ppt of cyclone refractory damaged portion. 9.5.2015.pdf
TRANSCRIPT
-
CYCLONE REFRACTORY DAMAGED
AT 35 MTR EL.
WINDBOX REFRACTORY
DAMAGED AT 4.5 MTR EL.
-
Refractory damaged at Wind box
RHS air inlet duct
-
Refractory damaged at Wind box
LHS air inlet duct
-
Wind box front side refractory
damaged and heavy air leakage
observed from this point
-
Cyclone LHS bull Nose damaged portion.
-
Cyclone LHS bull nose damaged portion wall
-
LHS Heavy erosion of cyclone inlet duct wall
Where wall is also bulged.
-
Cyclone LHS:- furnace outlet duct wall
bulge.
-
Cyclone LHS:- furnace outlet duct wall is bulge
-
Cyclone LHS:-furnace outlet duct wall damaged portion
-
Cyclone LHS flue gas inlet portion
wall observed bulge
-
Cyclone flue gas inlet duct gap observed
-
LHS Cyclone inlet bull nose damaged
-
LHS Cyclone inlet top portion bulged
-
LHS Cyclone inlet refractory damaged
-
RHS Cyclone bulged refractory breaking
work under progress
-
Cyclone RHS refractory breaking near manhole
-
Cyclone RHS refractory breaking
near manhole
-
RHS Cyclone inlet bull nose damaged
-
RHS Cyclone inlet bull nose refractory
damaged
-
Cyclone RHS inlet refractory damaged