pre commissioning report
DESCRIPTION
Pre commissioning reportTRANSCRIPT
PROJ ECT: WATER RESOURCES MANAGEMENT SECTOR PROJ ECT DOCUMENT NO:CONTRACT NO: ADB LOAN NO.2492-UZB & 2493-UZB (SF) SHEET NO:EMPLOYER MINISTRY OF AGRICULTURE & WATER RESOURCES DATE:THE REPUBLIC OF UZBEKISTANCONSULTANT: ENGINEERING CONSULTANTS PRIVATE LTDCONTRACTOR: KUBOTA ORTEX CONSORTIUM (J APAN UK)1. STATION / LOCATION: 2. NAME PLATE DETAILS:MAKE: RATED VOLTAGE:RATED CURRENT:TYPE: MAKING CAPACITY:BREAKING CAPACITY:SI.NO: OPERATIONAL COIL VOLTAGE:3. CHECK FOR COMPLETENESS OF INSTALLATION AS PER CHECKLIST: YES / NO4. INSULTATION RESISTANCE TEST (IN M)MEGGER USED (V) CIRCUIT REFERENCE R YBPOLE TO EARTH (VCB CLOSED)ACROSS CONTACT (VCB OPEN)POLE TO POLE (VCB CLOSED)OPERATING MOTOR & CONTROL CIRCUITS5. CONTACT RESISTANCE (IN m)R' PHASE:Y' PHASE:B' PHASE:6. PICK UP VOLTAGE OF OPERATING COILS:CLOSING COIL: 50% OF RATED VOLTSTRIPPING COIL: 70% OF RATED VOLTS7. OPERATING TIME AT RATED COIL VOLTAGE (IN ms)8. OPERATIONAL CHECKS:CLOSE: LOCAL REMOTE/AUTOTRIP:ANTI PUMPING:PROTECTION TRIP:OTHERS:KUBOTA-ORTEX CONSORTIUM EMPLOYER / CONSULTANTTEST REPORT FOR MV SWITCHGEAR - COMMISSIONINGR Y BCLOSING TIMETRIPPING TIMEPROJ ECT: WATER RESOURCES MANAGEMENT SECTOR PROJ ECTDOCUMENT NO:CONTRACT NO: ADB LOAN NO.2492-UZB & 2493-UZB (SF) SHEET NO:EMPLOYER MINISTRY OF AGRICULTURE & WATER RESOURCES DATE:THE REPUBLIC OF UZBEKISTANCONSULTANT: ENGINEERING CONSULTANTS PRIVATE LTDCONTRACTOR: KUBOTA ORTEX CONSORTIUM (J APAN UK)9. FUNCTIONAL CHECKS:a) EMERGENCY TRIP:b) TNC SWITCH OPERATION:c) ON-OFF INDICATION (LAMP+FLAG):d) TRIP / TRIP CIRCUIT HEALTHY INDICATION:e) LIMIT SWITCH FOR SPRING CHARGING MOTOR:f) SPRING CHARGED INDICATION:g) OPERATION COUNTER:h) HEATER / HEATER SWITCH / THERMOSTAT:i) FUNCTION OF ILLUMINATION, SOCKET SWITCH:10. REMARKS:KUBOTA-ORTEX CONSORTIUM EMPLOYER / CONSULTANTTEST REPORT FOR MV SWITCHGEAR - COMMISSIONING