  • CYCLONE REFRACTORY DAMAGED

    AT 35 MTR EL.

    WINDBOX REFRACTORY

    DAMAGED AT 4.5 MTR EL.

  • Refractory damaged at Wind box

    RHS air inlet duct

  • Refractory damaged at Wind box

    LHS air inlet duct

  • Wind box front side refractory

    damaged and heavy air leakage

    observed from this point

  • Cyclone LHS bull Nose damaged portion.

  • Cyclone LHS bull nose damaged portion wall

  • LHS Heavy erosion of cyclone inlet duct wall

    Where wall is also bulged.

  • Cyclone LHS:- furnace outlet duct wall

    bulge.

  • Cyclone LHS:- furnace outlet duct wall is bulge

  • Cyclone LHS:-furnace outlet duct wall damaged portion

  • Cyclone LHS flue gas inlet portion

    wall observed bulge

  • Cyclone flue gas inlet duct gap observed

  • LHS Cyclone inlet bull nose damaged

  • LHS Cyclone inlet top portion bulged

  • LHS Cyclone inlet refractory damaged

  • RHS Cyclone bulged refractory breaking

    work under progress

  • Cyclone RHS refractory breaking near manhole

  • Cyclone RHS refractory breaking

    near manhole

  • RHS Cyclone inlet bull nose damaged

  • RHS Cyclone inlet bull nose refractory

    damaged

  • Cyclone RHS inlet refractory damaged