  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    1/8

    132PMJ-003

    No.Item

    Description

    Project Name1

    2 Feeder Name

    3 Cable

    4

    Work period5

    Workplace

    6 Joint

    7 Jointer

    8 Remarks

    20 . . . ~ 20 . . .

    PMJ

    Jointer Chief Engineer P M

    / / / /

    Approved

    PMJ(IJB) CHECK LIST

    230kV 1C 2,000 SQMM

    Paya Lebar I ~ Paya Lebar II (F2)

    LS Cable Ltd

    LS Cable Ltd (Power Cable Construction Team)

    Spore NDC 38

    Paya Lebar I S/S (J/B # 1 A /1)

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    2/8

    132PMJ-003

    PhaseHeated

    TemperatureAnnealing Condition

    RemarksStarting time Reached time Heated hour

    R

    Y

    B

    3. Cable Annealing

    Note : Annealing Heating : 853 Hr

    Cooling : above 5 Hr

    Description

    Measured

    Phasing out

    Neggering

    1. Preparation

    Above 10

    2. Material CHECK

    Lot No.

    Rubber Sleeve Insulator PlateBox NoDescription

    R Y B

    R

    Y

    B

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    3/8

    132PMJ-003

    L1 = 380mm

    L2 = 220mm

    L1 = 870mm

    SIDE-A SIDE-B

    50 50 50 50

    5 4321

    50 50 50 50

    1 2 3 45

    4. Cable Stepping

    L3 =

    80mm

    L3

    SIDE

    A

    SIDE

    B

    Surface condition

    of insulator

    (Good or Bad)

    Measured

    Position

    L1

    L2

    1

    L3

    2

    3

    4

    5

    L1

    L2

    1

    L3

    2

    3

    4

    5

    R Y B

    Stepping

    L2 = 220mm

    105mm 105mm

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    4/8

    132PMJ-003

    5. Semi Conductive Painter

    250 950 250

    220 90

    Description

    Cable Cutting(From end of sheath)

    Measured

    SIDE A : 950 mm

    SIDE B : 460 mm

    Exposed Conductor

    SIDE A : 80 mm

    SIDE B : 80 mm

    Remove of OuterSemi-conductive layer

    SIDE A : 220 mm

    SIDE B : 220 mm

    Remove of outerSemi-ConductiveLayers slope

    SIDE A : 80 mm

    SIDE B : 80 mm

    SIDE

    SIDE B

    R Y B

    6. Insert parts

    No.

    1

    2

    3

    4

    5

    6

    SIDE A

    Shrinkable tube

    (No.1175 200A-450L)

    Coffin Box

    Shrinkable tube

    (No.1175 200A-450L)

    Protective casing (A)

    O-Ring

    Insulating flange

    SIDE B Y

    No.

    9

    Description

    Rubber Sleeve

    Checking of inserting parts

    Confirm of direction of SIDE A,SIDE B

    R BYR B

    YR B

    220 40 304058030

    460

    Shrinkable tube

    (No.1175 200A-450L)

    Coffin Box

    Shrinkable tube

    (No.1175 200A-450L)

    Protective casing (B)

    O-Ring

    Shrinkable tube

    (No.1175 350A-900L)

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    5/8

    132PMJ-003

    7.Insert of Rubber Sleeve

    1

    2 5

    L3

    L2

    L1

    3 4

    6

    X Y X Y X Y X Y X Y X Y

    A

    B

    C

    A

    B

    C

    X Y X Y X Y

    A

    B

    C

    A

    B

    C

    1

    PhaseDescription2 6

    Description Phase

    L1 L2 L3

    3 4 5

    Before insert

    Before insert

    After insert

    Remarks

    After insert

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    6/8

    132PMJ-003

    8. Compression of Conductor

    L1 L2

    R

    Y

    B

    R

    Y

    B

    Before

    compression

    After

    compression

    L1 L2 L3 3 4

    Note :Check the dimension, before compression of conductor

    L3

    Corona Shield

    2

    1

    3

    4

    1 2

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    7/8

    132PMJ-003

    9. Rubber Sleeve Setting

    R

    Y

    B

    Drawing Measured Drawing Measured

    D 1 D 2

    Drawing Measured

    L 1

    L2

    L1

    D1 D2

    Teflon tape Markin

    Drawing Measured

    L 2

    10. Supplementary treatment

    Phase

    R

    Y

    B

    Drawing Measured Drawing Measured

    D 1 D 2

    Drawing Measured

    D 3

    Side A Side B

    25 25 10

    D1 D2 D3

  • 8/11/2019 Power Point of Checklist of Ij and Sj Jointing of 230kv Xlpe-lg

    8/8

    132PMJ-003

    11. Earth Connection Check

    Phase Measured meggaring Cross Bonding wire

    R

    Y

    B

    12. Coffin box check

    Phase Sealing of coffin box Filling of compound

    R

    Y

    B