PP Action Plans
![Page 2: PP action plans](https://reader036.vdocuments.site/reader036/viewer/2022091122/588765b01a28ab22358b482b/html5/thumbnails/2.jpg)
Timeline
![Page 3: PP action plans](https://reader036.vdocuments.site/reader036/viewer/2022091122/588765b01a28ab22358b482b/html5/thumbnails/3.jpg)
Action plan
![Page 4: PP action plans](https://reader036.vdocuments.site/reader036/viewer/2022091122/588765b01a28ab22358b482b/html5/thumbnails/4.jpg)
Personal Project Action Plan
![Page 5: PP action plans](https://reader036.vdocuments.site/reader036/viewer/2022091122/588765b01a28ab22358b482b/html5/thumbnails/5.jpg)
Hints• Give yourself a spare week • Include a reflection (against specifications)
and further improvement stage• Stick to your timeline • If you miss your timeline record why in your
process journal
![Page 6: PP action plans](https://reader036.vdocuments.site/reader036/viewer/2022091122/588765b01a28ab22358b482b/html5/thumbnails/6.jpg)
Level Descriptor Task specific clarification1-2 Present a limited or partial plan for
the project Stages of action are suggested
3-4 Present an adequate plan for the project
Most stages of action are recorded with a timeline
5-6 Present a substantial plan for the project
All required stages of action are recorded with a timeline
Some related details including who, what, where and how are incorporated, as required
7-8 Present a detailed and accurate plan for the project
All stages of action (including reflection and refinement) are recorded with a timeline
Including detailed who, what, where and how, as required
Action plan rubric