HVAC PROJECT DETAILS
• Building Type : Office Building
• Location : Bangalore
• Floors : 3 Floors
• Area : 38,014 SF
• Cooling Load : 104.4 TR
• Comfort condition : 77°F with 50% RH
• Design Occupancy : 1008 People
• Operating Schedule : 6 Days /Week
• Air Distribution System : VAV Single Duct
![Page 3: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/3.jpg)
TYPICAL FLOOR PLANSECOND FLOOR PLAN
![Page 4: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/4.jpg)
HEAT LOAD REPORT
![Page 5: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/5.jpg)
AIR DISTRIBUTION
• Ceiling suspended AHU is selected to distribute air & Comfort condition is ,
• 77°F with 50% RH, ADP is 54°F & 7500 CFM per AHU.
• Chilled water inlet 7°C & outlet is 15°C.
• VCD are placed at beginning of each duct.
• Backward curved aero-foil blade centrifugal fan for AHU.
BOS - BOTTOM OF SLABBOD - BOTTOM OF DUCTBOFC – BOTTOM OF FALSE CEILING
![Page 6: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/6.jpg)
DUCT PRESSURE DROP ANALYSIS
• Pressure drop is due to bends and head.
• Based on pressure drop in Critical path AHU fan is selected.
• For efficient air flow through duct, pressure loss should be minimum.
![Page 7: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/7.jpg)
CHILLER PLANT
• Total building load 104.4TR
• Diversity factor is 100%
• Water cooled screw chiller of 104.4TR
• Counter flow cooling tower for 104.4TR capacity.
![Page 8: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/8.jpg)
PLUMBING
• 1% slope for sanitary pipes
• No 90°bends only Y fittings
![Page 9: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/9.jpg)
ELECTRICAL SYSTEM
• Cables are sized and selected based on current flow by using standard catalogues
• Ladder type cable trays are used
• As per NBC lighting fixture is at 7 feet from floor
![Page 10: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/10.jpg)
FIRE FIGHTING
• Fire fighting system is designed as per NBC standards for commercial building
• Pipes are sized based on number of sprinklers
• Sprinklers are placed effectively to cover entire area of the building
![Page 11: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/11.jpg)
CO-ORDINATION OF ALL FLOORS
![Page 12: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/12.jpg)
INTERFERENCE CHECK
• Interference check between MEP systems is performed
• Clashes are highlighted by ID
![Page 13: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/13.jpg)
CLASH DETECTION AND SOLUTION
CLASH OF FIRE FIGHTING PIPE & DUCT
CLASH SOLVED BY MOVING FIRE FIGHTING PIPE
![Page 14: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/14.jpg)
ANNOTATION
• Labels are created to annotate duct size and flow rate
• Diffusers are tagged with neck size and CFM
![Page 15: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/15.jpg)
CREATION OF FAMILIES
• Designing of AHU with specified duct sizes and pipe connectors
• Designing of Air terminal with specified neck sizes
![Page 16: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/16.jpg)
BILL OF QUANTITY
![Page 17: PRAVEEN PROJECT PORTFOLIO](https://reader034.vdocuments.site/reader034/viewer/2022052305/588500cb1a28ab7d698b56df/html5/thumbnails/17.jpg)