pre commissioning report

2
PROJECT: WATER RESOURCES MANAGEMENT SECTOR PROJECT DOCUMENT NO: CONTRACT NO: ADB LOAN NO.2492-UZB & 2493-UZB (SF) SHEET NO: EMPLOYER MINISTRY OF AGRICULTURE & WATER RESOURCES DATE: THE REPUBLIC OF UZBEKISTAN CONSULTANT: ENGINEERING CONSULTANTS PRIVATE LTD CONTRACTOR: KUBOTA – ORTEX CONSORTIUM (JAPAN – UK) 1. STATION / LOCATION: 2. NAME PLATE DETAILS: MAKE: RATED VOLTAGE: RATED CURRENT: TYPE: MAKING CAPACITY: BREAKING CAPACITY: SI.NO: OPERATIONAL COIL VOLTAGE: 3. CHECK FOR COMPLETENESS OF INSTALLATION AS PER CHECKLIST: YES / NO 4. INSULTATION RESISTANCE TEST (IN MΩ) MEGGER USED (V) CIRCUIT REFERENCE R Y B POLE TO EARTH (VCB CLOSED) ACROSS CONTACT (VCB OPEN) POLE TO POLE (VCB CLOSED) OPERATING MOTOR & CONTROL CIRCUITS 5. CONTACT RESISTANCE (IN mΩ) R' PHASE: Y' PHASE: B' PHASE: 6. PICK UP VOLTAGE OF OPERATING COILS: CLOSING COIL: 50% OF RATED VOLTS TRIPPING COIL: 70% OF RATED VOLTS 7. OPERATING TIME AT RATED COIL VOLTAGE (IN ms) 8. OPERATIONAL CHECKS: CLOSE: LOCAL REMOTE/AUTO TRIP: ANTI PUMPING: PROTECTION TRIP: OTHERS: KUBOTA-ORTEX CONSORTIUM EMPLOYER / CONSULTANT TEST REPORT FOR MV SWITCHGEAR - COMMISSIONING R Y B CLOSING TIME TRIPPING TIME

Upload: charzree

Post on 16-Aug-2015

225 views

Category:

Documents


11 download

DESCRIPTION

Pre commissioning report

TRANSCRIPT

PROJ ECT: WATER RESOURCES MANAGEMENT SECTOR PROJ ECT DOCUMENT NO:CONTRACT NO: ADB LOAN NO.2492-UZB & 2493-UZB (SF) SHEET NO:EMPLOYER MINISTRY OF AGRICULTURE & WATER RESOURCES DATE:THE REPUBLIC OF UZBEKISTANCONSULTANT: ENGINEERING CONSULTANTS PRIVATE LTDCONTRACTOR: KUBOTA ORTEX CONSORTIUM (J APAN UK)1. STATION / LOCATION: 2. NAME PLATE DETAILS:MAKE: RATED VOLTAGE:RATED CURRENT:TYPE: MAKING CAPACITY:BREAKING CAPACITY:SI.NO: OPERATIONAL COIL VOLTAGE:3. CHECK FOR COMPLETENESS OF INSTALLATION AS PER CHECKLIST: YES / NO4. INSULTATION RESISTANCE TEST (IN M)MEGGER USED (V) CIRCUIT REFERENCE R YBPOLE TO EARTH (VCB CLOSED)ACROSS CONTACT (VCB OPEN)POLE TO POLE (VCB CLOSED)OPERATING MOTOR & CONTROL CIRCUITS5. CONTACT RESISTANCE (IN m)R' PHASE:Y' PHASE:B' PHASE:6. PICK UP VOLTAGE OF OPERATING COILS:CLOSING COIL: 50% OF RATED VOLTSTRIPPING COIL: 70% OF RATED VOLTS7. OPERATING TIME AT RATED COIL VOLTAGE (IN ms)8. OPERATIONAL CHECKS:CLOSE: LOCAL REMOTE/AUTOTRIP:ANTI PUMPING:PROTECTION TRIP:OTHERS:KUBOTA-ORTEX CONSORTIUM EMPLOYER / CONSULTANTTEST REPORT FOR MV SWITCHGEAR - COMMISSIONINGR Y BCLOSING TIMETRIPPING TIMEPROJ ECT: WATER RESOURCES MANAGEMENT SECTOR PROJ ECTDOCUMENT NO:CONTRACT NO: ADB LOAN NO.2492-UZB & 2493-UZB (SF) SHEET NO:EMPLOYER MINISTRY OF AGRICULTURE & WATER RESOURCES DATE:THE REPUBLIC OF UZBEKISTANCONSULTANT: ENGINEERING CONSULTANTS PRIVATE LTDCONTRACTOR: KUBOTA ORTEX CONSORTIUM (J APAN UK)9. FUNCTIONAL CHECKS:a) EMERGENCY TRIP:b) TNC SWITCH OPERATION:c) ON-OFF INDICATION (LAMP+FLAG):d) TRIP / TRIP CIRCUIT HEALTHY INDICATION:e) LIMIT SWITCH FOR SPRING CHARGING MOTOR:f) SPRING CHARGED INDICATION:g) OPERATION COUNTER:h) HEATER / HEATER SWITCH / THERMOSTAT:i) FUNCTION OF ILLUMINATION, SOCKET SWITCH:10. REMARKS:KUBOTA-ORTEX CONSORTIUM EMPLOYER / CONSULTANTTEST REPORT FOR MV SWITCHGEAR - COMMISSIONING