Figure 2 – High level Process for Algorithm Updates
Updates of operational IDPS algorithms need to be rapid, accurate, and compatible with the exigencies of 24/7 operations. As algorithms progress
through the Calibration/Validation program, they mature and become more suitable for end users’ needs, as defined by the product maturity levels
in Figure 1. The program’s approach to incorporate changes must handle algorithms in each stage of the validation regime appropriately, with
processes and controls that balance the speed of updates against operational system considerations (Figures 2 and 3). In addition, to help ensure a
rapid transition of the algorithm code into the operational baseline, JPSS CGS has developed tools and methods to reduce the cycle time from
science algorithm to operational code. These tools (Figure 4) are being made available to any science algorithm developer who feels they may be
beneficial, and will be required for use by GFE algorithm developers.
Government RaytheonJoint
Figure 4 - Algorithm Development Library
The Algorithm Development Library provides a toolkit enabling algorithm developers to work outside of JPSS
CGS-provided hardware, yet allow quick integration of new or modified algorithms into IDPS. This is
accomplished by aligning the algorithm structure with the IDPS architecture approach, and using operational
code-identical interface calls to perform I/O operations on the developer’s native platform.
P
File Based
CMD LineFile Based
CMD Line
I Alg Development
Science
Integration/OPS
ADL Framework
I O DMS Memory
Defined APIsDMS Memory
Defined APIs
Integrated
Algorithm
CAT 1
PRO Common Framework
O P
P
Algorithm changes enter the Change Process through discoveries made by the Government Team or by external entities
which may propose changes to JPSS CGS algorithms. Once proposed, all recommendations are jointly vetted and, if
worthy, approved for incorporation. At this point, the change is verified from a scientific standpoint to ensure that it is both
effective and compatible with other products and processes in the system. After all stakeholders are satisfied of the efficacy
of the change, it is prioritized with other updates, integrated and tested with the complete system, and deployed to
operations.
Algorithm Change
Recommendations
from the Government
Team or External Data
Users
Joint Adjudication of
Recommendations
Government
Approval
Science
Verification of
Change
Change
Control
Boards
Integration and
Testing
Science and
Operational
Verification of
Change
Deploy to JPSS CGS
Operations
Figure 3 – Rapid Algorithm Deployment Timeline
For algorithms in the “beta” maturity category, it is possible to execute the deployment of changes to the
Integration and Test system at a Central in as little as 24 hours. This capability is essential during the Intensive
Cal/Val timeframe, since immediate updates may be necessary to ensure continued production of xDRs for
evaluation. For products at more advanced maturity levels, standard sustainment processes would apply to
ensure all operational necessities are followed.
STAGE NPP SDR NPP EDR
Product Maturity Levels Product Maturity Levels
Preliminary
Comprehensive
Beta
Provisional
Validated/Calibrated
Beta
Provisional
Validated – Stage 1
Validated – Stage 2
Validated – Stage 3
Maturity Levels
Beta
Provisional
Validated – Stage 1
Validated – Stage 2
Validated – Stage 3
Early release,minimally validated, may
contain significant errors
Product quality may not be optimal
Ready for use – small validation range
Ready for use – wide validation range
Ready for use – robust validation
Joint Polar Satellite System Common Ground System (JPSS CGS)
NPOESS Preparatory Project (NPP) Rapid Algorithm Updates
Kerry Grant, JPSS CGS Chief Engineer
Raytheon Intelligence and Information Systems, Aurora CO
Bonnie Reed, Cal/Val Scientist
General Dynamics - IT, Formerly of the NPOESS Integrated Program Office
Gary Route, IDPS Chief Engineer
Raytheon Intelligence and Information Systems, Aurora CO
Figure 1 – Algorithm Validation Categories and Maturity Levels
Hour 0 1 2 3 4 5 6 7 8 9 10 11 12 13
Time of Day
(Mountain Time) 0800 0900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000
Change approved
Review and assign
Fix
Build
Install at GISF
Factory Test and Evaluate Results
Prepare Patch Documentation
Internal Review and Approve
Deploy to NESDIS
Margin
14 15 16 17 18 19 20 21 22 23 24
2100 2200 2300 2400 0100 0200 0300 0400 0500 0600 0700
Install on I&T Env
Checkout Installation
Notify ICV team