Coal Power Generation in India and its Role in Economic Efficiency Symposium on Sustainable Power Supply Mix in the Future Prosanto Pal The Energy and Resources Institute, India 20 November 2015 Bangkok

Upload: others

Post on 17-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Power Generation Senario

Coal Power Generation in India and its Role in Economic

Efficiency

Symposium on Sustainable Power Supply Mix in the Future

Prosanto Pal

The Energy and Resources Institute, India

20 November 2015 Bangkok

Page 2: Power Generation Senario

Outline

Power sector in India Coal supply Generation technologies

Page 3: Power Generation Senario

Power sector in India – An overview

Page 4: Power Generation Senario

Power generation mix in India Thermal based power accounts for 70% of total generation Coal accounts for more than 80% of thermal mix

Per Capita Consumption- 870 kWh/Yr is very low Overall deficit 3.6%; Peak deficit 4.7%

Page 5: Power Generation Senario

Generation capacity

Installed capacity (2015) : 280,000 MW

Capacity doubled in 8 years • 140,000 MW (2007) • Average annual growth

rate : 8.5% Average capacity

addition was 22,000 MW per year in last 4 years

Sector-wise mix

Page 6: Power Generation Senario

Planned capacity additions till 2017 Thermal 50,000 MW; Hydro 7,200 MW; Nuclear 1,500 MW

NTPC Barh (2 X 660 MW) Bongaigaon Mauda

1320 MW 750 MW 660 MW

IL&FS Tamil Nadu, Cuddalore Phase 1 (2 X 600 MW) Phase 2 (3 X 800)

1200 MW 2400 MW

Maharashtra State Power Generating Co Kordi Chandrapur Parli

1980 MW 500 MW 250 MW

Prayagraj Power Generation Co, Bara, UP (3 X 660) 1980 MW

UP Rajya Vidyut Nigam Obra (2 X 660) Anpara Unit II

1320 MW 500 MW

KSK Mahanadi, Akalatara, Chhattisgarh Unit III & Unit IV(2 X 600)

1200 MW

Page 7: Power Generation Senario

Ultra mega power projects (UMPP) Completed projects Tata Power, Mundra, Gujarat (5 X 800 MW) : 4000 MW Reliance Power, Sasan, MP (6 X 660) MW) : 3960 MW Under construction/Awarded Reliance Power, Krishnapatnam, AP (5 X 800 MW) : 4000 MW Tilaiya (Jharkhand) Bidding process for 4 more units will be announced during the

financial year The Government of India is focusing on setting-up of 16 UMPPs with supercritical parameters

Installed generation capacities of 4000 MW per unit UMPPs are located either in pithead (domestic coal) and coastal

(imported coal)

Page 8: Power Generation Senario

Issues with other planned UMPPs Out of 16 proposed UMPPs, each of 4000 MW only 4 were

awarded since 2005-06

Most proposals stalled due to: Delays in land acquisition Policy changes envisaged

Coal linkage (assured fuel supply commitments from the government)

Swaping of coal among power plants to optimise transportation costs

New tariff policies formulated – proposes mandatory bidding process and differential tariffs

Bidding norms and coal linkages are being finalised

Page 9: Power Generation Senario

Coal supply

Page 10: Power Generation Senario

Domestic production of coal

Largest energy source; domestic production ~ 570 million tonnes • Proven reserves 126 billion tonnes • Open casting mining predominant • Indian coal has high ash content, variations in calorific

value and presence of extraneous matter Domestic production not keeping-up with

demand due to: Mining constraints (techno-economic viability) Infrastructure bottlenecks Environmental regulations

Page 11: Power Generation Senario

Coal Quality High ash content & low calorific value of coal Low sulphur content

Page 12: Power Generation Senario

Coal imports

Large quantities imported (~ 220 million tonnes) • Major imports from Indonesia, South Africa and

Australia • Only 10-15% imported coal can be in existing boilers

Projected to increase to 900 million tonnes in 2030

Page 13: Power Generation Senario

Coal washing

Washing requires especially before transporting long distances

• Current capacity 145 million tonnes

Need for capacity additions • No significant increase in recent years

Need for improvement in washing technologies • Problems of wet coal to power plants

Page 14: Power Generation Senario

Generation technologies

Page 15: Power Generation Senario

Supercritical Steam Cycle Technology

• More than 600 supercritical coal fired boilers in operation worldwide.

• Prevalent cycle parameters : • Pressure – 246 to 250 kg/cm2

• Temp - 538 oC to 600 oC

• Preferred steam parameters include high steam temp (566 to 593 oC) depending upon site specific techno economics.

• Increase in pressure and main & reheat temp more than 537 oC leads to significant improvements in heat rate

Page 16: Power Generation Senario

Advantages of supercritical steam cycle technology

• Supercritical units have higher plant efficiencies than subcritical units because of higher steam parameters

• Gross plant efficiency of supercritical units are around 40-41% compared to 38% of subcritical based units

• Gross plant efficiency of ultra-supercritical units are around 41-42% (280 ata/593 oC/593 oC)

• At international level, Advanced ultra-supercritical units have reached plant efficiencies of 47-49%

2-3%

Page 17: Power Generation Senario

Fuel saving

Reduced fuel costs due to improved plant efficiency

Page 18: Power Generation Senario

Other advantages

• Significant improvement of environment by reduction in CO2 emissions

• Plant costs less as compared to other clean coal technologies

• Much reduced NOx, SOx and particulate emissions

Page 19: Power Generation Senario

Evolution of coal based plants in India

Period 1960s 1970s 1977 1983 Under

Constrn.

Unit Size (MW) 60-100 110-120 200-250 500 660-800

Turb Inlet Pressure

/ Temp

70-90 ata

490-5350C

130 ata

5350C

130 ata

5370C

170ata

5370C

247 ata

5370C

Reheat Temp. No reheat 5350C 5370C 5370C 5650C

Turbine Cycle Heat

rate (kCal/kWh)

2370 2060 to

2190

1965 1945 1900

Gross efficiency (%) 30.5 33 to 35 37.2 37.6 38.5

Page 20: Power Generation Senario

Future outlook Coal will continue to have maximum share towards

installed capacity for power generation in India

Clean Coal Technologies such as supercritical, ultra

supercritical and advanced ultra supercritical system

will be the focus in future power projects

800-1000 MW unit plants more suitable to handle

Indian coal but technology cooperation with

international manufacturers

Page 21: Power Generation Senario

Thank you for your attention