PLC Installations • Receiving a PLC • PLC Enclosures • Electrical Noise • PLC Power Supplies • PLC Installation Safety • PLC Wiring • PLC Startup • Initial PLC Checks • Input Section Checks • Output Section Checks • Program Checks • Final Checks
![Page 2: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/2.jpg)
Chapter 8 — PLC Installations and Startup
Installation issues that a technician must address include receiving a PLC, PLC enclosures, electrical noise, power supplies, safety, and wiring.
![Page 3: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/3.jpg)
Chapter 8 — PLC Installations and Startup
When receiving a PLC and any associated hardware, there are several procedures that must be followed.
![Page 4: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/4.jpg)
Chapter 8 — PLC Installations and Startup
An enclosure protects a PLC from the surrounding environment and protects technicians from contact with energized parts.
![Page 5: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/5.jpg)
Chapter 8 — PLC Installations and Startup
PLCs can be mounted to a backpanel or to a DIN rail.
![Page 6: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/6.jpg)
Chapter 8 — PLC Installations and Startup
Fans, cooling units, and/or solar shields are used to prevent excessive heat buildup inside PLC enclosures.
![Page 7: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/7.jpg)
Chapter 8 — PLC Installations and Startup
Proper installation of a PLC in an enclosure should prevent most electromagnetic interference problems.
![Page 8: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/8.jpg)
Chapter 8 — PLC Installations and Startup
PLCs have separate metal raceways (conduits) for voltage supply wires and signal wires.
![Page 9: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/9.jpg)
Chapter 8 — PLC Installations and Startup
Ground lug connections must be tight and mechanically sound to guarantee a good electrical connection.
![Page 10: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/10.jpg)
Chapter 8 — PLC Installations and Startup
The twisting of conductors and the shield/drain wire provide enhanced noise reduction. The shield/drain wire is only grounded at one end (the PLC end) when connected to analog input devices.
![Page 11: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/11.jpg)
Chapter 8 — PLC Installations and Startup
PLC power supplies, input devices, output components, and related items use a common power source to avoid ground loops and mismatched hot and neutral phases and to ensure all items are powered up and powered down together.
![Page 12: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/12.jpg)
Chapter 8 — PLC Installations and Startup
Emergency stop buttons are wired to master control relays (MCRs) and are located on machinery and process equipment to protect equipment and personnel.
![Page 13: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/13.jpg)
Chapter 8 — PLC Installations and Startup
Hold-up time is the length of time a PLC can tolerate a power loss without affecting operation.
![Page 14: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/14.jpg)
Chapter 8 — PLC Installations and Startup
In order to prevent noise-related problems, conductors of different voltage levels and signal types must be separated as much as possible and must not be tywrapped together.
![Page 15: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/15.jpg)
Chapter 8 — PLC Installations and Startup
The three methods for terminating PLC wiring in an enclosure are direct, terminal strip, and interface module.
![Page 16: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/16.jpg)
Chapter 8 — PLC Installations and Startup
When input devices and output components are connected to an interface module, a prefabricated cable must be used to connect the interface module to the PLC.
![Page 17: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/17.jpg)
Chapter 8 — PLC Installations and Startup
Input and output modules are chosen according to the type of module and voltage level required for an application.
![Page 18: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/18.jpg)
Chapter 8 — PLC Installations and Startup
PLC input and output modules are placed in a PLC chassis to ensure optimum performance and prevent noise-related problems.
![Page 19: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/19.jpg)
Chapter 8 — PLC Installations and Startup
A sourcing PLC input or output has the negative (–) polarity connected to the field device, while a sinking PLC input or output has the positive (+) polarity connected to the field device.
![Page 20: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/20.jpg)
Chapter 8 — PLC Installations and Startup
Technicians performing a PLC startup require specific startup items.
![Page 21: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/21.jpg)
Chapter 8 — PLC Installations and Startup
Initial checks are visual tests performed by a technician before any power is applied to a PLC.
![Page 22: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/22.jpg)
Chapter 8 — PLC Installations and Startup
Input section (or module) checks verify that input devices function properly and are wired to the correct PLC input terminal.
![Page 23: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/23.jpg)
Chapter 8 — PLC Installations and Startup
Output section (or module) checks verify that all output devices function properly and are wired to the correct PLC output terminal.
![Page 24: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/24.jpg)
Chapter 8 — PLC Installations and Startup
Program checks verify that a PLC program functions properly without the application or process that the PLC controls actually being run.
![Page 25: PowerPoint ® Presentation Chapter 8 PLC Installations and Startup PLC Installations Receiving a PLC PLC Enclosures Electrical Noise PLC Power Supplies](https://reader035.vdocuments.site/reader035/viewer/2022081417/56649dce5503460f94ac1963/html5/thumbnails/25.jpg)
Chapter 8 — PLC Installations and Startup
A final check verifies that an application or process controlled by a PLC functions properly in RUN mode under actual conditions.