Page 1: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

POWER7 Hardware Migration Options

Page 2: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

2

So you decided to move to a POWER7 server. Great! But how do you get there?

Power 770

Power 750

Power 780

PS Blades

Power 720/740

Power 710/730

Power 795

Page 3: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

3

Definitions for This IBM Presentation

� Upgrade = new model which keeps the same serial number– Example: POWER6 570 9117-MMA to POWER7 770 9117-MMB

� Migration = new model which does not keep the same serial number– Example: POWER6 550 8204-E8A to POWER7 750 8223-E8B

• Insight: Legal & accounting rules require at least

20% of the original asset to be reused to be

classified an upgrade to the same asset. • IBM uses a serial number to track an asset and

uses an average config definition to determine if

a model upgrade path can be offered.

• Each client has to determine how to classify their new model acquisition. (if an upgrade or not)

Page 4: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

4

Is protecting a serial number important?

� To some clients, it does not matter. To others it does matter.

� Serial number might matter:– Additional documentation/tools for moving to newer server

– Financially works better for depreciation/budget

– IBM software entitlements moves easily to newer server (especially IBM i)

– IBM 5250 entitlements (IBM i) moves easily to new server

– May ease discussions with ISVs if licensing serial number specific

� Serial number might not matter:– Financial impact to depreciation/budget not an impact

– IBM software transferable (with a bit more effort)

– IBM 5250 more transferable now to POWER7 with RPQ

– ISV software licensing not impacted by serial number

Page 5: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

55

Model Upgrades (Same Serial Number) as of May 2011

POWER5 ���� POWER6 POWER6 ���� POWER7

595

570

550

520/525

520/515

595

570

550

520 4-core

520 2-core

560

795

770

750

780

720 4 core

720 6/8 core

740

730

710

520 1-core

595

570

550

520 4-core

520 2-core

560

520 1-core

9406 only

9406 only

9406 only

No one-step POWER5 to POWER7 upgrades

Page 6: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

6

Power 770

Power 750

Power 795

Power 720/740

PS BladesPower 710/730

Power Systems

76,300

1,000,000

+181,000

97,700

97,700

Memory & I/O loops & GHz are important POWER7

selection factors

I/O loops

Memory

GHz

n/a

8 - 256 GB

3 GHz

Max 8 - 32

16GB - 8 TB

3.7-4.25 GHz

Max 1 - 2

8 - 512 GB

3.0 – 3.55 GHz

0

4 - 128 GB

3.0 – 3.7 GHz

Max 0 - 1 - 2

8 - 256 GB

3.0 – 3.7 GHz

Max 2 - 8

32GB – 2TB

3.1 – 3.5 GHz

Max 2 - 8

32GB – 2TB

3.8–4.1 GHz

Power 780

More redundancy, reliability

, availability designed into server

Page 7: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

7

RAS Item Power 750 Power 770 Power 780 Power 595 Power 795

Redundant / Hot Swap Fans & Blowers

Hot Swap DASD / Media / PCI Adapters

Concurrent Firmware Update

Redundant / Hot Swap Power Supplies

Dual disk controllers (split backplane)

Processor Instruction Retry

Alternate Processor Recovery

Storage Keys

PowerVM™/Live Partition Mobility/Live Application Mobility

Redundant Service Processors * *

Redundant System Clocks * *

Redundant / Hot Swap Power Regulators

Dynamic Processor Sparing

Memory Sparing

Hot GX Adapter Add and Cold Repair

Hot-node Add / Cold-node Repair * * *

Hot-node Repair / Hot-memory Add * * *

Dynamic Service Processor and System Clock Failover * *

Hot-node Repair / Hot-memory Add for all nodes** * * *

Enterprise Memory

Hot GX Adapter Repair

Midplane connection for inter-nodal communication

Active Memory Mirroring for Hypervisor

POWER7 RAS Feature OverviewOptionalStandard

Not available

* Requires two or more nodes** Planned for 2H10 on 780, 1H11 on 795

All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.

Page 8: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

8

,

Key Evolutionary I/O Technology Transitions

� SCSI to SAS 3.5-inch to SAS 2.5-inch (SFF)

� PCI / PCI-X / PCI-X DDR to PCIe Gen1 to PCIe Gen 2

� RIO/HSL to 12X SDR to 12X DDR

� IBM i : IOP-based to Smart IOA

� New cool Stuff …. SSD, FCoE, ….

Page 9: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

9

I/O Technology Transitions … POWER5 to POWER7

POWER5 POWER6 POWER7

noyes (I/O drawer only**)yesIOP-based adapters

SAS-bay-based

PCIe-basedSAS-bay-based---SSD

SCSI limited

SAS mostly

Some SCSI,

SAS mostly

SCSI mostly,

Some SASDisk

PCI-X (I/O drawer only**)

PCIe

PCI-X

PCIe

PCI-X

---PCI cards

---

12X*

HSL / RIO

12X*

HSL / RIO

---I/O loops

Evolving I/O technologies is to be expected and desired. But as you would also expect, it requires planning to ensure smooth upgrades/migrations.

* 12X loop is either all PCIe or all PCI-X** Power 750 is exception with some PCI-X slots in CEC

Page 10: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

10

IBM i PCI Adapters (as of May 2011)

Y Sept 2010NSSD on PCI adapter

YNFCoE (or FCoEE)

Y

Y with IOP

Y

Y, with IOP

4 Gb

�Y �No 175 MB�Y 1500 MB

�Y �Y 90 MB�Y 1500 MB

2-port & 4-port(SNA only with IOP)

1 Gb & 10 Gb

PCI-X

Y Sept 2010Crypto

No adapter plansInt xSeries Card (IXS)

No adapter plansiSCSI

No plansTwinax

4 Gb & 8 GbFibre Channel

�Yes�Yes 380 MB�SOD 3Q 2011

SAS�Tape/disk 0 cache�Disk medium cache�Disk big cache

�No plans �No plans�No plans

SCSI�Tape/disk 0 cache�Disk medium cache�Disk big cache

2-port(No SNA)

WAN

1 Gb & 10 Gb LRLAN (Ethernet)

PCIeType adapter

All statements regarding IBM's future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.

Page 11: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

11

19-inch POWER7 I/O Drawer Configuration Rules

�If server limited on number of loops, I/O drawer selection can be impacted

12X PCI-X DDRMax 4 per loop

6 slots per drawer

12X PCIe

Max 2 per loop10 slots per drawer

No mixing PCI-X 12X and PCIe 12X on same loop

0720 4-core

1 or 2750

1720 6/8-core

0710 / 730

1 or 2740

2 to 8770 or 780

0755

Max loops POWER7 model

Note:

• No RIO/HSL

• No IOPs (IBM i)

#5802 or 5877

#5802 or 5877

#5796

5714-G30#5796

5714-G30

Page 12: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

12

POWER7 19-inch IO and Storage Drawers

SASAvailableEXP12S SAS Disk Drwr#5886

12XSupportedPCI-X I/O Drwr7314-G30

SCSISupportedEXP24 SCSI Disk Drwr#5786

12XAvailablePCIe I/O Drwr

(No SFF Bays)#5877

SASAvailableEXP24S SAS Disk Drwr#5887

SCSISupportedEXP24 SCSI Disk Drwr

EXP24 SCSI Disk Tower

7031-D24

7031-T24

12XAvailablePCIe I/O Drwr

(w/ SFF Bays)#5802

12XAvailablePCI-X I/O Drwr#5796

InterfaceStatusDescriptionOrder #

� NOTE: no RIO/HSL drawers

Page 13: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

13

I/O: 12X drwr -

adaptorsPOWER6Server

Step 1

Step 2

Apply all pre-

requisites

Step 3

POWER7Server

I/O 12X

attached

Recommended Steps After Selecting POWER7 Model

I/O: HSL/RIO

drwr & adaptors

Bring in

POWER7

Get the I/O

ready

Page 14: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

14

I/O: 12X drwr -

adaptorsPOWER6Server

Step 1 POWER6

Server

I/O: 12X drwr -

adaptors

Recommended Steps

I/O: HSL/RIO

drwr & adaptors

POWER6 system unit I/O• What are you keeping that won’t fit in the future POWER7 system unit?

• Example: 3.5-inch disk drives (POWER7 server = SFF in CEC)

• Example: PCI-X adapters (Most POWER7 servers are PCIe only)

• IVE / HEA differences to consider?POWER6 I/O drawers

• Put I/O from POWER6 server which you are keeping that won’t fit in POWER7 system unit into a 12X I/O drawer

• Move off HSL/RIO I/O drawers – replace with all 12X I/O drawers• Remove all IOPs. Move to all smart PCI adapters.

Get the I/O

ready

This step more limited if you are migrating from a POWER5 server to a POWER6

server. There are no 12X I/O drawers, PCIe slots, SFF disk, etc on a POWER5 server.

Page 15: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

15

POWER7 I/O Upgrade Considerations

� All the newer IBM I/O drawers (12X), disk, SSD and PCI adapters used on POWER6 supported on POWER7 servers (non-Blade statement)

– May need to move 3.5-inch SAS drives and PCI-X adapters

� Older I/O on POWER6 servers, but not on POWER7 servers

– RIO/HSL I/O drawers

– SCSI disk smaller than 69GB or SCSI drives slower than 15k rpm

– QIC tape drives

– IOPs and IOP-based PCI adapters (IBM i)2749, 5702, 5712, 2757, 5581, 5591, 2790, 5580, 5590, 5704, 5761, 2787, 5760, 4801, 4805,

3709, 4746, 4812, 4813

– Older LAN adapters: #5707, 1984, 5718, 1981, 5719, 1982

– Older SCSI adapters: #5776, 5583, 5777

– Telephony adapter: #6412

– See planning web page www.ibm.com/systems/power/hardware/sod2.html

Page 16: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

16

I/O: 12X drwr -

adaptorsPOWER6Server

Step 1 POWER6

Server

I/O: 12X drwr -

adaptors

POWER6

Server

I/O 12X

attachedStep 2

Apply all pre-requisites

i.e. HMC, firmware

and then

OS levels

POWER6Server

I/O 12X

attachedStep 3 POWER7

Server

I/O 12X

attached

Recommended Steps (when you can)

I/O: HSL/RIO

drwr & adaptors

Page 17: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

17

Fibre Channel over Ethernet (Converged Network Adapter)

�Save PCI slots �Save switches�Save space/electrical/cooling�Simplify wiring� Improve flexibility

CEC or I/O drawer

FC Switch

Ethernet

Ethernet and Fibre Channel cables

Ethernet Switch

CEC or I/O drawer

FC

Ethernet cable

Ethernet device / switch

Fibre Channel cable

Fibre Channel (FC) device or FC switch

rack

FCoE Switch

FCoE

Ethernet cables

CEC or I/O drawer

rack

Ethernet cable

Ethernet device / switch or FCoE device / switch

Fibre Channel cable

Fibre Channel (FC) device or FC switch

PCIe adapter - Blade adapter

Page 18: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

18

Upgrades - PEX & Side-by-side RPQ�When you need to run two systems in parallel while upgrading …

–Option A PEX (Power Exchange)• Flexible duration

• Additional software licensing required

• Results in machine with different serial number

–Option B Side-by-Side RPQ• For POWER7 servers with upgrade path & with “roll-in

roll-out” upgrade• 1 - 8 weeks duration

• No additional IBM Power Systems licensing required

Other non IBM Power Systems licensing may be needed

• Results in machine with the same serial number

Done

one server present

STEP 3

Ship original server

back to IBM

STEP 2

Run in parallel, gradually moving

workload to new server

STEP 1Bring in model upgrade or

2nd server

Start

one server present

Page 19: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

19

Thank You from IBM Rochester

Page 20: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

20

Power your planet.Smarter systems for a Smarter Planet.

Page 21: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

21

Power your planet.Smarter systems for a Smarter Planet.

Page 22: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

22

Page 23: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

23

This document was developed for IBM offerings in the United States as of the date of publication. IBM may not make these offerings available in other countries, and the information is subject to change without notice. Consult your local IBM business contact for information on the IBM

offerings available in your area.

Information in this document concerning non-IBM products was obtained from the suppliers of these products or other public sources. Questions

on the capabilities of non-IBM products should be addressed to the suppliers of those products.

IBM may have patents or pending patent applications covering subject matter in this document. The furnishing of this document does not give

you any license to these patents. Send license inquires, in writing, to IBM Director of Licensing, IBM Corporation, New Castle Drive, Armonk, NY 10504-1785 USA.

All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.

The information contained in this document has not been submitted to any formal IBM test and is provided "AS IS" with no warranties or guarantees either expressed or implied.

All examples cited or described in this document are presented as illustrations of the manner in which some IBM products can be used and the results that may be achieved. Actual environmental costs and performance characteristics will vary depending on individual client configurations

and conditions.

IBM Global Financing offerings are provided through IBM Credit Corporation in the United States and other IBM subsidiaries and divisions worldwide to qualified commercial and government clients. Rates are based on a client's credit rating, financing terms, offering type, equipment

type and options, and may vary by country. Other restrictions may apply. Rates and offerings are subject to change, extension or withdrawal without notice.

IBM is not responsible for printing errors in this document that result in pricing or information inaccuracies.

All prices shown are IBM's United States suggested list prices and are subject to change without notice; reseller prices may vary.

IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply.

Any performance data contained in this document was determined in a controlled environment. Actual results may vary significantly and are

dependent on many factors including system hardware configuration and software design and configuration. Some measurements quoted in this document may have been made on development-level systems. There is no guarantee these measurements will be the same on generally-

available systems. Some measurements quoted in this document may have been estimated through extrapolation. Users of this document should verify the applicable data for their specific environment.

Special notices

Page 24: POWER7 Hardware Migration Options - IBM migrate zurich.pdf · POWER7 Hardware Migration Options © 2011 IBM Corporation IBM Power Systems 2 So you decided to move to a POWER7 server

© 2011 IBM Corporation

IBM Power Systems

24

IBM, the IBM logo, ibm.com AIX, AIX (logo), AIX 6 (logo), AS/400, BladeCenter, Blue Gene, ClusterProven, DB2, ESCON, i5/OS, i5/OS (logo), IBM Business Partner

(logo), IntelliStation, LoadLeveler, Lotus, Lotus Notes, Notes, Operating System/400, OS/400, PartnerLink, PartnerWorld, PowerPC, pSeries, Rational, RISC

System/6000, RS/6000, THINK, Tivoli, Tivoli (logo), Tivoli Management Environment, WebSphere, xSeries, z/OS, zSeries, AIX 5L, Chiphopper, Chipkill, Cloudscape,

DB2 Universal Database, DS4000, DS6000, DS8000, EnergyScale, Enterprise Workload Manager, General Purpose File System, , GPFS, HACMP, HACMP/6000,

HASM, IBM Systems Director Active Energy Manager, iSeries, Micro-Partitioning, POWER, PowerExecutive, PowerVM, PowerVM (logo), PowerHA, Power Architecture,

Power Everywhere, Power Family, POWER Hypervisor, Power Systems, Power Systems (logo), Power Systems Software, Power Systems Software (logo), POWER2,

POWER3, POWER4, POWER4+, POWER5, POWER5+, POWER6, POWER6+, System i, System p, System p5, System Storage, System z, Tivoli Enterprise, TME 10,

Workload Partitions Manager and X-Architecture are trademarks or registered trademarks of International Business Machines Corporation in the United States, other

countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols

indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law

trademarks in other countries. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at www.ibm.com/legal/copytrade.shtml

The Power Architecture and Power.org wordmarks and the Power and Power.org logos and related marks are trademarks and service marks licensed by Power.org.

UNIX is a registered trademark of The Open Group in the United States, other countries or both.

Linux is a registered trademark of Linus Torvalds in the United States, other countries or both.

Microsoft, Windows and the Windows logo are registered trademarks of Microsoft Corporation in the United States, other countries or both.

Intel, Itanium, Pentium are registered trademarks and Xeon is a trademark of Intel Corporation or its subsidiaries in the United States, other countries or both.

AMD Opteron is a trademark of Advanced Micro Devices, Inc.

Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc. in the United States, other countries or both.

TPC-C and TPC-H are trademarks of the Transaction Performance Processing Council (TPPC).

SPECint, SPECfp, SPECjbb, SPECweb, SPECjAppServer, SPEC OMP, SPECviewperf, SPECapc, SPEChpc, SPECjvm, SPECmail, SPECimap and SPECsfs are

trademarks of the Standard Performance Evaluation Corp (SPEC).

NetBench is a registered trademark of Ziff Davis Media in the United States, other countries or both.

AltiVec is a trademark of Freescale Semiconductor, Inc.

Cell Broadband Engine is a trademark of Sony Computer Entertainment Inc.

InfiniBand, InfiniBand Trade Association and the InfiniBand design marks are trademarks and/or service marks of the InfiniBand Trade Association.

Other company, product and service names may be trademarks or service marks of others.

Special notices (cont.)