMT bars & flats,

MS bars, wire road)

NIL 1,50,000 1,50,000

Forged roll 3300 Nil 3300

V. Manufacturing Process details (a schematic diagram flow chart showing the project layout,

components of the project etc. should be given)

The industry produces ingots from melting MS Scrap. All operations are carried out in batch process.

The brief description is as follows:

MS Scrap is put into the induction furnaces pot through magnetic conveying system, where it is

heated to 1800oC. Scrap is melted and is heated for about 100 minutes. In the molten steel some Ferro

Alloys are added according to the carbon contents in the scrap. The molten metal is then fed to

Concast Machine/Billet Castor form where the material is taken to rolling mill. The process flow chart

of manufacturing process is given Figure 3.5 & the material balance is given in Figure 3.6.

Page 18: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

15

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure-3.5

Flow Chart of Manufacturing Process

RAW MATERIAL

INDUCTION FURNACE

CONCAST MACHINE

INGOTS/ BILLETS

ROLLING/ FINAL PRODUCT

COOLING TOWER

SIDE SUCTION HOOD

A P C D (BAG FILTER)

APCD DUST

CLEAN AIR

FINAL DISPOSAL TSDF SITE/ DISPOSAL OFF TO METAL RECOVERERS

Stack

21000 KW POWER

MAKE UP WATER

SLAG

METAL RECOVERY PLANT

WASTE SENT TO VENDOR FOR DISPOSAL

FUGITIVE EMISSION

Page 19: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

16

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure 3.6 MATERIAL BALANCE

Raw Material

Scrap + Ferro Alloys

(533TPD)

Melting & Refining Process

(IF) (533 TPD)

CCM

(496.0 TPD)

Final product

(480 TPD)

Runner/Riser

(16.0 TPD)

Slag

(26 TPD)

APCD Dust

(1.0 TPD)

Burning Loss

(10.0 TPD)

Given to manufacturer of cement concrete block, paver & tiles.

Sent To TSDF Site / Madhav

Alloys for Final Disposal

Recovery of Iron

Page 20: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

17

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

VI. Raw material required along with estimated quantity, likely source, marketing area of final

products, Mode of transport of raw Material and Finished Product.

The details of product quantity and source of raw material required are given in the Table 3.3.

TABLE-3.3

PRODUCTS EXISTING ADDITION TOTAL 1 Steel Billets/Ingot

(TPA) 25,200 1,47,600 1,72,800

2 MS Bars, Round, Flats, TMT Bars, wire rod(TPA)

Nil 1,50,000 1,50,000

3 Forged Roll (TPA) 3300 Nil 3300

RAW MATERIAL

1 MS Scrap (TPA) 27,900 1,62,000 1,89,900

2 Ferro-alloys(TPA) 297 1683 1980

3 Source & Transport Local & International Markets & transport through

covered Trucks.

VII. Resource optimization/recycling and reuse envisaged in the project, if any, should be

briefly outlined.

Water: As this project is based on Zero Discharge, 100 % recycling of water will be done in the cooling

tower. No water is used in the manufacturing process.

Solid/ Hazardous waste:

The existing quantity of slag is 3TPD and is being used for filling low lying area. Total quantity of

slag after expansion will be 26 TPD and will be supplied to manufacturers of cement concrete blocks,

pavers & tiles under proper agreement. Hazardous waste generated (0.01kl/annum) from DG sets in

the form of used oil is being re-used as lubricants within the industry. About 1.0TPD APCD dust will

be covered under hazardous waste & sent to M/S Madhav Alloys (P) Limited for metal recovery or

TSDF site.

Page 21: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

18

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

VIII. Availability of water its source, Energy/power requirement and source should be given.

Water requirement is being/will be met through existing tube well. The detail of water requirement

existing & after expansion is given below:-

DESCRIPTION EXISTING PROPOSED TOTAL Domestic 2.5 KLD 20.0 KLD 22.5 KLD Cooling (makeup water) 2.5 KLD 18.0KLD 20.5 KLD Total 5.0KLD 38.0 KLD 43.0 KLD

Power requirement of existing & proposed along with source is given below:-

DESCRIPTION EXISTING PROPOSED TOTAL Power Requirement 2495KW 18505KW 21000KW Source Punjab State Power Corporation Limited, Punjab

IX. Quantity of wastes to be generated (liquid and solid) and scheme for their Management/

disposal.

Liquid effluents- Proposed project is based on ZERO discharge. There are no generation trade

effluents from process. The waste water generated from domestic & cooling tower will be treated

through STP and used for cooling purposes/plantation within premises.

Solid Waste - Slag will be disposed off to approved manufacturer of concrete blocks, pavers and tiles. Used oil

from DG sets is being used as lubricant/ will be sold to authorized recycler & dust from APCD sent to

M/S Madhav Alloys (P) Limited for metal recovery or TSDF site.

Flue Gas Management

The air pollution will be the result of the heating and melting process in the induction furnace. The

emissions (PM) coming out of the mouth of the furnace crucible need treatment before discharging it

into the atmosphere.

The gaseous emissions will comprise of vapours/fumes, suspended particles, and some gases. The

vapours are, primarily, of metals (iron) and metal oxides (in very low quantities). Dust and metal

particles also contribute to the suspended particulates. Gaseous pollutants are, mainly, carbon di-

oxide, carbon mono-oxide, and nitrogen oxides, though in very low amounts. The suspended

particulate matter (SPM) concentration will be about 1800-2000 mg/NM3. Most of the particulates

Page 22: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

19

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

(about 75%) are expected to have size in the range of 1-5 microns. The emissions (after dilution) will

have temperature of <150°C.

The PM level in the gas emission, at discharge point, shall be maintained below 50mg/NM3 by

adequate & appropriate APCS. Additionally, the stack height requirements for discharge of process

emissions will also be complied.

Page 23: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

20

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

4.0 SITE ANALYSIS

I. Connectivity:

NH-95 Kharar to Ludhiana is well connected with the project.(1.0KM)

Dhandari Kalan Railway Station (2.5 Km) The regional road network comprises of Kharar-Ludhiana G.T. Road (NH-95) and forms the

major spine. In fact the entire road network gravitates along this major spine. The project exists in

approved Industrial Focal point Ludhiana.

II. Land Form, Land use and Land ownership:

Industrial Land is registered in name of M/s Sharu Special Alloys (P) Limited. The land is already

in use for industrial purposes.

III. Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area

under CRZ), shortest distances from the periphery of the project to periphery of sanctuary, eco

from the HFL industrial area, be given.

It is situated in Industrial land for industrial purposes as per master plan of Ludhiana. There is no

sanctuary, river present within 10 km radius of the project.

IV. Existing Infrastructure:

The infrastructure amenities available in the area denote the economic wellbeing of the region. The

project area is connected with local road and NH-95 (Kharar – Ludhiana) & NH-44(Srinagar –

Kanyakumari). Educational facilities up to Senior School, College, Hospital & Banking facilities are

available at Ludhiana City about 7 km away from the project site.

V. Soil classification: The texture of soil is sandy loam.

VI. Social Infrastructure available.

Social infrastructure constitutes various facilities pertaining to education, health, recreational,

cultural and other public amenities/ facilities available in urban areas at various levels whose

availability and accessibility determines the quality of life of an urban centre.

Page 24: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

21

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

5.0 DESCRIPTION OF THE ENVIRONMENT

INTRODUCTION:

The main objectives of describing the environment, which may be potentially affected, are (i) to

assess present environmental quality and the environmental impacts and (ii) to identify

environmentally significant factors that could preclude project development.

This chapter contains information on existing environmental scenario for the following parameters.

1. Land Environment

2. Meteorology

3. Air Environment

4. Noise Environment

5. Water Environment

6. Soil Environment

7. Biological Environment

8. Socio-economic Environment

ENVIRONMENTAL BASELINE DATA COLLECTION:

Baseline data for the proposed plant will be collected as per TOR/MoEF&CC Guidelines. Primary

data will be collected by monitoring & surveying of various environmental components/ parameters

during the study period, details of which are given in Table - 5.1.

TABLE-5.1 PRIMARY DATA

S. NO. PARAMETERS DESCRIPTION 1 Meteorology Meteorological parameters on hourly basis at project site.

Parameters: Temperature, Relative humidity, Wind Speed & Wind

Direction.

2 Air Ambient air quality monitoring (24 hourly), twice a week.

Parameters are PM10, PM2.5, SO2, NO2 & CO.

No. of Locations: 8 locations in core and buffer zone.

3 Noise Noise level monitoring (Day & Night time), once in a season.

Page 25: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

22

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

No. of Locations: 8 locations in core and buffer zone.

4 Water Ground water sampling, once in a season.

No. of Locations: 8 locations in core and buffer zone.

Tested for physical and chemical parameters.

5 Soil Soil sampling, once in a season.

No. of Locations: 8 locations in core and buffer zone.

6 Biological Factors Biodiversity survey, once in a season.

Location: Core and buffer zone.

7 Socio-economic

Environment

Socio-economic survey, once in a season.

Location: Core and buffer zone.

5.1 Current Ambient Air Quality and its future:- For the existing project of M/s Sharu Special Alloys, we have carried out Ambient Air Quality

Sampling at Project Site. Test report is given at Annexure-V. Brief detail is as under:-

Date of Monitoring PM2.5

µg/m3

PM10

µg/m3

SO2

µg/m3

NOx

µg/m3

09.01.2018 56.2 105.4 11.2 32.1

To quantify the incremental affect of proposed project, we have carried out Air Quality Modeling by using AERMOD Cloud Version-5. Dispersion Modeling Results The 24 hourly average ground level concentration (GLC) values from proposed and current

project have been computed for PM10 considering topographical featured around the project and

applicable stability classes. The predicted 24 hourly short terms Maximum Incremental Concentration

values for PM10 from the proposed and current project are given in Table- 1 & 2. Corresponding

isopleths plotted are shown in Figure 1 & 2 for PM10. Modeling inputs are as below:-

Page 26: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

23

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Input for Proposed Project:-

I. Stack height = 30m

II. Stack diameter = 1.0m

III. Temperature of stack gas = (273+100°C) =373 K (Ts)

IV. Manometer H (mm) = 14.8 mm H20

V. Velocity of gases (v) = 14.53 m/s

Say, PM concentration = 50 mg/Nm3

VI. Emission rate = 0.46 g/s

Input for Running Project:-

I. Stack height = 30m

II. Stack diameter = 0.75 m

III. Temperature of stack gas = (273+90°C) =363 K (Ts)

IV. Manometer H (mm) = 11.8 mm H20

V. Velocity of gases (v) = 12.8 m/s

Say, PM concentration = 150 mg/Nm3

VI. Emission rate = 0.68 g/s

Table-1 Predicted Maximum Incremental Concentrations (Existing Project)

Avg. Period

RANK Conc, µg/m3

X, m Y, m ZELEV, m

Direction Distance, m

24 HR 2.69 589949.74 3415673.36 0.00 SSE [160°] 76.00

PERIOD 0 1.05 589794.19 3415818.84 0.00 WNW [300°]

150.00

Table-2 Predicted Maximum Incremental Concentrations (Proposed Project)

Avg. Period

RANK Conc, µg/m3

X, m Y, m ZELEV, m

Direction Distance, m

24 HR 1.12 589859.14 3415781.34 0.00 WNW [300°]

75.00

PERIOD 0 0.49 589794.19 3415818.84 0.00 WNW [300°]

150.00

Page 27: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

24

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Predicted GLC’s of current and proposed project

It is predicted that the maximum contribution in GLC’s with units operation is 2.69µg/m3 for

PM10 at 76 m distance for existing project and 1.12µg/m3 for PM10 at 75 m distance for

proposed project.

Conclusion:

As per recent ambient air monitoring, the result of PM10 is exceeding the limit.

As per air quality modeling, Predicted Maximum Incremental Concentrations of PM10 is

2.69µg/m3 at 76 m for existing project and 1.12µg/m3 for PM10 at 75 m for proposed project.

From this study we can conclude that pollution load w.r.t. PM10 will decrease after

proposed expansion.

Page 28: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

25

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure -1 Isopleths for PM10 (Existing Project)

Page 29: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

26

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Figure -2 Isopleths for PM10 (Proposed Project)

Page 30: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

27

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

6.0 ENVIRONMENTAL IMPACT AND MANAGEMENT PLAN

PARTICULARS DETAILS

Impact on Air

Construction/

Operational Phase

Air emissions both gaseous and fugitive from proposed plant will be on

account of process emissions from stacks of Induction furnace as well

as Rolling mill. The mitigation measure adopted as under:

The main raw material and product will be brought in and

dispatched by road through covered vehicles.

All the vehicle owners will have valid PUC Certificate

All vehicles are loaded up-to prescribed limit during

transportation.

Dust suppression on haul roads will be done at regular intervals.

Swiveling hood for fume extraction following by spark arrestor

(two stages), bag filter and ID fan with stack of 30 m will be

provided to control particulate emissions. The outlet dust

emission shall be <50mg/Nm3.

APCD solid waste will be sent to M/S Madhav Alloys (P) Limited

for metal recovery or TSDF site.

Air Quality Management:

Emissions Management

A stack of adequate height equipped with Bag filter will be

installed with the Induction furnace, Rolling mill to control the

particulate and gaseous emissions due to combustion of fuel.

All the roads are asphalted to control the fugitive dust

emissions

Proper servicing & maintenance of vehicles is/will be carried

out.

Gaseous emissions including secondary emission will be

treated in a fume extraction and cleaning system comprising

Page 31: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

28

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

of suction hood bag filter before discharged to the atmosphere

through combined stack of 30m height.

LRF, VD & CCM will have separate fume extraction system.

This suction will be of swiveling hood arrangement over each

of LRF & VD, which further include a separate ID fan. Bag

filter house will be connected to LRF & VD via air cooled

ducts.

Dust suppression and extraction system will be provided to

control dust emission from vulnerable sources like material

handling & storage areas.

All internal roads shall be asphalted and water sprinkling

done to control dust emission.

More than 33% Green Belt around the periphery and within

premises will be provided.

Monitoring Management

Ambient air quality and stack emission will be regularly

monitored to ensure that ambient air quality standards and

suggested limits on stack emission loads would be met honestly

at all the time.

Data on ambient air, stack emission and fugitive emission shall

be regularly sent to concerned area thereby.

Impact on water

Construction/ Operational phase

Water requirement of the plant will be met from tube well. Roof top

rain water will be recharged to compensate for ground water

withdrawal.

Water Management Fresh water requirement of the project will be met by existing

tube well.

Domestic waste water generated from the plant will be treated

in STP and treated water will be used in green belt

Page 32: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

29

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

development.

The cooling water will be re-circulated and blow down will be

dispose off through septic tank.

No water is used in manufacturing process and no waste

water requiring disposal is generated.

Impact on Noise

Construction/

Operational Phase

The expected noise levels of some of the proposed equipment like

Pumps (82-95 dB (A), Induction furnace (95-105 dB (A), DG sets

(100-120 dB (A).

The above noise levels are worked out without mitigation measures.

With the mitigation measures the noise levels will be further restricted

within very short distance from the source point.

The operators/personnel working near the noise sources in the Plant

will be provided with earmuffs and earplugs

More than 33% of green belt will be developed around the plant

premises which will act as noise abatement measures.

Noise Management There will be no danger of noise pollution from plant. The green

belt (plantation of dense trees across the boundary) helps in

reducing noise levels in steel plant as a result of attenuation of

noise generated due to plant operations and transportation.

Earmuffs will be used while running the equipments of the plant.

D.G sets will be provided with acoustic to control the noise level

within the prescribed limit.

A high standard of maintenance will be practiced for plant

machinery and equipments, which helps to avert potential noise

problems.

Personal Protective Equipment like earplugs and earmuffs will be

provided to the workers exposed to high noise level.

Page 33: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

30

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

Regular monitoring of noise level will be carried out.

Solid Waste Management Management APCD dust will be sent to M/S Madhav Alloys (P) Limited for

metal recovery or TSDF site and slag from process will be sold to

approved manufacturers of tiles, pavers & blocks.

Green belt Management Management

Green belt development in and around the plant site helps to

attenuate the pollution level.

Out of the total plant area approx. 15% land is already developed

as green belt and it will be maintained in future also.

Green belt has been/will be developed as per Central Pollution

Control Board (CPCB) guidelines.

Native species have been/ will be planted in consultation with the

local DFO.

Page 34: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

31

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

7.0 PROPOSED INFRASTRUCTURE

I. Industrial Area (Processing Area):-

The site already having administrative and site control office with latest equipment like computers,

walkie-talkie & computerized weighbridge, printers, fax, Xerox machine, etc. Sufficient power load

exists to meet the current requirement. Water for construction and domestic purpose as well industrial

purposes will be drawn from bore-well.

II. Residential Area (Non Processing Area):-

Labour hut / rest room, toilet, drinking water facility are already provided.

III. Green Belt.

The main objective of the green belt is to provide a barrier between the plant and surroundings areas.

More than 33 % green belt will be developed according to CPCB guidelines.

IV. Social Infrastructure.

There is sufficient number of educational facilities but health facilities are not up to the mark. The

sports and recreational facilities are also not adequate as there is no national or state level sports

complex; however an indoor / outdoor stadium of lower hierarchy is available within the town. One

cinema and two clubs also exist in town.

V. Connectivity (Traffic and Rail/Metro/Water ways etc)

The regional road network comprises of Kharar-Ludhiana G.T. Road (NH-95) and forms the major

spine. In fact the entire road network gravitates along this major spine.

Page 35: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

32

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

8.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN:-

R & R Plan is not applicable, as it is an expansion of existing plant.

9.0 PROJECT SCHEDULE & COST ESTIMATES:-

I. Likely date of start of construction and likely date of completion (Time schedule for the

project to be given):-

Within one year after receipt of NOC & Environmental Clearance

II. Estimated project cost along with analysis in terms of economic viability of the project:-

Total proposed project cost is estimated to be around Rs. 27.55 Crs

III. Cost toward Environment Protection: - Rs 110.0 lacs

Page 36: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

33

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

10.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

I. Financial and social benefits with special emphasis on the benefit to the local people including

tribal population, if any, in the area.

Financial Benefits:

Benefits and advantages of expansion of existing plant:

a) It will full fill the Demand Supply Gap.

b) It is help in increment of Life style of Local People By providing Jobs.

Social Benefits:

Greater employment for local populations

Environmental benefits:

a) Low emission of air pollutant (proper APCD will be installed).

b) It is a Brown field project.

c) Proposed project is based on ZERO discharge.

Other Benefits:

Revenues to the State and Central ex-chequers.

Over all development of District- Ludhiana in particular and Punjab State in general.

Page 37: PRE-FEASIBILITY REPORTenvironmentclearance.nic.in/writereaddata/Online/...2) Round,TMTBars&Flats-1,50,000TPA 3) Forged Roll- 3300TPA D. Environmental settings 1. Nearest Village Project

PRE-FEASIBILITY REPORT

34

M/S SHARU SPECIAL ALLOYS (P) LTD., LUDHIANA CPTL-EIA

11.0 CER ACTIVITIES Proposed unit will result in growth of the surrounding areas by increased direct and indirect

employment opportunities in the region including ancillary development and supporting

infrastructure. Special emphasis on Financial and Social benefits will be given to the local people.

Development of social amenities will be in the form of medical facilities, education to underprivileged

and creation of self help groups.

As per OM F.No.-22-65/2017-IA-III dated on 01st May,2018, the organization will spend Rs.24 lacs

towards Corporate Environment Responsibility The details of CER activity will be given in the final

EIA report.