power distribution asset management 2012

3
Streamlining existing processes to facilitate sustainability and optimization of distribution systems Managing the reliability of your power distribution systems requires a broader view toward how critical distribution resources are deployed and leveraged. This requires closer operations and maintenance alignment and action planning that considers the IXOO SHUIRUPDQFH DQG FRVW UDPL¿FDWLRQV (QVXULQJ that power distribution systems are functioning in an optimal condition in relation to use, is critical in limiting ¿QDQFLDO ULVNV DVVRFLDWHG ZLWK VKXWGRZQV FRVW effective prioritization ofmaintenance and ultimately lifetime extension of the plant. 7KLV GD\ FRXUVH ZLOO HQDEOH DWWHQGLQJ GHOHJDWHV WR maximise power distribution performance, improve reliability, reduce maintenance and operation costs. 28 – 29 February 2012 Indaba Hotel, Fourways, JHB You will be able to better plan your maintenance UHTXLUHPHQWV DQG OHQJWKHQ WKH OLIHF\FOH RI WKH equipment. In addition, you will be able to minimize operating costs without adversely impacting health DQG VDIHW\ ZLWKLQ \RXU SRZHU VWDWLRQ 5LVN DVVHVVPHQW measurement and management along with improving processes will be dealt with in detail. The increase in environmental constraints will be addressed. Imperative is identifying alternatives and discussing how effecting these changes increase the impact on capacity, performance, emissions, and reliability. This training will provide strategic planning and assessment enable you to employing systems and tools, and ultimately improve the plantprocesses. Excellence in Power Distribution Asset Management Course objectives 2SWLPLVH FRQGLWLRQ FDSDFLW\ HI¿FLHQF\ DQG UHOLDELOLW\ of power distribution systems Provide support for commercially viable procedures and techniques (VWDEOLVK DQ HIIHFWLYH VWUDWHJ\ IRU SUHGLFWLYH maintenance of power distribution systems Discover latest technologies available for effective management of assets 5HYLHZ \RXU DVVHW PDQDJHPHQW IUDPHZRUN DQG SROLF\ 0DQDJH ULVN UHOLDELOLW\ SHUIRUPDQFH DQG maintenance of power distribution systems Conduct a power distribution systems audit (IIHFWLYHO\ UHGXFH RSHUDWLQJ DQG PDLQWHQDQFH FRVWV Who should attend? Asset Managers Systems and Support Managers Substation Managers Plant Managers Operations Managers 7HFKQLFDO 0DQDJHUV(QJLQHHUV 6HQLRU (OHFWULFDO 6XSHUYLVRUV Asset Maintenance Managers &RPPLVVLRQLQJ (QJLQHHUV Streamlining existing processes to facilitate sustainability and optimization of distribution systems

Upload: ola-odejayi

Post on 19-Jan-2015

704 views

Category:

Technology


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Power Distribution Asset Management 2012

GLOBAL PROSPECTUS TRAINING (PTY) LTD.Johannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044

Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722

- Dhevaraj Pillay

Auditors - Russell Bedford SA (Jhb) Inc.

Legal - DA Morris & Associates

Marketing - [email protected]

Design - www.mustardseedcreations.co.za

Streamlining existing processes to facilitate

sustainability and optimization of distribution systems

Managing the reliability of your power distribution systems requires a broader view toward how critical distribution resources are deployed and leveraged. This requires closer operations and maintenance alignment and action planning that considers the

that power distribution systems are functioning in an optimal condition in relation to use, is critical in limiting

effective prioritization ofmaintenance and ultimately lifetime extension of the plant.

maximise power distribution performance, improve reliability, reduce maintenance and operation costs.

28 – 29

February

2012

Indaba

Hotel,

Fourways,

JHB

You will be able to better plan your maintenance

equipment. In addition, you will be able to minimize operating costs without adversely impacting health

measurement and management along with improving processes will be dealt with in detail. The increase in environmental constraints will be addressed. Imperative is identifying alternatives and discussing how effecting these changes increase the impact on capacity, performance, emissions, and reliability. This training will provide strategic planning and assessment;; enable you to employing systems and tools, and ultimately improve the plantprocesses.

Excellence in Power Distribution Asset M a n a g e m e n t

Course objectives

of power distribution systemsProvide support for commercially viable procedures and techniques

maintenance of power distribution systemsDiscover latest technologies available for effective management of assets

maintenance of power distribution systemsConduct a power distribution systems audit

Who should attend?

Asset ManagersSystems and Support ManagersSubstation ManagersPlant ManagersOperations Managers

Asset Maintenance Managers

Streamlining existing processes to facilitate

sustainability and optimization of distribution systems

Page 2: Power Distribution Asset Management 2012

GLOBAL PROSPECTUS TRAINING (PTY) LTD.Johannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044

Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722

- Dhevaraj Pillay

Auditors - Russell Bedford SA (Jhb) Inc.

Legal - DA Morris & Associates

Marketing - [email protected]

Design - www.mustardseedcreations.co.za

Chris Smit: Pr. Tech (Eng) MSAIEE, MPMSA -­ Smit vd Merwe & Associates

experience in providing project management and facilities

management solutions to clients from local government, as well as, the private and corporate sector.

project implementation and management, and budget management. He has conducted technical audits on

Stations.

Department of Housing, Daimler Chrysler, Department of Water Affairs and Forestry to mention a few.

Logan Reddy: Asset Management (Generation) -­ Eskom

Logan Reddy is the Acting Head of the Asset

Division which covers 41 200 MW of generating

turbine power stations.

Logan has 10 years of engineering experience at Kendal Power Station

of experience in technical life cycle planning and generating plant asset management. Logan has additionally applied himself in the area of

covering topics of capacity increase and spares strategies to maximise

availability.

Day 1

Asset management of power distribution systems in perspectiveLogan Reddy: Asset Management (Generation) -­ Eskom

Practical techniques for asset management of distribution systemsChris Smit: Pr. Tech (Eng) MSAIEE, MPMSA -­ Smit vd Merwe & AssociatesAsset management of Distribution systems are more focused on methodologies,

systems and asset strategies. Furthermore, this section involves the analysis of failures for corrective and preventive measures to enhance reliability, maintainability, safety and security. Through this session you will be able to enhance your existing

Maintenance management and maintenance programsManaging asset performance, reliability and maintenanceMaintenance planning and implementing scheduling

Day 2

refreshments

Overcoming the challenges in performance of distribution servicesChris Smit: Pr. Tech (Eng) MSAIEE, MPMSA -­ Smit vd Merwe & AssociatesThis session will address challenges in performance of distribution services, in particular, planning, design, and upgrading. Integral is setting up distribution systems which provide adequate support, along with performance monitoring structures. This is followed by implementing

plant and testing. Furthermore, incorporating best practices to identifying mitigating factors.

This session will cover:

performance.Performance and conditioning monitoring.

incidents and nonconformities.

Improving your management and control processesRecords

Page 3: Power Distribution Asset Management 2012

Excellence in Power Distribution Asset Management28 - 29 February 2012

Registration FormGPW

R6999