ppc presentation on the technical regulations for petroleum resource development 27 august 2014 1

29
PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

Upload: rodger-flynn

Post on 12-Jan-2016

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR

PETROLEUM RESOURCE DEVELOPMENT

27 AUGUST 2014

1

Page 2: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

PRESENTATION OUTLINE Background Legislative Framework What is shale gas? What is Hydraulic Fracturing? Scope of Regulations Benefits of Shale Gas Concluding Remarks

2

Page 3: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

BACKGROUND In February 2011 the DMR imposed a moratorium on

the processing of new applications for reconnaissance permits, technical corporation permits, exploration rights and production rights.

An interdepartmental team was convened to investigate and submit a report on the potential environmental risks associated with hydraulic fracturing as well as the negative and positive social and economic impacts of shale gas.

3

Page 4: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

BACKGROUND CONT… Cabinet approved the report on the “Investigation of

Hydraulic Fracturing”, with the following key recommendations: The establishment of an inter-departmental committee

to augment the current regulatory framework to mitigate any negative environmental impacts associated with Hydraulic Fracturing; and

A need for collaboration between the Departments of Mineral Resources and Science and Technology to explore mechanism for the co-existence of the Astronomy Research Projects and development of shale gas in the Karoo.

4

Page 5: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

BACKGROUND CONT... The inter-departmental committee has developed draft

Technical Regulations for Petroleum Exploration and Exploitation to address the following:

augment gaps identified in the current regulatory framework governing exploration and exploitation of petroleum resources, particularly in relation to Hydraulic Fracturing ;and

prescribe good international petroleum industry practices and standards that will enhance safe exploration and production of petroleum.

5

Page 6: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

BACKGROUND CONT... The draft Regulations have been published for public

input and comment on the 15 October 2013.

The Department is in the process of consulting interested and affected communities.

6

Page 7: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

LEGISLATIVE FRAMEWORKUpstream oil and gas activities governed by the following primary legislation:Mineral and Petroleum Resources Development ActNational Water Act,

National Environmental Management Act,

Astronomy Geographic Advantage Act,

National Environmental Management Waste Act

7

Page 8: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

LEGISLATIVE FRAMEWORK Cont…

This Regulations are meant to augment existing legislative framework

Not exhaustive on their own and must be read where applicable and relevant with other applicable legislation.

8

Page 9: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

WHAT IS SHALE GASWhat is Shale Gas?

Form of natural gas that is found trapped within shale formations;

Shale layer typically lies between 1500 – 4000m below surface and is overlain by thick and tight geological formations that may act as a barrier to protect ground water.

Because it is found in low or no permeable formations, it’s production is enhanced by Hydraulic Fracturing.

Shale gas therefore requires special processes; stimulation and production to achieve economic production.

9

Page 10: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

WHAT IS HYDRAULIC FRACTURING Hydraulic Fracturing is the pressurized injection of a mixture of water, chemicals, and sand in underground formations(rocks with low or no permeability) to allow natural gas and oil to flow more freely from rock pores to a production well.

10

Page 11: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

HYDRAULIC FRACTURING CONT… The use of hydraulic fracturing is perceived to have the attendant

risk of polluting sources of drinking water by fracturing fluids and/ or methane and induced seismic events.

Current industry well construction and integrity practices as contained in American Petroleum Institute (API) standards ensure the protection of underground sources of drinking water from impacts related to oil and gas exploration and production activities, including hydraulic fracturing.

The key objective of the Technical Regulations is to incorporate the well construction and integrity standards and practices into our regulatory framework governing the exploration and production of oil and gas.

11

Page 12: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SCOPE OF THE REGULATIONS The aspects of the draft regulations will not apply only in respect of

hydraulic fracturing but will apply generally to issues relating to petroleum exploration and production with a special emphasis on hydraulic fracturing.

Stimulation of a reservoir by way of hydraulic fracturing is not confined to unconventional gas or exploration and production operations, it is also applies to conventional gas.

12

Page 13: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SCOPE OF THE REGULATIONS CONT… Conventional Gas – Gas trapped in rocks that are permeable allowing gas to

travel upwards towards a lesser pressure until it reaches a trap where a well can be drilled to extract the hydrocarbons.

Unconventional Gas – Gas trapped in impermeable rock which cannot migrate to a trap to form a conventional gas deposit i.e. Shale Gas, CBM and Tight Sands.

13

Page 14: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS

Assessment of the Geology and Geohydrology of the Area – Regulation 4

To understand possible threats associated with hydraulic fracturing one must understand the geology of the location targeted.

Understanding the geology of the area also helps regulators to determine appropriate protective regulatory measures.

Assessment of Geohydrology helps with understanding of the character, availability and quality of groundwater and for such knowledge to be incorporated in the well engineering design.

14

Page 15: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS CONT… Casing Standards – Regulation 12-16 (Cont) installing a steel pipe (called casing) and cementing this steel pipe

into place is the primary method used for protecting groundwater and maintaining “well integrity” (containing produced hydrocarbon into a well).

Casing must be able to withstand the various compressive, tensional, and bending forces that are exerted while running in the hole i.e. must withstand at least 1.2 times the maximum pressure to which it may be subjected during operations (Regulation 2).

All casing must be in accordance with the API “5CT Specification for Casing and Tubing” which specifies the length, thickness, tensile strength and composition of casing.

15

Page 16: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

DIFFERENT TYPES OF CASINGSConductor Casing

• Stabilizes unconsolidated

sediments• Isolates shallow

aquifer

16

Page 17: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

DIFFERENT TYPES OF CASINGS CONT…Surface Casing

17

• Protects surface fresh water formations

• Provides support for pressure control

Page 18: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

DIFFERENT TYPES OF CASINGS CONT…Intermediate Casing

Isolates unexpected fresh water found below surface casing shoe

18

Page 19: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

DIFFERENT TYPES OF CASINGS CONT…Production Casing

Isolates the production zone from other formations and the fluid in them. Provides protective housing for production equipment Covers worn or damaged intermediate casing.

19

Page 20: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS CONT...Horizontal and Vertical Well

20

Page 21: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS CONT...

Cement Requirements & Compressive Tests – Regulation 18 After casing is run into a hole it must be cemented in place which is

important in maintaining well integrity. Cement plays a role in isolating hydraulic fracturing operations from

fresh water and other permeable horizon. A well not cemented properly leads to gas leaks into the other units,

particularly drinking water aquifers, as it comes back up the well. Macondo Well Blowout – One of the reasons was bad cement job. All cement placed into the well bore must meet the standards of

American Petroleum Institute (API) “ 10 A specification for cements and material for well cementing”.

Blowout Prevention – Regulation 21 Blowout Preventers are used to seal, control and monitor oil and gas

wells to prevent blowout which is critical to the safety of the crew.

.

21

Page 22: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS CONT...

Water Resource Assessment & Monitoring – Regulation 5 & 38

Provides for baseline water quality assessment by an independent specialist for a period of a year prior to operations and continuous sampling of water during operations to determine any changes if any.

Protection of Water Resources Setbacks – Regulation 38

Regulate the distance between hydraulic fracturing well and streams, wetlands as well as existing municipal water wells:

22

Page 23: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS CONT...

Hydraulic Fracturing Fluid Disclosure – Regulation 29

Provides for the disclosure of hydraulic fracturing fluids to be used i.e. fluids and their status as hazardous/non hazardous.

Induced Seismicity Assessment– Regulation 6

Creates an obligation to develop and implement mitigation measures for hydraulic fracturing induced seismicity i.e. conducting site-specific surveys and other techniques to identify faults.

Fluids Disposal- Regulation 41

Approved waste disposal facility and disposal to underground and re-injection disposal prohibited

23

Page 24: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS CONT...

Water Source and Use – Regulation 40

Provides for the disclosure of water supply source, location and water usage volume.

Protection of Astronomy Activities – Regulation 9 & 10 Provides for the rules of interface between shale gas exploration in

the Karoo Area and the Square Kilometre Array Project to address the second key recommendation as discussed above.

DST,DMR and PASA are continuing to engage to determine the extent of SKA on shale gas application areas and to develop mechanisms to minimise such impacts.

24

Page 25: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

SALIENT PROVISIONS OF THE REGULATIONS CONT...

Monitoring of Operations – Regulations 12,18,20

All phases of operations to be monitored i.e. casing, cementing, formation pressure integrity and BOP tests.

Fracture and Fracturing Fluid Containment – Regulation 30

HF Fluid must be monitored to ensure it is confined to the target zone and any indication of migration will result in suspension of operations.

Assessment of Related Seismicity – Regulation 6

Provides for testing of fracture behaviour of targeted formation by pre-fracturing injection tests and micro-seismic monitoring.

25

Page 26: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

BENEFITS OF SHALE GAS Contribute towards SA energy mix Increase in sources of energy resources Cost effective energy resource Electricity generation Contribute to GDP Increase in foreign direct investment FDI Improve balance of payment Development of new gas industry

26

Page 27: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

BENEFITS OF SHALE GAS Cont.. Activities associated with shale gas Trading in gas resources Provision of Industrial, commercial and domestic energy Electricity generation Conversion to liquid fuels to use as an automotive fuel Energy feedstock for fertilizer production Socio-Economic Infrastructure development Creation of employment opportunities Skills development and training Business opportunities

27

Page 28: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

CONCLUDING REMARKS The draft regulations once finalised will result in a regulatory

framework that ensures safe extraction of gas which will contribute to diversification of South Africa’s energy mix, energy security supply, significantly boost South Africa’s economy and have positive effects on the Gross Domestic Product.

28

Page 29: PPC PRESENTATION ON THE TECHNICAL REGULATIONS FOR PETROLEUM RESOURCE DEVELOPMENT 27 AUGUST 2014 1

THANK YOU

29