การวางแผนระบบไฟฟา
ว โรจน บัวคล ผ อานวยการกองแผนงานระบบไฟฟา
มถนายน 2556
2
Selection of Distribution Voltage Level
• According to PEA planning criteria, we haveset up economical loading a feeder and loadreach distance as follow
– 8 MVA for 22kV system, No more than 18 km
– 12 MVA for 33kV system, No more than 27 km
• If any customers use load more than 10 MW,we recommend them to move up to 115 kVsystem
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 2/9
3
115kV Extension vs 22kV Extension
5 MW – 20MW
4
115kV Extension vs 33kV Extension
10 – 40 MW
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 3/9
5
Substation Planning
Objective: to find the best solution betweenbuilding new substation and reinforcement of distribution system to serve the future load
The procedure is classified into 2 steps
1. Capacity Analysis
2. Voltage drop and Power losses Analysis
(Support voltage drop)
CAPACITY ANALYSIS
To analyze the capacity of nearby substations in
case of one substation cannot supply load
(outage).
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 4/9
D
E
B
C
A
Note: These substations link together with distribution feeder
Assume Sub A is outage.Nearby substations of Sub A are sub B-E
Thus, All load of Sub A should betransferred to Sub B-E
Case Study : Singha Nakhon Area
Singha Nakhon District
Ranot Substation
Songkhla Substation
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 5/9
Capacity Analysis : Singha Nakhon
Analysis :
Case 1 : SONGKHLA (EGAT) fails- Load 20.5 MW must be transferred to RANOT(EGAT)- Reserved capacity of RANOT (EGAT) is 41.5 MW
- Load of SONGKHLA (EGAT) can be transferred toRANOT (EGAT)
Case 2 : RANOT (EGAT) fails- Load 22.5 MW must be transferred to SONGKHLA(EGAT)- Reserved capacity of SONGKHLA (EGAT) is 45.45 MW- Load of RANOT (EGAT) can be transferred to SONGKHLA
(EGAT)
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 6/9
Voltage drop and Power Losses Analysis
SLA07
SLA03
ROA01
ROA02ROA06
Feeders whichsupply load in thisarea are :
Peak Load of supplied feeder at year 2005
Feeder Peak load(MW)
ROA1 3.15ROA2 4.07ROA6 6.30
SLA3 6.57SLA7 10.53
13.52 MW
17.10 MW
Assume : Songkhla cannot supply load
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 7/9
ROA1
ROA2
ROA6
SLA3
SLA7Voltage at theend of line
Close Tie Switches
and load wassupplied by RANOTSS
Ranot SS
Songkhla SS
Voltage at theend of line
Voltage drop Analysis (2005)
Add a new line(185 SAC)
The voltage drop is improved to :
New line added
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 8/9
Voltage drop Analysis (2011)
Add 2 new lines(185sac) The voltage drop is improved to :
Summarize: Voltage drop Analysis
Add 1 feeder in year 2005
Add 2 feeders in year 2011
7/28/2019 Power System Planning-Example(PEA)
http://slidepdf.com/reader/full/power-system-planning-examplepea 9/9
Plan 1 : SubstationConstruction
Plan 2 : Distribution SystemReinforcement
Cost Plan2/ Cost Plan1 =1.19
Solution : Build New Substation
Economic Comparison between Substation
Construction and Distribut ion System
Reinforcement
ขอขอบคณPEA Smart Grid