power grid corporation of india ltd. welcomes shri jairam ramesh, hon’ble minister of state for...

82
Power Grid Corporation Of India Ltd. Welcomes Shri Jairam Ramesh, Hon’ble Minister of State for Power, Commerce & Industry to Northern Regional Load Dispatch Center New Delhi

Upload: grant-benson

Post on 29-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

  • Power Grid Corporation Of India Ltd.

    WelcomesShri Jairam Ramesh,Honble Minister of State for Power,Commerce & IndustrytoNorthern Regional Load Dispatch CenterNew Delhi

  • *POWERGRID - NRLDC*Presentation OutlineOverview - Indian Power SystemGrid OperationIndian Electricity Market ABT & UI Settlement SystemShort Term Open AccessTSO vs. ISO

    POWERGRID - NRLDC

  • Overview - Indian Power System

  • *POWERGRID - NRLDC*Spatial Distribution Of Load Source:Powerline(Siemens Ad), Oct-2006

    POWERGRID - NRLDC

  • One Nation One GridNEW GridSouthGridSouthWestNorthEastNortheastFive Regional GridsFive FrequenciesOctober 1991East and Northeast synchronizedMarch 2003West synchronized With East & NortheastAugust 2006North synchronized With Central GridCentral GridINDIA3,287,263 sq. km areaMore than 1 Billion people (2001 census)Installed Capacity of 141.08 GW (Jan-08)

  • *POWERGRID - NRLDC*N-E-W GridSOUTH Grid

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Regional Grids GeographicalInstalled Generation CapacityCurrent: 141,080 MWTarget for Year 2012: 200,000 MWFigures as on 31-Jan-2008

    Inter regional LinkMW capacityNER-ER1,240ER-NR6,020ER-SR1,120ER-WR1,760SR-WR1,680WR-NR2,080Other 132 KV Links200Talcher Kolar HVDC Bipole2,500Total as on date17,000Target for 201237,700

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Diversity Time Generation Resources Load Centers Long Haulage of Power Weather Seasons

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Peculiarities of Regional Grids in IndiaDeficit RegionSnow fed run-of the river hydroHighly weather sensitive loadAdverse weather conditions: Fog & Dust StormVery low loadHigh hydro potentialEvacuation problemsIndustrial load and agricultural loadLow loadHigh coal reservesPit head base load plantsHigh load (40% agricultural load)Monsoon dependent hydroCHICKEN-NECK

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Typical Seasonal Load Curves For Northern Region

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*WINTERMONSOONSUMMEREVENING PEAKTypical Seasonal Load Curves For Southern Region

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*International ConnectionsBhutanTala HEP (1020 MW) 400 KVChukha HEP (336 MW) 220 KVKurichu HEP (60 MW) 132 KVNet import by IndiaNepalOver 16 links of 132/33/11 KVNet export to Nepal (about 10% of Nepals demand)

    POWERGRID - NRLDC

  • SYNCHRONOUS INTERCONNECTION WITH BHUTAN2 x 139 + 2 x 144 kms. of400 kV lines in BhutanSnapshot from National Power System DeskTALA HEP 1020 MW (6x170 MW)(BHUTAN)DELHIBARELILUCKNOWUNNAOGORAKHPURMUZAFFARPURPURNEABINAGURIEASTERN GRIDNORTHERN GRID3200 CIRCUIT KILOMETERS TALA TRANSMISSION SYSTEM

  • Grid Operation

  • *POWERGRID - NRLDC*A Typical Dispatch FIRM SHARES IN ISGS

    BILATERAL CONTRACTSSurpluses/Deficits - Balance supply and demandHoursMW

    123456789101112131415161718192021222324

    3634323028262422

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Operated as loose power poolsStates have full operational autonomyState power system treated as notional (flexible) control areaVery tight control of actual interchange by state utilities & Inter State Generating Stations not mandatedDeviations from net drawal schedules appropriately pricedRegional Grid Operation: Philosophy

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*

    POWERGRID - NRLDC

  • DAILY OPERATIONAL CHALLENGESFLOATING FREQUENCY: 49 - 50.5 HzVOLTAGE VARIATIONS: 380- 430 kVHIGH RAMP RATEBI-DIRECTIONAL LINE FLOWS

  • *POWERGRID - NRLDC*REAL TIME OPERATIONREAL TIME OPERATION STANDS ON TWO FIRM FOOTINGSIEGC THE INDIAN ELECTRICITY GRID CODEABT AVAILABILITY BASED TARIFF

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONSEx-ante functionsSchedulingReal-time functionsSupervision & control of system parametersFacilitating Open Access transactionsPost-facto functionsSettlement system operationInteraction with stakeholders

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONS EX-ANTE Demand Estimation and Forecasting Resource Scheduling Grid element Outage PlanningOpen Access transmission corridor reservations

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONS REAL-TIME Resource re-scheduling Implementation of contractsSupervision & Control of system parametersReal-time balancingEnsuring grid security & reliabilityOutage CoordinationEnsuring power qualityLoss minimization & resource optimizationTackling Emergencies

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*GRID MANAGEMENT FUNCTIONS POST FACTO Event Information & ReportingSequence of Event Analysis & ReplayEnergy meter data collection Data processingEnergy accountingPool Account operationUnscheduled Interchange accountReactive Energy Account

    POWERGRID - NRLDC

  • Indian Electricity Market

  • *POWERGRID - NRLDC*Development of the Power Market in IndiaDevelopment of the Power Market Section 66, IE Act 2003National Electricity Policy, 12-Feb-2005, Para 5.7.1(d)Implementation of Inter-State ABT : 2002-03Metering, Scheduling and SettlementIntroduction of Open Access in Inter State Transmission : May 2004Development of PXStaff paper by CERC : July 2006Public hearing : December 2006Guidelines for setting up PX : February 2007Approval for setting up first PX : MCX, August 2007

  • *POWERGRID - NRLDC*BuyerSellerRegional Electricity Market in IndiaLong term contractsTSOPhysical deliveryPhysical Off takeDaily Delivery CommitmentDaily off-take commitmentPool AccountWeekly settlementOperated bySystem OperatorBuyerSellerUI UI Transmission ChargesAvailability & Energy ChargesShort term ContractGridLong term transmission contracts

  • *POWERGRID - NRLDC*DECENTRALIZED SCHEDULINGAvailability DeclarationEntitlementsSLDC

    Requisition & Bilateral AgreementsInjection ScheduleDrawal ScheduleRevision in DCRevision in RequisitionFinalInjection ScheduleFinalDrawal ScheduleRLDCISGSTimeRevisions duringCurrent dayRevisions duringCurrent day0 to 24 hours

    10:00 11:0015:0017:0022:0023:00

  • ABT & UI Settlement System

  • *POWERGRID - NRLDC*Settlement System ABT & UIABT is a scientific settlement system for contracted sale & purchase of powerHas three componentsFixed Charges or capacity chargeLinked to day-ahead declared availability/subscriptionVariable Charges or fuel chargesLinked to before the fact energy schedulesCharges for deviation from commitments

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Settlement System ABT & UIFrequency actuated signalSignal transmitted at the speed of dynamics to be controlledReal time pricing stretched to its physical limitsMerit orderEconomic load managementIncentives for helping the gridOpportunities for a diligent playerSimple, dispute-free weekly settlement system

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*UI mechanismMaximizes social welfareTransparent, neutral & rigging proofDiffuses market power Ultimate open accessFacilitates reforms in the sectorEncourages trade and bilateral exchangesFacilitates exchanges (arbitrage) between regional power pools

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*ADVANTAGES ABT & UIInculcates self discipline among participantsIncentives to those who help the gridDisincentives to those who harm the gridIs scientific commercial mechanismBrings in economy and efficiencyAchieves natural merit order in generationConducive for competition in power sectorProvides platform for power market to flourish

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*The End Result .Frequency is collectively controlleddemocratically stabilizedWholesale market is workably competitive allocative efficiencyproductive efficiencyEconomic signal available for optimum utilization of resource investments in generation capacitySettlement isstreamlined dispute-free

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Balancing market guiding vectorDeficitSurplusNormal Band (IEGC)

  • *POWERGRID - NRLDC*Time Line For SettlementSettlement weekMonday 0000 Sunday 2400Tuesday2400Meter Data download & receipt at RLDC & preliminary checksThursday 1200Data validation, processing and computation at RLDC. Forwarded to Regional Power Committee SecretariatSaturday2400Data cross checking by Regional Power Committee Secretariat & Issue of Pool Account

    Unscheduled Interchange Account Reactive Energy AccountTuesday2400Payment by utilities to the pool account managed by System Operator (RLDC)Tuesday2400Friday 2400Disbursement to utilities from the pool accountThree day grace periodFor Bank processing0.04 % per day interest on defaultersAccount Settled within 21 days Monday 2400

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Metering System

    Meter LocationsNo. of Meters

    North1941098East98419West85421Southern85463North East55201All India5172602

    POWERGRID - NRLDC

  • Open Access

  • OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003Section 2 (47) Open access means the non-discriminatory provision for the use of transmission lines or distribution system or associated facilities with such lines or system by any licensee or consumer or a person engaged in generation in accordance with the regulations specified by the Appropriate Commission;

    POWERGRID - NRLDC

  • CERC Open Access Regulations, 20083. Subject to any other regulations specified by the Commission, the long-term customer shall have first priority for using the inter-State transmission system for the designated use. These Regulations shall apply for utilization of surplus capacity available thereafter on the inter-State transmission system by virtue of-(a) Inherent design margins; (b) Margins available due to variations in power flows; and (c )Margins available due to in-built spare transmission capacity created to cater to future load growth or generation addition:

    POWERGRID - NRLDC

  • Transmission CapacityIs a coordinated exerciseTransmission system developed asGeneration linked Associated Transmission SystemInter-regional schemesGrid strengthening schemesBeneficiaries identified aprioriTransmission system can be constructed only with commitmentN-1 criterion adoptedOptimum capacityInherent design margin available in the transmission systemTo accommodate the variation of 15% unallocated powerSkewed dispatch scenariosActual margins available in the systemGeneration outages, unbalanced load growthLaws of physics prevail

    POWERGRID - NRLDC

  • Transmission Capacity vs Transfer Capability

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Total Transfer CapabilityThermal LimitStability LimitTotal Transfer CapabilityTotal Transfer Capability is the minimum of the Thermal Limit, Voltage Limit and the Stability LimitTime Power Flow

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Total & Available Transfer CapabilityATC = TTC TRM CBM Transfer Reliability Margin (TRM)Capacity Benefit Margin (CBM)Long Term Open Access (LTOA)Short Term Open Access (STOA)TTCATC

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*OPEN ACCESS IN INTER-STATE TRANSMISSIONImplemented w.e.f. 6-May-2004Products Long term AccessShort term AccessMonthlyAdvanceFirst Come First ServeDay ahead Intra day transactionsPermits usage of spare transmission capacity through a transparent processOffers choice and freedom to buy & sell power

    POWERGRID - NRLDC

  • CERC Open Access Regulations, 2008Effective 01.04.2008Regulations cover only Short-term Open AccessTransactions categorized as Bilateral and Collective (through PX)Earlier Products of Short-Term retained under Bilateral TransactionsNodal AgencyBilateral : RLDCsCollective : NLDC

    POWERGRID - NRLDC

  • *POWERGRID - NRLDC*Time Line For Open AccessM1M2M3M4DLDL-5DL-10DL+5DOPDOP-1DOP-4Adv Application for M2Adv Application for M3, Approvals for M2Adv Application for M4,Approvals for M3Approvals for M4FCFSDay Ahead / PX LEGEND: DOP : Day of Operation DL : Last day of M1New Open Access Regulations w.e.f. 01-April-2008

    POWERGRID - NRLDC

  • Short-Term Open Access transactionby Captive Power Plant

    A typical example:From : SAIL Durgapur Steel Plant (DVC),ERTo: SAIL Bhilai Steel Plant (CSEB),WRQuantum: 20 MWSource : SAIL

    POWERGRID - NRLDC

  • DSP/ASP CPP(2*60 MW)DVCER ISTSWR ISTSCSEBSellerCo-ordination for Scheduling, Settlement & System Operation bySeam ChangesSLDC-DVCERLDCWRLDCSLDC-ChattisgarhBSPBuyerNETWORK INVOLVED

    POWERGRID - NRLDC

  • BSP2.466 Rs/kwhWR ISTSTSC+SOC=0.034 RsCSEBTSC+SOC=0.034 RsDSP2.33 Rs/kwhDVCTSC +SOC =0.034 RsER ISTSTSC+SOC= 0.034 Rs2.364Rs/kwh2.398Rs/kwh2.432Rs/kwhTransmission & System Operation Charges

    POWERGRID - NRLDC

  • DSP20MWBSP17.03MWDVC2.82% Loss ER ISTS3.5% Loss WR ISTS5.5% LossCSEB3.93% Loss19.44MW18.76MW17.73MWTransmission Losses

    POWERGRID - NRLDC

  • Transparency - Information Sharing Available Transfer Capacity (ATC) -3 months aheadPast & Current TransactionsInjection & Drawal SchedulesUn-requisitioned SurplusFrequency TrendUrgent market information unit tripping, load crash, contingencies52 week ISTS pooled lossesSTOA Rate / Procedures for capacity reservation much more on RLDCs websites

    POWERGRID - NRLDC

  • Trade under Short-Term Open Access

    POWERGRID - NRLDC

    Chart1

    86936

    33776

    4120

    10175

    Installed Capacity (as on 31.07.2007)

    Chart2

    45906

    70682

    18418

    Sheet1

    Thermal86936Central Sector45906

    Hydro33776State Sector70682

    Nuclear4120Pvt. Sector18418

    Other-Wind & Renewable10175

    Chart3

    16.641778

    22.5263938

    23.5985933

    29.839560

    &A

    Page &P

    Volume of trade (BUs)

    No. of transactions

    Energy (BUs) ----->

    Number of Transactions ---->

    Sheet2

    2004-052005-062006-072007-08

    Volume of trade (BUs)16.64122.52623.59829.83

    No. of transactions778393859339560

    778393859339000

    Sheet3

  • POWERGRID - NRLDC

    Chart1

    502382447

    471572093

    510961736

    498751671

    520601695

    506351901

    515962320

    519801997

    515722276

    544642032

    503572092

    526101998

    536931987

    482881787

    554051836

    544362141

    570323107

    542782421

    556012989

    573613027

    541292561

    567722769

    535722402

    548082604

    ALL INDIA ENERGY MET (MU)

    Open Access(MU)

    Open Access Share - 3-6%

    ENERGY MET

    ENERGY APPROVED UNDERSTOA

    Energy Met(MUs)--->

    Open Access (MUs)--->

    Open Access vis-a-vis Energy Met

    Chart3

    5023824474.870814921

    4715720934.4383654601

    5109617363.3975262251

    4987516713.3503759398

    5206016953.2558586247

    5063519013.7543201343

    5159623204.4964725948

    5198019973.8418622547

    5157222764.4132474986

    5446420323.7309048179

    5035720924.1543380265

    5261019983.7977570804

    5369319873.700668616

    4828817873.7007123923

    5540518363.3137803447

    5443621413.9330590051

    5703231075.4478187684

    5427824214.4603706843

    5560129895.3758025935

    5736130275.277104653

    5412925614.7312900663

    5677227694.8774043543

    5357224024.4836855074

    5480826044.7511312217

    &A

    Page &P

    Chart2

    4.870814921

    4.4383654601

    3.3975262251

    3.3503759398

    3.2558586247

    3.7543201343

    4.4964725948

    3.8418622547

    4.4132474986

    3.7309048179

    4.1543380265

    3.7977570804

    3.700668616

    3.7007123923

    3.3137803447

    3.9330590051

    5.4478187684

    4.4603706843

    5.3758025935

    5.277104653

    4.7312900663

    4.8774043543

    4.4836855074

    4.7511312217

    4.0550742352

    3.7636239782

    3.8163047348

    %of Energy Approved (STOA) vs Energy Met

    Short Term Open Access Market Share

    Sheet1

    ALL INDIA ENERGY MET Vs APPROVED ENERGY UNDER STOA

    ENERGY MET (MU)ENERGY APPROVED UNDER STOA(MU)% TOTAL ENERGY MET

    JAN'065023824474.9

    FEB'064715720934.4

    MAR'065109617363.4

    APR'064987516713.4

    MAY'065206016953.3

    JUNE'065063519013.8

    JULY'065159623204.5

    AUG'065198019973.8

    SEP'065157222764.4

    OCT'065446420323.7

    NOV'065035720924.2

    DEC'065261019983.8

    JAN'075369319873.7

    FEB'074828817873.7

    MAR'075540518363.3

    APR'075443621413.9

    MAY'075703231075.4

    JUNE'075427824214.5

    JULY'075560129895.4

    AUG'075736130275.3

    SEP'075412925614.7

    OCT'075677227694.9

    NOV'075357224024.5

    DEC'075480826044.8

    JAN'085563422564.1

    FEB'085284819893.8

    MAR'085618021443.8

    AVG. % SHARE OF STOA4.2

    Sheet2

    ENERGY MET

    Sheet3

  • Introduction of Day-Ahead Productfrom April,2005

    POWERGRID - NRLDC

    NO.OF TRANS.(LINE)

    APRIL36253724

    67114239593

    69142352489

    59194437441

    69436484755

    76260527601

    60244484838

    58372628831

    707447831003

    81648747JAN

    YEAR'04-05

    YEAR'05-06

    YUEAR'06-07

    YEAR'07-08

    MONTHS

    NO. OF TRANSACTIONS

    TOTAL STOA TRANSACTIONS

    TOTAL TRANS.

    67

    69

    59

    69

    76

    60

    58

    70

    81

    88

    81

    36

    114

    142

    194

    436

    260

    244

    372

    744

    648

    398

    350

    253

    239

    352

    437

    484

    527

    484

    628

    783

    747

    463

    536

    724

    593

    489

    441

    755

    601

    838

    831

    1003

    1016

    1108

    944

    NO. OF TRANSACTIONS

    TOTAL TRANSACTIONS ( 2004-08)

    NO.OFTRANS.

    YEAR WISE LINE GRAPHTOTAL NO. OF TRANSACTIONS.

    CONTINOUS LINE GRAPH

    YEAR'04YEAR'05YEAR'06YEAR'07

    APRIL36253724MAY'0467

    MAY67114239593JUNE69

    JUNE69142352489JULY59

    JULY59194437441AUG'0469

    AUG69436484755SEPT76

    SEP76260527601OCT60

    OCT60244484838NOV'0458

    NOV58372628831DEC70

    DEC707447831003JAN'0581

    JAN816487471014FEB'0588

    FEB88398463MAR81

    MAR81350536APRIL36

    MAY'05114

    JUNE142

    JULY194

    AUG'05436

    SEP260

    OCT244

    NOV'05372

    DEC744

    JAN648

    FEB'06398

    MAR350

    APRIL253

    MAY'06239

    JUNE352

    JULY437

    AUG'06484

    SEP527

    OCT484

    NOV'06628

    DEC783

    JAN747

    FEB'06463

    MAR536

    APRIL724

    MAY'07593

    JUNE489

    JULY441

    AUG'07755

    SEP601

    OCT838

    NOV'07831

    DEC1003

    JAN'081016

    FEB'081108

    MAR944

    ENERGY APPR

    1405

    1060

    1569

    1943

    1968

    1119

    1451

    1716

    1434

    1444

    1332

    1091

    1528

    1647

    1699.5

    1943.2

    2095.5

    1818.6

    1915.1

    2511.3

    2447.3

    2093.3

    1736.6

    1671.8

    1696

    1901

    2321

    1997

    2277

    2032

    2093

    1998

    1988

    1787

    1836.7

    2141.3

    2672

    2421

    2989

    3027

    2562

    2769

    2422

    2605

    2258

    1989

    MARCH'08

    STOA ENERGY APPROVED(MU)YEAR 2004-07

    MUs

    ENERGY( CONTINOUS LINE GRAPH)

    YEAR WISE LINE GRAPH

    MAY '041405YEAR'04YEAR'05YEAR'06YEAR'07

    JUNE'041060

    JULY'041569APR109116722141

    AUG'041943MAY1405152816962672

    SEP1968JUNE1060164719012421

    OCT1119JULY1569170023212989

    NOV'041451AUG1943194319973027

    DEC1716SEP1968209622772562

    JAN '051434OCT1119181920322769

    FEB'051444NOV1451191520932422

    MARCH1332DEC1716251119982605

    APRIL'051091JAN143424471988

    MAY'051528FEB144420931787

    JUNE1647MAR133217371837

    JULY1700

    AUG'051943

    SEP2096

    OCT1819

    NOV'051915

    DEC2511

    JAN'062447

    FEB'062093

    MARCH1737

    APRIL '061672

    MAY'061696

    JUNE1901

    JULY2321

    AUG'061997

    SEP2277

    OCT2032

    NOV'062093

    DEC1998

    JAN'071988

    FEB'071787

    MARCH1837

    APRIL'072141

    MAY'072672

    JUNE2421

    JULY2989

    AUG'073027

    SEP2562

    OCT2769

    NOV'072422

    DEC'072605

    JAN'082258

    FEB'081989

    MARCH'08

    ENERGY(BAR)

    APR10911671.82141.3

    1405152816962672

    1060164719012421

    15691699.523212989

    19431943.219973027

    19682095.522772562

    11191818.620322769

    14511915.120932422

    17162511.319982605

    14342447.31988JAN

    14442093.31787FEB

    13321736.61836.7MAR

    YEAR'04-05

    YEAR'05-06

    YER'06-07

    YEAR'07-08

    MONTHS

    MU

    ENERGY APPROVED

    DIFF TRANS

    188332405

    616308537

    316274361

    SAME DAY

    FCFS

    ADVANCE

    NO. OF RANSACTIONS

    STOA TRANSACTIONS

    DIFF TYPE OF TRANS

    SAME DAYDAY AHEADFCFSADVANCE

    YEAR'05-061883013332405

    YEAR'06-076164472308537

    YEAR'07-083165324274361

    RLDC WISE BAR GRAPH

    10125.710561.2772623444

    1088796322100631346

    139546287292242522

    NRLDC

    WRLDC

    SRLDC

    ERLDC

    NERLDC

    RLDC WISE ENERGY(MU) APPROVED

    RLDC WISE LINE GRAPH

    21061140223

    44488548118

    7257853696

    1113531490

    1261613630

    1142889610

    7191049490

    864951360

    11301268370

    11231268370

    88896071100

    50482894233

    44379573334

    58179077219

    1045790531.2

    13458905628.8

    1454476670

    105410828941

    788116259.60

    817116041.57.4

    9918219.2104

    111561318.6195.8

    81851133384

    43353853784

    89542965741

    135381850450

    184737052152

    232948837135

    240142816183

    164074722153

    1190124617316

    117889756290

    1122865110501

    NRLDC

    WRLDC

    ERLDC

    SRLDC

    RLDC WISE ENERGY APPROVED(MU)

    WR ENERGY

    611795429

    885790818

    785790370

    531890488

    613476428

    8891082747

    104911621246

    9511160897

    1268821865

    1268613JAN

    960511FEB

    828538MAR

    WESTERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    SR ENERGY

    223334741

    118219450

    961.2152

    028.8135

    00183

    041153

    00316

    07.4290

    0104501

    0195.8JAN

    100384FEB

    233784MAR

    SOUTHERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    ER ENERGY

    407365

    487750

    365352

    495637

    636716

    618922

    4959.617

    3641.556

    379.2110

    3718.6JAN

    7133FEB

    9453MAR

    EASTERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    NR ENERGY

    210443895

    4445811353

    72510451847

    111313452329

    126114542401

    114210541640

    7197881190

    8648171178

    11309911122

    11231115JAN

    888818FEB

    504433MAR

    NORTHEN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    RLDC WISE MU

    (CONTINOUS LINE GRAPH)

    ENERGY APPROVED RLDC WISEBAR GRAPH

    NRLDCWRLDCSRLDCERLDCNERLDCNRLDCWRLDCSRLDCERLDCNERLDC

    APRIL'05210611223407YEAR'05-0610125.710561.2772623444

    MAY'054448851184833

    JUNE'0572578596365YEAR'06-071088796322100631346

    JULY11135310496.5

    AUG'0512616130635.4YEAR'07-08139546287292242522

    SEP11428890612

    OCT'0571910490490.9

    NOV'0586495103663.1

    DEC'051130126803775.4

    JAN'061123126803798.8NRLDCYEAR 05-06YEAR 06-07YEAR 07-08

    FEB'068889601007171.2

    MARCH5048282339475.6APRIL

    APRIL '064437953347326MAY

    MAY'065817902197726JUNE

    JUNE'0610457901.25310JULY

    JULY134589028.8560AUG

    AUG'0614544760670SEP

    SEP1054108241899.9OCT

    OCT'067881162059.622NOV

    NOV'0681711607.441.566.2DEC

    DEC'069918211049.271.8JAN

    JAN'071115613195.818.645FEB

    FEB'078185113843340MAR

    MARCH4335387845328

    APRIL'078954297416511

    MAY'071353818450502

    JUNE'071847370152520

    JULY2329488135370

    AUG'072401428183160

    SEP1640747153220

    OCT'0711901246316172

    NOV'071178897290560

    DEC'0711228655011107

    JAN

    FEB'08

    MARCH'08

    07-08

    14386

    9224

    YEAR 2007-08 (Upto DEC'07)

    06-07

    16377

    7219

    YEAR 2006-07

    05-06

    16534.9

    5991

    YEAR 2005-06

    INTER-INTRA

    NRLDC(TOTAL)INTERINTRAWRLDC(TOTAL)INTERINTRASRLDC(TOTAL)INTERINTRAERLDC(TOTAL)INTERINTRANERLDC(TOTAL)INTERINTRATOTALINTERINTRA

    YEAR'05-0610125.75851.7427410561.210180.238177212664662310751644427017422525.916534.95991

    INTERINTRA

    YEAR'06-07108876361452696329194438210061114896318754434612422223596163777219

    INTERINTRA

    YEAR'07-08139547856609862875409878292283420884252691562218423610143869224

    Chart1

    11264157917442000

    0.04166666671264157917442000

    0.08333333331264157917442000

    0.1251264157917442000

    0.16666666671264157917442000

    0.20833333331264157917442000

    0.251264132913462000

    0.29166666671264132913462000

    0.33333333331264132913462000

    0.3751264132913462000

    0.41666666671264148915062000

    0.45833333331264148915062000

    0.51264148915062000

    0.54166666671264148915062000

    0.58333333331264148915062000

    0.6251264148915062000

    0.66666666671264148915062000

    0.70833333331285131013271750

    0.751285131013271750

    0.79166666671285131013271750

    0.83333333331285131013271750

    0.8751285131013271750

    0.91666666671285131013271750

    0.95833333331285135015151750

    241264132914942000

    MARGIN AVIALIABLE

    WR-NRSTOA APPROVED

    ER-NRSTOA APPROVED

    LTOA

    TOTAL ATC

    LTOA

    ER-NR STOA APPR.

    WR-NR STOA APPR.

    MARGIN AVAILABLE

    ATC & MARGIN AVAILABLE FOR IMPORT(MW) TO NORTHEN REGION IN FEB'08

    Chart3

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166123612492240

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611792200

    MARGIN AVAILABLE

    LTOA

    ER-NR STOA APPROVED

    WR-NR STOA APPROVED

    ATC & MARGIN AVAILABLE FOR IMPORT TO NORTHEN REGION IN MARCH'08

    Sheet1

    FEBRUARY

    TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINKMARGIN AVAILABLE

    0:001264157917442000256315165256

    1:001264157917442000256315165256

    2:001264157917442000256315165256

    3:001264157917442000256315165256

    4:001264157917442000256315165256

    5:001264157917442000256315165256

    6:0012641329134620006546517654

    7:0012641329134620006546517654

    8:0012641329134620006546517654

    9:0012641329134620006546517654

    10:00126414891506200049422517494

    11:00126414891506200049422517494

    12:00126414891506200049422517494

    13:00126414891506200049422517494

    14:00126414891506200049422517494

    15:00126414891506200049422517494

    16:00126414891506200049422517494

    17:0012851310132717504232517423

    18:0012851310132717504232517423

    19:0012851310132717504232517423

    20:0012851310132717504232517423

    21:0012851310132717504232517423

    22:0012851310132717504232517423

    23:00128513501515175023565165235

    0:00126413291494200050665165506

    MARCH

    TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINK

    0:0011661166117922001021013

    1:0011661166117922001021013

    2:0011661166117922001021013

    3:0011661166117922001021013

    4:0011661166117922001021013

    5:0011661166117922001021013

    6:0011661166117922001021013

    7:0011661166117922001021013

    8:0011661166117922001021013

    9:0011661236124922409917013

    10:0011661236124922009517013

    11:0011661236124922009517013

    12:0011661236124922009517013

    13:0011661236124922009517013

    14:0011661236124922009517013

    15:0011661236124922009517013

    16:0011661236124922009517013

    17:0011661236124922009517013

    18:001166116611791800621013

    19:001166116611791800621013

    20:001166116611791800621013

    21:001166116611791800621013

    22:001166116611791800621013

    23:001166116611791800621013

    0:0011661166117922001021013

  • POWERGRID - NRLDC

    NO.OF TRANS.(LINE)

    APRIL36253724

    67114239593

    69142352488

    59194437484

    69436484756

    76260527603

    60244484867

    58372628848

    707447831080

    81648747JAN

    YEAR'04-05

    YEAR'05-06

    YUEAR'06-07

    YEAR'07-08

    MONTHS

    NO. OF TRANSACTIONS

    TOTAL STOA TRANSACTIONS

    TOTAL TRANS.

    67

    69

    59

    69

    76

    60

    58

    70

    81

    88

    81

    36

    114

    142

    194

    436

    260

    244

    372

    744

    648

    398

    350

    253

    239

    352

    437

    484

    527

    484

    628

    783

    747

    463

    536

    724

    593

    489

    441

    755

    601

    838

    831

    1003

    JAN

    FEB

    MAR

    MONTHS

    NO. OF TRANSACTIONS

    TOTAL STOA TRANSACTIONS

    NO.OFTRANS.

    YEAR WISE LINE GRAPHTOTAL NO. OF TRANSACTIONS.

    CONTINOUS LINE GRAPH

    YEAR'04YEAR'05YEAR'06YEAR'07

    APRIL36253724MAY'0467

    MAY67114239593JUNE69

    JUNE69142352488JULY59

    JULY59194437484AUG'0469

    AUG69436484756SEPT76

    SEP76260527603OCT60

    OCT60244484867NOV'0458

    NOV58372628848DEC70

    DEC707447831080JAN'0581

    JAN816487471072FEB'0588

    FEB883984631101MAR81

    MAR81350536944APRIL36

    MAY'05114

    JUNE142

    JULY194

    AUG'05436

    SEP260

    OCT244

    NOV'05372

    DEC744

    JAN648

    FEB'06398

    MAR350

    APRIL253

    MAY'06239

    JUNE352

    JULY437

    AUG'06484

    SEP527

    OCT484

    NOV'06628

    DEC783

    JAN747

    FEB'06463

    MAR536

    APRIL724

    MAY'07593

    JUNE489

    JULY441

    AUG'07755

    SEP601

    OCT838

    NOV'07831

    DEC1003

    JAN

    FEB

    MAR

    ENERGY APPR

    1405

    1060

    1569

    1943

    1968

    1119

    1451

    1716

    1434

    1444

    1332

    1091

    1528

    1647

    1699.5

    1943.2

    2095.5

    1818.6

    1915.1

    2511.3

    2447.3

    2093.3

    1736.6

    1671.8

    1696

    1901

    2321

    1997

    2277

    2032

    2093

    1998

    1988

    1787

    1836.7

    2141.3

    2672

    2421

    2989

    3027

    2562

    2769

    2422

    2605

    2258

    1989

    2144

    Month---->

    Approved Energy (MUs)------->

    ENERGY APPROVED(MUs)- 2004-08

    ENERGY(BAR)

    APR10911671.82141.3

    1405152816962672

    1060164719012421

    15691699.523212989

    19431943.219973027

    19682095.522772562

    11191818.620322769

    14511915.120932422

    17162511.319982605

    14342447.31988JAN

    14442093.31787FEB

    13321736.61836.7MAR

    YEAR'04-05

    YEAR'05-06

    YER'06-07

    YEAR'07-08

    MONTHS

    MU

    ENERGY APPROVED

    MUs

    ENERGY( CONTINOUS LINE GRAPH)

    YEAR WISE LINE GRAPH

    MAY '041405YEAR'04YEAR'05YEAR'06YEAR'07

    JUNE'041060

    JULY'041569APR109116722141

    AUG'041943MAY1405152816962672

    SEP1968JUNE1060164719012421

    OCT1119JULY1569170023212989

    NOV'041451AUG1943194319973027

    DEC1716SEP1968209622772562

    JAN '051434OCT1119181920322769

    FEB'051444NOV1451191520932422

    MARCH1332DEC1716251119982605

    APRIL'051091JAN143424471988

    MAY'051528FEB144420931787

    JUNE1647MAR133217371837

    JULY1700

    AUG'051943

    SEP2096

    OCT1819

    NOV'051915

    DEC2511

    JAN'062447

    FEB'062093

    MARCH1737

    APRIL '061672

    MAY'061696

    JUNE1901

    JULY2321

    AUG'061997

    SEP2277

    OCT2032

    NOV'062093

    DEC1998

    JAN'071988

    FEB'071787

    MARCH1837

    APRIL'072141

    MAY'072672

    JUNE2421

    JULY2989

    AUG'073027

    SEP2562

    OCT2769

    NOV'072422

    DEC'072605

    JAN'082258

    FEB'081989

    MARCH'082144

    DIFF TRANS

    188332405

    616308537

    316274361

    SAME DAY

    FCFS

    ADVANCE

    NO. OF RANSACTIONS

    STOA TRANSACTIONS

    DIFF TYPE OF TRANS

    SAME DAYDAY AHEADFCFSADVANCE

    YEAR'05-061883013332405

    YEAR'06-076164472308537

    YEAR'07-084378237392494

    RLDC WISE BAR GRAPH

    10125.710561.2772623444

    1088796322100631346

    139546287292242522

    NRLDC

    WRLDC

    SRLDC

    ERLDC

    NERLDC

    RLDC WISE ENERGY(MU) APPROVED

    RLDC WISE LINE GRAPH

    21061140223

    44488548118

    7257853696

    1113531490

    1261613630

    1142889610

    7191049490

    864951360

    11301268370

    11231268370

    88896071100

    50482894233

    44379573334

    58179077219

    1045790531.2

    13458905628.8

    1454476670

    105410828941

    788116259.60

    817116041.57.4

    9918219.2104

    111561318.6195.8

    81851133384

    43353853784

    89542965741

    135381850450

    184737052152

    232948837135

    240142816183

    164074722153

    1190124617316

    117889756290

    1122865110501

    NRLDC

    WRLDC

    ERLDC

    SRLDC

    RLDC WISE ENERGY APPROVED(MU)

    WR ENERGY

    611795429

    885790818

    785790370

    531890488

    613476428

    8891082747

    104911621246

    9511160897

    1268821865

    1268613JAN

    960511FEB

    828538MAR

    WESTERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    SR ENERGY

    223334741

    118219450

    961.2152

    028.8135

    00183

    041153

    00316

    07.4290

    0104501

    0195.8JAN

    100384FEB

    233784MAR

    SOUTHERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    ER ENERGY

    407365

    487750

    365352

    495637

    636716

    618922

    4959.617

    3641.556

    379.2110

    3718.6JAN

    7133FEB

    9453MAR

    EASTERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    NR ENERGY

    210443895

    4445811353

    72510451847

    111313452329

    126114542401

    114210541640

    7197881190

    8648171178

    11309911122

    11231115JAN

    888818FEB

    504433MAR

    NORTHEN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    RLDC WISE MU

    (CONTINOUS LINE GRAPH)

    ENERGY APPROVED RLDC WISEBAR GRAPH

    NRLDCWRLDCSRLDCERLDCNERLDCNRLDCWRLDCSRLDCERLDCNERLDC

    APRIL'05210611223407YEAR'05-0610125.710561.2772623444

    MAY'054448851184833

    JUNE'0572578596365YEAR'06-071088796322100631346

    JULY11135310496.5

    AUG'0512616130635.4YEAR'07-08139546287292242522

    SEP11428890612

    OCT'0571910490490.9

    NOV'0586495103663.1

    DEC'051130126803775.4

    JAN'061123126803798.8NRLDCYEAR 05-06YEAR 06-07YEAR 07-08

    FEB'068889601007171.2

    MARCH5048282339475.6APRIL

    APRIL '064437953347326MAY

    MAY'065817902197726JUNE

    JUNE'0610457901.25310JULY

    JULY134589028.8560AUG

    AUG'0614544760670SEP

    SEP1054108241899.9OCT

    OCT'067881162059.622NOV

    NOV'0681711607.441.566.2DEC

    DEC'069918211049.271.8JAN

    JAN'071115613195.818.645FEB

    FEB'078185113843340MAR

    MARCH4335387845328

    APRIL'078954297416511

    MAY'071353818450502

    JUNE'071847370152520

    JULY2329488135370

    AUG'072401428183160

    SEP1640747153220

    OCT'0711901246316172

    NOV'071178897290560

    DEC'0711228655011107

    JAN115159739312742

    FEB'0891244245614744

    MARCH'0845548695220745

    07-08

    14386

    9224

    YEAR 2007-08 (Upto DEC'07)

    06-07

    16377

    7219

    YEAR 2006-07

    05-06

    16534.9

    5991

    YEAR 2005-06

    INTER-INTRA

    NRLDC(TOTAL)INTERINTRAWRLDC(TOTAL)INTERINTRASRLDC(TOTAL)INTERINTRAERLDC(TOTAL)INTERINTRANERLDC(TOTAL)INTERINTRATOTALINTERINTRA

    YEAR'05-0610125.75851.7427410561.210180.238177212664662310751644427017422525.916534.95991

    INTERINTRA

    YEAR'06-07108876361452696329194438210061114896318754434612422223596163777219

    INTERINTRA

    YEAR'07-08139547856609862875409878292283420884252691562218423610143869224

    Chart1

    11264157917442000

    0.04166666671264157917442000

    0.08333333331264157917442000

    0.1251264157917442000

    0.16666666671264157917442000

    0.20833333331264157917442000

    0.251264132913462000

    0.29166666671264132913462000

    0.33333333331264132913462000

    0.3751264132913462000

    0.41666666671264148915062000

    0.45833333331264148915062000

    0.51264148915062000

    0.54166666671264148915062000

    0.58333333331264148915062000

    0.6251264148915062000

    0.66666666671264148915062000

    0.70833333331285131013271750

    0.751285131013271750

    0.79166666671285131013271750

    0.83333333331285131013271750

    0.8751285131013271750

    0.91666666671285131013271750

    0.95833333331285135015151750

    241264132914942000

    MARGIN AVIALIABLE

    WR-NRSTOA APPROVED

    ER-NRSTOA APPROVED

    LTOA

    TOTAL ATC

    LTOA

    ER-NR STOA APPR.

    WR-NR STOA APPR.

    MARGIN AVAILABLE

    ATC & MARGIN AVAILABLE FOR IMPORT(MW) TO NORTHEN REGION IN FEB'08

    Chart3

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166123612492240

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611792200

    MARGIN AVAILABLE

    LTOA

    ER-NR STOA APPROVED

    WR-NR STOA APPROVED

    ATC & MARGIN AVAILABLE FOR IMPORT TO NORTHEN REGION IN MARCH'08

    Sheet1

    FEBRUARY

    TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINKMARGIN AVAILABLE

    0:001264157917442000256315165256

    1:001264157917442000256315165256

    2:001264157917442000256315165256

    3:001264157917442000256315165256

    4:001264157917442000256315165256

    5:001264157917442000256315165256

    6:0012641329134620006546517654

    7:0012641329134620006546517654

    8:0012641329134620006546517654

    9:0012641329134620006546517654

    10:00126414891506200049422517494

    11:00126414891506200049422517494

    12:00126414891506200049422517494

    13:00126414891506200049422517494

    14:00126414891506200049422517494

    15:00126414891506200049422517494

    16:00126414891506200049422517494

    17:0012851310132717504232517423

    18:0012851310132717504232517423

    19:0012851310132717504232517423

    20:0012851310132717504232517423

    21:0012851310132717504232517423

    22:0012851310132717504232517423

    23:00128513501515175023565165235

    0:00126413291494200050665165506

    MARCH

    TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINK

    0:0011661166117922001021013

    1:0011661166117922001021013

    2:0011661166117922001021013

    3:0011661166117922001021013

    4:0011661166117922001021013

    5:0011661166117922001021013

    6:0011661166117922001021013

    7:0011661166117922001021013

    8:0011661166117922001021013

    9:0011661236124922409917013

    10:0011661236124922009517013

    11:0011661236124922009517013

    12:0011661236124922009517013

    13:0011661236124922009517013

    14:0011661236124922009517013

    15:0011661236124922009517013

    16:0011661236124922009517013

    17:0011661236124922009517013

    18:001166116611791800621013

    19:001166116611791800621013

    20:001166116611791800621013

    21:001166116611791800621013

    22:001166116611791800621013

    23:001166116611791800621013

    0:0011661166117922001021013

  • Intra and Inter Regional Transactions

    POWERGRID - NRLDC

    NO.OF TRANS.(LINE)

    APRIL36253724

    67114239593

    69142352489

    59194437441

    69436484755

    76260527601

    60244484838

    58372628831

    707447831003

    816487471014

    YEAR'04-05

    YEAR'05-06

    YUEAR'06-07

    YEAR'07-08

    TOTAL TRANS.

    67

    69

    59

    69

    76

    60

    58

    70

    81

    88

    81

    36

    114

    142

    194

    436

    260

    244

    372

    744

    648

    398

    350

    253

    239

    352

    437

    484

    527

    484

    628

    783

    747

    463

    536

    724

    593

    489

    441

    755

    601

    838

    831

    1003

    1014

    NO. OF TRANSACTIONS

    TOTAL STOA TRANSACTIONSYEAR 2004-05

    NO.OFTRANS.

    YEAR WISE LINE GRAPHTOTAL NO. OF TRANSACTIONS.

    CONTINOUS LINE GRAPH

    YEAR'04YEAR'05YEAR'06YEAR'07

    APRIL36253724MAY'0467

    MAY67114239593JUNE69

    JUNE69142352489JULY59

    JULY59194437441AUG'0469

    AUG69436484755SEPT76

    SEP76260527601OCT60

    OCT60244484838NOV'0458

    NOV58372628831DEC70

    DEC707447831003JAN'0581

    JAN816487471014FEB'0588

    FEB88398463MAR81

    MAR81350536APRIL36

    MAY'05114

    JUNE142

    JULY194

    AUG'05436

    SEP260

    OCT244

    NOV'05372

    DEC744

    JAN648

    FEB'06398

    MAR350

    APRIL253

    MAY'06239

    JUNE352

    JULY437

    AUG'06484

    SEP527

    OCT484

    NOV'06628

    DEC783

    JAN747

    FEB'06463

    MAR536

    APRIL724

    MAY'07593

    JUNE489

    JULY441

    AUG'07755

    SEP601

    OCT838

    NOV'07831

    DEC1003

    JAN1014

    FEB

    MAR

    ENERGY APPR

    1405

    1060

    1569

    1943

    1968

    1119

    1451

    1716

    1434

    1444

    1332

    1091

    1528

    1647

    1699.5

    1943.2

    2095.5

    1818.6

    1915.1

    2511.3

    2447.3

    2093.3

    1736.6

    1671.8

    1696

    1901

    2321

    1997

    2277

    2032

    2093

    1998

    1988

    1787

    1836.7

    2141.3

    2672

    2421

    2989

    3027

    2562

    2769

    2422

    2605

    2305

    STOA ENERGY APPROVED(MU)YEAR 2004-07

    ENERGY(BAR)

    APR10911671.82141.3

    1405152816962672

    1060164719012421

    15691699.523212989

    19431943.219973027

    19682095.522772562

    11191818.620322769

    14511915.120932422

    17162511.319982605

    14342447.319882307

    14442093.31787FEB

    13321736.61836.7MAR

    YEAR'04-05

    YEAR'05-06

    YER'06-07

    YEAR'07-08

    MONTHS

    MU

    ENERGY APPROVED

    MUs

    ENERGY( CONTINOUS LINE GRAPH)

    YEAR WISE LINE GRAPH

    MAY '041405YEAR'04YEAR'05YEAR'06YEAR'07

    JUNE'041060

    JULY'041569APR109116722141

    AUG'041943MAY1405152816962672

    SEP1968JUNE1060164719012421

    OCT1119JULY1569170023212989

    NOV'041451AUG1943194319973027

    DEC1716SEP1968209622772562

    JAN '051434OCT1119181920322769

    FEB'051444NOV1451191520932422

    MARCH1332DEC1716251119982605

    APRIL'051091JAN1434244719882307

    MAY'051528FEB144420931787

    JUNE1647MAR133217371837

    JULY1700

    AUG'051943

    SEP2096

    OCT1819

    NOV'051915

    DEC2511

    JAN'062447

    FEB'062093

    MARCH1737

    APRIL '061672

    MAY'061696

    JUNE1901

    JULY2321

    AUG'061997

    SEP2277

    OCT2032

    NOV'062093

    DEC1998

    JAN'071988

    FEB'071787

    MARCH1837

    APRIL'072141

    MAY'072672

    JUNE2421

    JULY2989

    AUG'073027

    SEP2562

    OCT2769

    NOV'072422

    DEC'072605

    JAN2305

    FEB'08

    MARCH'08

    DIFF TRANS

    188332405

    616308537

    316274361

    SAME DAY

    FCFS

    ADVANCE

    NO. OF RANSACTIONS

    STOA TRANSACTIONS

    DIFF TYPE OF TRANS

    SAME DAYDAY AHEADFCFSADVANCE

    YEAR'05-061883013332405

    YEAR'06-076164472308537

    YEAR'07-083165324274361

    RLDC WISE BAR GRAPH

    10125.710561.2772623444

    1088796322100631346

    139546287292242522

    NRLDC

    WRLDC

    SRLDC

    ERLDC

    NERLDC

    RLDC WISE ENERGY(MU) APPROVED

    RLDC WISE LINE GRAPH

    2106114040

    4448854848

    7257853636

    11135314949

    12616136363

    11428896161

    71910494949

    8649513636

    113012683737

    112312683737

    8889607171

    5048289494

    4437957373

    5817907777

    10457905353

    13458905656

    14544766767

    105410828989

    788116259.659.6

    817116041.541.5

    9918219.29.2

    111561318.618.6

    8185113333

    4335385353

    8954296565

    13538185050

    18473705252

    23294883737

    24014281616

    16407472222

    119012461717

    11788975656

    1122865110110

    1133612127.6127.6

    NRLDC

    WRLDC

    ERLDC

    SRLDC

    RLDC WISE ENERGY APPROVED(MU)

    WR ENERGY

    611795429

    885790818

    785790370

    531890488

    613476428

    8891082747

    104911621246

    9511160897

    1268821865

    1268613612

    960511FEB

    828538MAR

    WESTERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    SR ENERGY

    223334741

    118219450

    961.2152

    028.8135

    00183

    041153

    00316

    07.4290

    0104501

    0195.8393

    100384FEB

    233784MAR

    SOUTHERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    ER ENERGY

    407365

    487750

    365352

    495637

    636716

    618922

    4959.617

    3641.556

    379.2110

    3718.6127.6

    7133FEB

    9453MAR

    EASTERN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    NR ENERGY

    210443895

    4445811353

    72510451847

    111313452329

    126114542401

    114210541640

    7197881190

    8648171178

    11309911122

    112311151133

    888818FEB

    504433MAR

    NORTHEN REGION ENERGY APPROVED(MU)

    YEAR 05-06

    YEAR 06-07

    YEAR 07-08

    RLDC WISE MU

    (CONTINOUS LINE GRAPH)

    ENERGY APPROVED RLDC WISEBAR GRAPH

    NRLDCWRLDCSRLDCERLDCNERLDCNRLDCWRLDCSRLDCERLDCNERLDC

    APRIL'05210611223407YEAR'05-0610125.710561.2772623444

    MAY'054448851184833

    JUNE'0572578596365YEAR'06-071088796322100631346

    JULY11135310496.5

    AUG'0512616130635.4YEAR'07-08139546287292242522

    SEP11428890612

    OCT'0571910490490.9

    NOV'0586495103663.1

    DEC'051130126803775.4

    JAN'061123126803798.8NRLDCYEAR 05-06YEAR 06-07YEAR 07-08

    FEB'068889601007171.2

    MARCH5048282339475.6APRIL

    APRIL '064437953347326MAY

    MAY'065817902197726JUNE

    JUNE'0610457901.25310JULY

    JULY134589028.8560AUG

    AUG'0614544760670SEP

    SEP1054108241899.9OCT

    OCT'067881162059.622NOV

    NOV'0681711607.441.566.2DEC

    DEC'069918211049.271.8JAN

    JAN'071115613195.818.645FEB

    FEB'078185113843340MAR

    MARCH4335387845328

    APRIL'078954297416511

    MAY'071353818450502

    JUNE'071847370152520

    JULY2329488135370

    AUG'072401428183160

    SEP1640747153220

    OCT'0711901246316172

    NOV'071178897290560

    DEC'0711228655011107

    JAN1133612393127.641.5

    FEB'0891244245611365

    MARCH'08

    07-08

    17547

    12284

    YEAR 2007-08

    06-07

    16377

    7219

    YEAR 2006-07

    05-06

    16534.9

    5991

    YEAR 2005-06

    INTER-INTRA

    NRLDC(TOTAL)INTERINTRAWRLDC(TOTAL)INTERINTRASRLDC(TOTAL)INTERINTRAERLDC(TOTAL)INTERINTRANERLDC(TOTAL)INTERINTRATOTALINTERINTRA

    YEAR'05-0610125.75851.7427410561.210180.238177212664662310751644427017422525.916534.95991

    INTERINTRA

    YEAR'06-07108876361452696329194438210061114896318754434612422223596163777219

    INTERINTRA

    YEAR'07-081395478566098628754098782922834208842526915622184298311754712284

    Chart1

    11264157917442000

    0.04166666671264157917442000

    0.08333333331264157917442000

    0.1251264157917442000

    0.16666666671264157917442000

    0.20833333331264157917442000

    0.251264132913462000

    0.29166666671264132913462000

    0.33333333331264132913462000

    0.3751264132913462000

    0.41666666671264148915062000

    0.45833333331264148915062000

    0.51264148915062000

    0.54166666671264148915062000

    0.58333333331264148915062000

    0.6251264148915062000

    0.66666666671264148915062000

    0.70833333331285131013271750

    0.751285131013271750

    0.79166666671285131013271750

    0.83333333331285131013271750

    0.8751285131013271750

    0.91666666671285131013271750

    0.95833333331285135015151750

    241264132914942000

    MARGIN AVIALIABLE

    WR-NRSTOA APPROVED

    ER-NRSTOA APPROVED

    LTOA

    TOTAL ATC

    LTOA

    ER-NR STOA APPR.

    WR-NR STOA APPR.

    MARGIN AVAILABLE

    ATC & MARGIN AVAILABLE FOR IMPORT(MW) TO NORTHEN REGION IN FEB'08

    Chart3

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166116611792200

    1166123612492240

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166123612492200

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611791800

    1166116611792200

    MARGIN AVAILABLE

    LTOA

    ER-NR STOA APPROVED

    WR-NR STOA APPROVED

    ATC & MARGIN AVAILABLE FOR IMPORT TO NORTHEN REGION IN MARCH'08

    Sheet1

    FEBRUARY

    TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINKMARGIN AVAILABLE

    0:001264157917442000256315165256

    1:001264157917442000256315165256

    2:001264157917442000256315165256

    3:001264157917442000256315165256

    4:001264157917442000256315165256

    5:001264157917442000256315165256

    6:0012641329134620006546517654

    7:0012641329134620006546517654

    8:0012641329134620006546517654

    9:0012641329134620006546517654

    10:00126414891506200049422517494

    11:00126414891506200049422517494

    12:00126414891506200049422517494

    13:00126414891506200049422517494

    14:00126414891506200049422517494

    15:00126414891506200049422517494

    16:00126414891506200049422517494

    17:0012851310132717504232517423

    18:0012851310132717504232517423

    19:0012851310132717504232517423

    20:0012851310132717504232517423

    21:0012851310132717504232517423

    22:0012851310132717504232517423

    23:00128513501515175023565165235

    0:00126413291494200050665165506

    MARCH

    TIMELTOAER-NR LINKWR-NR LINKTOTAL ATCMARGIN AVAILABLEER-NR LINKWR-NR LINK

    0:0011661166117922001021013

    1:0011661166117922001021013

    2:0011661166117922001021013

    3:0011661166117922001021013

    4:0011661166117922001021013

    5:0011661166117922001021013

    6:0011661166117922001021013

    7:0011661166117922001021013

    8:0011661166117922001021013

    9:0011661236124922409917013

    10:0011661236124922009517013

    11:0011661236124922009517013

    12:0011661236124922009517013

    13:0011661236124922009517013

    14:0011661236124922009517013

    15:0011661236124922009517013

    16:0011661236124922009517013

    17:0011661236124922009517013

    18:001166116611791800621013

    19:001166116611791800621013

    20:001166116611791800621013

    21:001166116611791800621013

    22:001166116611791800621013

    23:001166116611791800621013

    0:0011661166117922001021013

  • ApprovedActive

    POWERGRID - NRLDC

    Chart1

    134

    197

    229

    2712

    Approved Licencee

    Active

    No. of Players -------->

    Number of Trading License issued by CERC

    Sheet2

    Approved LicenceeActive

    2004-05134

    2005-06197

    2006-07229

    2007-082712

    VINERGY

    VISA

    KALYANI

    Sheet3

    S. No.Name of ApplicantLicence issued onCategoryApplicable to whole India

    1Tata Power Trading Company Ltd.,9th June, 2004F CategoryWhole of India

    2Adani Enterprises Ltd.,9th June, 2004F CategoryWhole of India

    3PTC India Limited30th June,2004F CategoryWhole of India

    4Reliance Energy Trading Ltd.30th June,2004F Category

    5Vinergy International Private Limited,12th July,2004B Category

    6Lanco Electric Utility Limited,23th July,2004F CategoryExcept J&k

    7MMTC Limited23th July,2004C CategoryWhole of India

    8NTPC Vidyut Vyapar Nigam Ltd.23th July,2004F CategoryWhole of India

    9DLF Limited,2nd Nov,2004A CategoryExcept J&k

    10Jindal Steel & Power Limited2nd Nov,2004A CategoryExcept J&k

    11Chhattisgarh Electricity Company Ltd.3rd Nov,2004A CategoryExcept J&k

    12GMR Ltd.9th Nov,2004A CategoryExcept J&k

    13Karam Chand Thapar & Bros. (Coal Sales) Limited27th Jan,2005F Category

    14Subhash Kabini Power Corporation Ltd.26th May,2005`A` CategoryExcept J&k

    15Maheshwary Ispat Limited19th July,2005`A` CategoryExcept J&k

    16Special Blasts Ltd.21st July,2005`A` CategoryExcept J&k

    17Instinct advertisement & Marketing Limited7th Sep,2005`A CategoryExcept J&k

    18Essar Electric Power Development Corporation Limited14th Dec,2005C CategoryExcept J&k

    19Suryachakra Power Corporation Ltd.22nd Feb,2006`A` CategoryExcept J&k

    20JSW Power Trading Company Limited25th April,2006`F` CategoryWhole of India

    21GEA Energy System (India) Limited7thDec,2006`F` CategoryWhole of India

    22Malaxmi Energy Trading Private Limited12th Dec,2006`A` CategoryExcept J&k

    23Visa Power Limited,Kolkata28th June,2007B CategoryWhole of India

    24Kalyani Power Development Private Limited21st Aug,2007F CategoryExcept J&k

    25Patni Projects Private Limited23rd Aug,2007C CategoryExcept J&k

    26Ispat Energy Limited30th Aug,2007`F` CategoryWhole of India

    27Balaji Biomass Power Private Limited22nd Jan,08`A` CategoryExcept J&k

    Sheet1

    S. No.Name of ApplicantLicence issued onCategoryApplicable to whole India

    1Tata Power Trading Company Ltd.,9th June, 2004F CategoryWhole of India

    2Adani Enterprises Ltd.,9th June, 2004F CategoryWhole of India

    3PTC India Limited30th June,2004F CategoryWhole of India

    4Reliance Energy Trading Ltd.30th June,2004F Category

    5Sumex Organics Private Limited12th July,2004B CategoryExcept J&k

    6Vinergy International Private Limited,12th July,2004B Category

    7Lanco Electric Utility Limited,23th July,2004F CategoryExcept J&k

    8MMTC Limited23th July,2004C CategoryWhole of India

    9NTPC Vidyut Vyapar Nigam Ltd.23th July,2004F CategoryWhole of India

    10DLF Limited,2nd Nov,2004A CategoryExcept J&k

    11Jindal Steel & Power Limited2nd Nov,2004A CategoryExcept J&k

    12Chhattisgarh Electricity Company Ltd.3rd Nov,2004A CategoryExcept J&k

    13GMR Ltd.9th Nov,2004A CategoryExcept J&k

    14Karam Chand Thapar & Bros. (Coal Sales) Limited27th Jan,2005F Category

    15Subhash Kabini Power Corporation Ltd.26th May,2005`A` CategoryExcept J&k

    16Maheshwary Ispat Limited19th July,2005`A` CategoryExcept J&k

    17Special Blasts Ltd.21st July,2005`A` CategoryExcept J&k

    18Instinct advertisement & Marketing Limited7th Sep,2005`A CategoryExcept J&k

    19Essar Electric Power Development Corporation Limited14th Dec,2005C CategoryExcept J&k

    20Suryachakra Power Corporation Ltd.22nd Feb,2006`A` CategoryExcept J&k

    21JSW Power Trading Company Limited25th April,2006`F` CategoryWhole of India

    22GEA Energy System (India) Limited7thDec,2006`F` CategoryWhole of India

    23Malaxmi Energy Trading Private Limited12th Dec,2006`A` CategoryExcept J&k

    24Visa Power Limited,Kolkata28th June,2007B CategoryWhole of India

    25Kalyani Power Development Private Limited21st Aug,2007F CategoryExcept J&k

    26Patni Projects Private Limited23rd Aug,2007C CategoryExcept J&k

    27Ispat Energy Limited30th Aug,2007`F` CategoryWhole of India

    28Balaji Biomass Power Private Limited22nd Jan,08`A` CategoryExcept J&k

  • POWERGRID - NRLDC

    Chart3

    57912

    34465562

    24323247

    45647184

    2004-05

    2005-06

    2006-07

    2007-08

    Number of Active Market Players

    Sheet2

    PSEB5573.26

    MSEDCL3788.45

    DTL2021.36

    TNEB1652.80

    MPPTCL1567.90

    GUVNL1556.32

    HPGCL1454.43

    CSEB1220.54

    UPPCL567.05

    WBSEB498.48

    J&K453.22

    APPCC434.36

    RPPC402.45

    HPSEB394.63

    UPCL385.19

    TATA POWER338.99

    MSETCL227.10

    MEGHALAYA216.78

    CESC157.44

    MPSEB155.70

    SAIL142.64

    ASEB128.18

    JVVNL107.54

    UTC70.48

    AVVNL32.62

    JDVVNL24.15

    APTRANSCO11.83

    NPCL(UP)7.64

    GOA4.21

    BESCOM2.30

    Sheet1

    TRADERSELLERBUYERTotal Participating Utilities

    2004-055342445

    2005-067463264

    2006-079553271

    2007-0812624784

    2004-052005-062006-072007-08

    Trader57912

    Seller34465562

    Buyer24323047

    total45647184

  • STOA Success Story Developed in consultation with all stakeholdersApplications Processed (Since Beginning) > 20,000 No.Volume (Approved Energy) (Since Beginning)> 90BUsApplications Approved > 95 %Refusal/Non-consent by SLDCs > 3 - 4 %Refusal due to system constraints < 0.5 %Curtailment in real time < 1%Near Dispute free implementationLogistics/infrastructure -In-houseRobust Financial Settlement SystemConfidence Building & Dissemination of knowledge

    POWERGRID - NRLDC

  • STOA Encouraging factsTransactions between extreme corners of the countryKerala to PunjabNagaland, Arunachal, Tripura to Maharashtra, UP Most of the States participated.Market Players Simultaneous Buy & Sell on same dayDelhi Buy in Peak, sell in off-peakTransactions from few MW to hundreds of MW 2 MW (JP Cement Rewa,MP JP Cement, Ayodhya,UP) 800 MW (BSES Rajdhani to UP)Surplus during Weekend/Holidays utilisedBudge-Budge of CESC : National Award for PLF of 99.6% in 2005-06Improved performance of Generating Plants Diversity being gainfully utilized

    POWERGRID - NRLDC

  • Typical Reasons for RefusalBalancing Mechanism Consent by STU/SLDC TelemetryMeteringSchedulingFunctional Autonomy of SLDC PPAs

    POWERGRID - NRLDC

  • TSO Vs ISO

  • HistoryStates had bundled/integrated Generation, Transmission & Distribution entity

    Inter state lines conceptualized and started implementation in 60s

    In 1964, GoI setup the REBs as Deemed Independent System Operator under CEA to initiate Regional Grid operations and State level operators for State Transmission/ Distribution networks

  • Migration from Deemed ISO to TSO in India

    Inter-State integration was attempted from mid 70s along with Central Generating Companies with ultimate aim to conceptualize Regional Grids.By mid 80s, need for inter regional connections was feltIn 1989, Cabinet approved POWERGRIDs formation with following objectives -Massive Transmission Expansion and establishment of Inter-regional linesOperation of existing RLDCs Correct the lacunae of interstate lines & missing linksEnsuring Grid DisciplineEstablish Unified Load Despatch Centres and dedicated communication Urgently remove Institutional weaknesses to deal with the problems in Regional Grid Operation

  • RLDCs were thus gradually transferred to POWERGRID from 1994 to 1996. For effective grid operation, POWERGRID has done the following

    Modernization of RLDCs Preparation of Grid Code in the capacity of CTUIntroduced Availability Based Tariff (ABT)Creating a strong & vibrant National GridRing-fencing of the activities of Grid Operation from that of TransmissionManning of RLDCs suitably addressed through massive reduction in non-executive and addition in executive category with suitable training

    These efforts of POWERGRID have resulted intoEnhanced grid stability with improved frequency and voltage profileEnhanced inter regional exchangesSubstantial reduction in grid disturbancesFacilitating Inter-state Open AccessEconomic benefitsMigration From ISO to TSO

  • TSO model in India a few factsFormulation of evolving Market rules & order for implementation of Indian Electricity Grid Code by CERC TSO only an enabler and immune to dispatchOverall planning by CEATSO only the coordinator

    CERC oversees implementation of Open Access in inter-State TransmissionTSO only an enablerNo operational / commercial disputes between the constituents and the Grid OperatorMarket rules, Grid codes, Open Access etc. already in place The system has adequate in-built checks and balances by designDecentralized dispatch system operation System Operation and Transmission activities ring fenced

  • Close interaction between system operator and network owner head and body is togetherfaster decision making, reduces response timeTSO has no commercial interest in Generation, Distribution & Trading (as per the Electricity Act 2003 itself)Information sharing of Transparent and two way communicationReal-time power flowsLong-term & Short-term capacity reservations for non-discriminatory open access

    RLDC backed by large organization which provides Buffer for manpowerAvenues for lateral movementJob enrichment and career growthTSO model in India a few facts

  • Ensure digital quality power through 100% Grid availabilityPlan and expand Grid with adequate redundancy

    Ensure effective communication, control and command

    Ensure physical Security of the establishments, particularly of the Load Dispatch Centres

    Managing complex power system with growing size of the grid because of national & international connections, open access and market developmentPower System Challenges

  • Continuous expansion of the Grid through system studies and real time feed back from the system operator TSO alone can effectively do it In case of split of TSO to ISO and Transmission utility, the effective co-ordination may be difficult as witnessed in India in the past and being witnessed internationally, particularly USAAdoption of Scenario-and-contingency (S&C) planning tools, in addition to building adequate redundancyAdequate security mechanism, both physical & technical against terrorismContinuous upgradation and modernisation of RLDCs, which calls for Adequate Fund AvailabilityInstitutional Strength to train & redeploy personnel with adequate room for career growth

    Challenges can be addressed through

  • TSO-ISO International experienceModels

    TSOISOFranceU.KSwedenGermanyNetherlandItalyChinaSouth AfricaUSA *CanadaBrazil

    * Moving towards TSO through RTO

  • In USA, need felt for shifting to TSO model as ISO model did not help in development of new transmission lines & modernization of LD&C facilitiesTERNA, new Italian TSO made in 2005 by integration of TERNA (Trans. Developer) & GRTN(ISO)Norway choose TSO model for development of the grid and its management for socio-economic efficient transmission networkIn France, both Transmission and System Operation functions delegated to RTEAll European countries follow TSO modelThe World Bank report indicated that TSO model is critical for success of any power sectorIn WEC seminar, it emerged that TSO permits much stronger financial incentives around system security TSO-ISO International Experience

  • Comparison of TSO vs. ISO

    TSOISOHarmonisation of transmission asssets development and its operation & managementsOperator and Grid owners are tied up only through agreements slow decision making and increase response timeTransparent and Simpler information flowCommunication may not be effective between two(2) organisationsGrid management and asset ownership with single entity make better accountability Grid operators and asset owners may blame each other

    Decide and implement the right efforts in a socio-economic perspective through integrated instruments by system operator & grid ownerLacks instrument to secure socio-economic development and operation of transmission grid

  • Comparison of TSO vs. ISO

    TSOISORLDC backed up by large organisation which provides - availability of adequate funds, buffer for manpower, Career growth, avenues for lateral movementSmall organisation, less opportunity for career growth, fund mobilisation difficultBacked up by experienced manpower in all fields of transmission helps in efficient grid managementNo backup of experienced manpower in transmission systemNeutrality can be addressed by suitable mechanism, i.e ring fencing, banning TSO from generation & trading and availability of regulatory mechanismNeutral

  • The World Bank report on Transmission System Operators Lesson From the Frontlines , June, 2002

    Quote

    Among the new power institutions, Transmission System Operators (TSOs) are critical to the success of any power sector in which competition is sought. A TSO must be the operator of both the high voltage transmission grid and generation dispatch centre

    Unquote

  • In the World Energy Council seminar on Large Power System failure held in London on 02.10.2006, it emerged that

    The European approach of establishing TSOs rather than ISOs permits much stronger financial incentives to be put in place around system security.

    TSO approach deliver more accountability

  • Indian power sector maturing & developingNeutrality of TSO in India ensured by designImproved grid management in India thru TSOInstills accountability in SO regarding investment recommendationsArchitectural change may confuse new playersCareer growth & job enrichment possible in TSO to retain the talent poolTransmission Utility only the path-provider & neutral and in no way can influence system operationIt has socio-political impacts and fall outsCannot afford failuresTSO model is more successful internationallyTSO is best suited in Indian contextConclusion

  • Discussion

  • ISO - American ModelGGGDDDTTGDGDGDTSOSORTOUSA had adopted this model; As many vertically integrated private players needed to be monitored by an independent entity to oversee Grid Management.

    Need felt for shifting to TSO Model as, Co-operative approach did not help in adding new transmission lines & modernizing load dispatch centres Thus, they are now moving to TSO through RTO.

  • TSO TERNA, ItalyTERNA new Italian TSO - owns & operate more than 93% of Italian Transmission Network, made in 2005 by integration of TERNA & GRTN (ISO)Need for this integration To harmonise transmission asssets creation and its operation & managementsTo ensure transparent and competitive electricity marketTo improve asset management

    *- / BDI

    TSO vis--vis ISO model Italian experience and way ahead

    +

    GRTN(asset management)

    Dispatching andGrid development planning

    TERNA(asset ownership)

    TERNARete Elettrica Nazionale

    Maintenance and Grid development implementation

    Merger

    Dispatching & securityGrid operation & maintenancePlanning and implementation of grid development Power sector statistics

    The new TSO since November, 1st 2005

  • Norway Statnett as TSO

    Necessity to choose TSO model in Norway

    ISO lacks necessary instruments to make grid capacity adaptationsGrid owner without system operator responsibility will often lack incitements to choose instruments that the ISO finds socio-economic efficientTSO model is necessary to carry out the right development of the grid, responding to long-term changes in production and consumption patterns

    *

    TSO-model gives sufficient instruments

    Evaluating instruments

    Decide and implement the right efforts in a fast and effective way

    System services

    Grid utilisation

    New grid capacity

    Transmission pricing

    Instruments available for an ISO

    Instruments available for a TSO

    Balancing system reliability requirements and the market need for transmission capacity

    Use of instruments for a TSO

  • France T + SOGDEdFRTEThis model is followed in France, wherein Transmission and System Operation functions have been delegated to RTE. EdF is responsible for the Generation and the Distribution to the extent of 95%

  • TSO Model (European countries)GGGDDDT + SOGDGDThis model is being followed in UK, Norway, Sweden, Finland, Netherland, Denmark

    Germany has four Transmission System Operators across the country (TSO model)

    *NRLDC*NRLDCNRLDCNRLDCNRLDC*NRLDC*TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQNRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDCNRLDCNRLDC*NRLDC*NRLDCNRLDCNRLDC*NRLDC*A significant quantum of need is traded through long term bilateral contracts.But the availability of tools to optimize demand helps the operator.

    NRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDC*NRLDC*NRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDCNRLDC*NRLDC*NRLDCNRLDCNRLDC*NRLDCNRLDCNRLDCNRLDCNRLDC*NRLDC*NRLDC*NRLDC*NRLDCNRLDC*NRLDC*NRLDC*Enriching experience . Still a long way to go Max transfer 2780 on a day 11-Aug-06 . NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDC*NRLDCNRLDC*NRLDC*NRLDC