power welfare society
TRANSCRIPT
-
8/14/2019 Power Welfare Society
1/19
POWER WELFARE SOCIETY (PWS)
Established in 2005 under AP Societies Act with anobjective to built residential complex for its members
comprising employees, their friends & relatives from
power sector like POWERGRID, NTPC etc.
Project Envisages construction of flats comprising of
1158/1463/1800/2069/2374/3650 Sft (Super Built
area)
Around 760 members have already joined the project.
Society runs on the concept of no profit no loss basis.
-
8/14/2019 Power Welfare Society
2/19
POWER WELFARE SOCIETY (PWS)
Vacancies are existing in 3 BHK 1800 sft . Membership is offered at the same terms and
conditions of existing members .
Project is being built on 23 % construction area and 77
% Open area in 7.5 acres
Totally 853 Flats of different sizes are planned .
-
8/14/2019 Power Welfare Society
3/19
POWER WELFARE SOCIETY (PWS)
Vacancies are filled at a fixed price close to 2945/- per
sft against present market cost of around Rs 3200/Sft. The above price is possible only due to no profit moto
in our society.
Located in prime area Close to Financial district and
educational institutes like ISB, CBIT, MGIT, Vasavi,IIIT, ESCI.
IT majors like Wipro, Infosys, Microsoft, CA, ICICIbank backend office etc. are with in 10 min drive and
at around 3-4 km distance. Air port which is 18kM away can be reached with in 25
min through ring road.
-
8/14/2019 Power Welfare Society
4/19
Cost Calculations for C2 Flat
Super Built up area 1800 SFT,
Total cost of the flat including amenities and wood work is
59.50 Lakhs ( FixedCost)
Cost Per SFT on Market Terms
Total Cost of flat = 59,50,000
Less Cost of amenities = 5,00,000 (Notional Cost)
Less Cost of Wood work = 1,50,000 (Notional Cost)Net Cost for 1800 SFT = 53,00,000
Cost per SFT = 2945/- per sft (Registration @2.50 Lakhs Extra inc VATApprox or as per actual)
Corpus fund and maintenance charges will be as per actuals and will be
decided at end along with other members
-
8/14/2019 Power Welfare Society
5/19
Cost Comparison w.r.t market for C2
Super Built up area 1800 SFT,
Total cost of the flat including amenities and wood work is
59.50 LakhsCost Per SFT on Market Terms (Assuming 3200 Per sft)
Basic Cost of flat = 3200*1800=57,60,000
Add Cost of amenities = 5,00,000 (Notional Cost)
Add Floor Rise Charges for flat in 19th floor = 1800*150=2,70,000/- ( Assuming
floor rise of Rs.15 per floor above 10th
floor). Only Rs 5/- per sft floor rise above5 th floor onwards in PWS.
Net Cost for 1800 SFT = 65,30,000
Net Saving if you buy from PWS = 65.3 59.5 = 5.8 Lakhs+ add saving inRegistration charges.
(Registration charges in case of PWS is Rs. 2.50 Lakhs, where as with others itis around Rs. 3 to 4 lakhs per flat. Extra)
-
8/14/2019 Power Welfare Society
6/19
Quality is a journey, not a destination.
-
8/14/2019 Power Welfare Society
7/19
Tentative costCost Structure shown in 1stcolumn
Cost in Rs.
(approx)
Plinth Area (Sft) Super Built
up Area
Type of Block
59.50 Lakhs 3 BHK, 1576 sft
25 FLOORS,C2
1800 C-2
CHIOICE OF FLATS IS AVAILABLE WITH EXTRA PRICE IN 3 BHK C-2
With East facing Rs 50/- sft extra and Corner Rs 50/- sft extra. Only Rs5/- per sft floor rise
above 5 th floor onwards in PWS.
F iliti
-
8/14/2019 Power Welfare Society
8/19
Facilities1 Auditorium, GYM. Shopping complex etc
2 Swimming Pool
3 2 level Car Parking, Visitors Parking
4 Outer walls - Double Wall construction with air gap for thermal and acoustic
insulationEnvironment friendly
5 100 % Power Backup system
6 Modular Kitchen, Wardrobes in bed rooms
7 Garbage Disposal System and Centralised Gas Pipeline System8 Commercial Centre
9 Club House providing activities for all Age Groups
10 High Speed Automatic Passenger Lift of Mitsubishi make
11 Tot-Lots, Jogging & Walking Tracks with Greenery around
12 Optical fibre to every flat for voice, data etc.
13 Ample Refuge Area in each tower to facilitate occupants in case of emergency
14 All specifications matching Luxury Living.
S ifi ti
-
8/14/2019 Power Welfare Society
9/19
Specifications1 Foundation and StructureRCC Framed structure to withstand wind and seismic loads as per Zone-III
2 Super Structure-red brick masonry in cement mortar mix3 Plastering
InternalDouble coat plastering 0f 12/16mm thick
ExternalDouble coat sand faced cement plastering 0f 20mm thick
4 Joinery Work:
Main Door: Best teak wood frame & shutter aesthetically designed with melamine matt polish fixed
door eye and standard hardware
Internal Door: Second Class teak wood frames with flush door shutters painted with enamel paint.
UPVC Sliding doors for balconies and factory made PVC/flushed shutters for toilets.
Windows: UPVC sliding glazed windows.
-
8/14/2019 Power Welfare Society
10/19
5 PAINTING:
Internal: Two coats of acrylic emulsion paint OBD over a base coat of primer luppum
External: Premium two coats of quality texture paint/Smooth weather shield paint over base coats of
approved primer.
6 FLOORING:
Master Bedroom: Vitrified tiles of premium quality and reputed make
Bedroom: Vitrified tiles of premium quality and reputed make .
Dining and Drawing Rooms: Vitrified tiles of premium quality.
Kitchen: Vitrified tiles of premium quality.
Toilets: Best Quality anti-skid ceramic tiles.
Common Area: Granite/Marble/Tandore Stone.
-
8/14/2019 Power Welfare Society
11/19
7 Tile Cladding & Dadoing:
Kitchen: Glazed tiles dado up to 2' height above the kitchen platform.
Toilets: Designer glazed ceramic tiles dadoing up to 7' height.
Utility/Wash: Glazed tiles dado up to 3' height.
8 Kitchen:
1. Polished Granite Platform with stainless steel sink with bore water & municipal water connection.
2. modular kitchen .
3. Provision for exhaust chimney.
4. Provision for Aquaguard.
9 Railings:
Stainless steel railing over RCC pardi for balconies and staircases.
10 Sanitary and Plumbing
All Toilets consists of
1.Counter tap washbasin
-
8/14/2019 Power Welfare Society
12/19
10 2.Wall mounted cascade EWC/WC
3.HOT and cold single lever mixer with shower.
4. Provision for geyser & exhaust fan in all toilets.
5. All CP fittings of premium quality from jaquar or equivalent make.
6. All sanitary works shall hindustan ware with all necessary things.
11 Electrical:
1.Concealed copper wiring of standard FRLS wires.
2. Power sockets for air-conditioner in hall & bedrooms.
3. Power sockets for geysers in all rooms.
4. Power Plug for cooking range ,chimney, refrigerator,microwave oven and mixer/grinders in kitchen.
5. Plug points for TV & audio system etc.
6. Adequate lamps and fans for in all the rooms .
7. 3-phase for each unit and individual meter boards.
8.Miniature circuit breakers (MCB) & ELCB for each distribution boards.
-
8/14/2019 Power Welfare Society
13/19
12 Telephone:
Telephone Provision on opticle fiber for Intercom facility in all the units connecting to the security and
also for Telephone .
13 .IP TV
Optional in fiber cable
14 Air-Conditioning:
All the necessary pipe lines and drain lines connections shall be provided for 1.5 split A/C units for the
entire flat.
15 Internet :
High speed internet provision for each flat on fiber optic cable thro BSNL.
16 Lifts:
Automatic passenger lift with V3F-technology. One ton capacity goods lift with V3F-technology for
energy saving. Mitsubishi Japan Make
17 Generator:
100% DG backup with acoustic enclosure.
Plan
-
8/14/2019 Power Welfare Society
14/19
Plan-Type C-2
East
Facing
1576 Sft Built up area,
1800 sft Super Built area
-
8/14/2019 Power Welfare Society
15/19
-
8/14/2019 Power Welfare Society
16/19
POWER WELFARE SOCIETY (PWS)
-
8/14/2019 Power Welfare Society
17/19
POWER WELFARE SOCIETY (PWS)
Why Flats from PWS
1. This Society is formed of, formed for and run byprofessionals from POWERSECTOR and otherProfessional utilities.
2. The objective of the society is welfare of themembers.
3. Flats are built as per plans approved, hence noworry of BPS regulations.
4. All payments to society are by Local /at parcheques, ensuring hassle free transactions
5. Project is already in advanced stage of completionwith targeted completion by Apr 2013 and C2 flats byMar'14.
O SOC ( S)
-
8/14/2019 Power Welfare Society
18/19
POWER WELFARE SOCIETY (PWS)Payment terms:
.
For C2 3BHK, 1800 sft = 70 % payment with inOne month of Joining
= 10 %Payment on completion of brick work
= 10 % Payment on completion of plastering
= 10% For finishing works
Tentative Handing over by Mar 14.
Loans are arranged from SBH, Canara Bank, HDFCetc 80 % (Loan) : 20 % (Margin money)
members have availed loan facility .
-
8/14/2019 Power Welfare Society
19/19
POWER WELFARE SOCIETY (PWS)
For further details please see our web sitewww.pwshyd.com
Contact Marketing Team
A.Ramam- 8125606323- [email protected]
Email : [email protected]
http://www.pwshyd.com/mailto:[email protected]:[email protected]:[email protected]:[email protected]://www.pwshyd.com/