Institutional Model Sustainability :
Awareness
To work together between villager Responsibility
Ensure the job is done well
Legal form to help expanding Further rural economics
development :After Renewable Electricity power generation
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
3/33
Promoted Institutional Model PPP
Public-Private Partnership
But Public more to Governmentactual target: Rural Community
So:
Private-Community Partnership
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
4/33
Opportunity on PCP Private engagement:
Private : Investor , help further more to Bank
Bank : Unlimited resources -> Speed up Development+ Good investment & stabile return
For Rural Community
Provide:
Equity, CapitalEnsure realization of Renewable Power
Long term advantage use from RE utilization
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
5/33
Challenges + Strategy Selection RE power generation Tech:
Potential available nearby the community
Mature + Good capacity factor Cost reduction opportunity (local manufacturing +
contribution of community)
Capacity building & long term supervision
Technical & management training & supervision. Institutional transparency (report, open advice & critics)
Careful selection of local villager for personnel.
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
6/33
Challenges + Strategy
(For Micro/Mini Hydro Development) How tomore ensure the flow stability in the future?
Provide incentive for community who lived the
catchment area & routine forest plantationactivity.
Rarely given attentions.
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
7/33
Challenges + Strategy
(For Micro/Mini Hydro Development)
Establishment of local manufacturing +Lower manufacturing cost (long term supervising on
quality)
Capacity building on technical & management +Speed up rural development with sustainable activity
+Lower Overhead cost (2 supervisor: technical & social)
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
8/33
PCPCooperation: Even share
+ Investor = provide overall financing
+ Community = have natural resources + man power(Fully implemented after the investment reachpayback)
Opportunity:
It will raise the pride and motivation of rural villagerto find their way out of poverty.
Good & more ensure return for Investors.
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
9/33
I hope my water resources can be developed forsustainable rural development.
Even share will give a pride and motivation for us to getout of poverty by ourself.Rural economy development & education will teach us topreserve forest as the water resources.
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
10/33
Off -Grid Economics: a deep social-economics study
Do the villager can pay?
They actually use kerosene with higher cost
What if they use Free fuel: firewood?
Prices from -> Investment + Operational Cost, from->Technology selection & capacity factor
+ Productive use
Willingness to pay:
Focus on Social development-> raise awareness
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
11/33
Off -Grid Social Development:
Base for all activities
Supporting National Development (Main Goal)
Must be started & Focus on Social Development
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
12/33
Sudden Incoming National GridWhat ?
It supposed to be >5years again
National Grid in remote area: Often blackout
Higher installation cost (only the group of house, notindividuals on each their fields)
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
13/33
Sudden Incoming National Grid Economics: must have more competitiveness
Prices from -> Investment + Operational Cost, from->Technology selection & capacity factor
+ Productive use
Social Development:
Base for all activities
Supporting National Development (Main Goal)
Must be started & Focus on Social Development
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
14/33
An Example of
Good management & technical in
rural area
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
15/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
16/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
17/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
18/33
TABA details
Perusahaan Listrik Desa (PLD)Operator
PEMDA Kab Tana Toraja.Owner
January 2000.Commissioning and operation
Synchronous, ELCGenerator, control systemCross flow T- 12Turbine specification
60 kilowattPower out put
E 7 program, AIJDevelopment scheme
Dec 1998 Dec 1999.Construction schedule
Taba, kec Rindingalo, Tana Toraja.Location
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
19/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
20/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
21/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
22/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
23/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
24/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
25/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
26/33
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
27/33
(BUMN/National Grid suddenlycome with 2.5 centsUS$/kWh)
PLNvs
PLD(BUMDes, Village own electricCompany, with 8 centsUS$/kWh)
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
28/33
PLD(BUMDes)
Won, Because:1. Can provide more stabile electric
(National Grid/PLN too often blackout)2. It is closer and easier to complain, than
to National Grid (4 hour).3. The villager realize what they are
paying are for their own village
development (essential services).
Reason 3 is the main reason, why thevillager comeback to their own ElectricCompany
IBEKA
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
29/33
political stabilityfavorable economical
and social trends
Ecological soundnessgood environmental condition
Local resourcesLocal contribution
manure
outside contributionsADVISE, TECHNOLOGY,TRAINING, FINANCIAL
complementarytransparent/open
well dosedtime balanced
continuously monitored
IBEKA
IBEKA
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
30/33
IBEKA
CINTA MEKAR PUBLIC (community) PRIVATE PARTNERSHIP
Village development activity
Dedicated for
Education * Scholarship (8 %)* Training for adult
Health care (8 %)
Seed capital / income generating (10 %)
Electrification 122 house hold (62,5 %)
Village infrastructure (4 %)
Village operational contribution (2,5 %)
Cooperative operational cost (5 %)
Approximate Mekarsari coop monthly income Rp 4.735.000,-
The priority above is for the first 17 month operation, based on electrification cost for 122 hh,set by public meeting, and have been change by the same manner after 122 hh electrified
0 %
65 %
16 %
7,5 %
4 %
2,5 %
5 %
IBEKA
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
31/33
IBEKA
IBEKA:People Centered Business and Economics Institute
Director: Mrs. Tri Mumpuni(Also Indonesian Coordinator at Partners for a New Begining of
US Government)
IBEKA Focus:Rural development with renewable energy power generation astools and bargaining.
The use of Renewable Energy to motivate villager in makingtheir own way out of poverty
IBEKA
-
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
32/33
IBEKA IBEKA:
People Centered Business and Economics InstituteAddress: Jl. Madrasah II No.28 Jakarta, Indonesia +62-21-5492087(Secretary: [email protected])
Director: Mrs. Tri Mumpuni ([email protected]) Program Officer: Pradygdha Kumayan Jati, ST.
([email protected]), experience: Anti Corruption expert's assistant Waste To Energy Power Generation Research Tidal Power Generation Research Municipal Waste Processing (Biogas, Gasification, Landfill) New Zealand's Sustainable Energy Study 2008. More on appropriate RE technology for rural development.
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected] -
8/6/2019 Pradygdha Jati - Lesson Learned From Rural Micro Hydro Develompent in Indonesia
33/33
Thank you