Potential Dental Clinic
• Provide a on-site dental clinic– Utilize the same vendor that provided the mobile
dental clinic (Onsite Health)– Mobile clinic was booked 1.5 days/week– New clinic start at 3 days/week– At 12 months projected at 5 days/week– Self Contained– Onsite Health - provide dental chairs and equipment
• Everything needed to run a clinic
– No cost to SPE
Potential Dental Clinic
• Location– Eric’s office
• Too small – only one chair would fit.
– Next option was a synergistic location close to Medical– Robert Young 1416 and 1418 – currently used by:
• Screen Gems for storage• Production Relocation Services as an office
– Onsite Health will reimburse SPE for:• TI needed to prepare their space for the clinic• Cost to relocated Relo Services to a new location
Potential Dental Clinic
• Vacating RY1416 and RY1418– Relocation Services
• Worked with Facilities and Studio Operations to evaluate any and all potential spaces on east side of Lot
• Best option was to build an office inside Plant 3, where they currently store furniture.
• Also, if space is available, purchase shipping container for additional production furniture storage near basketball court
– Screen Gems storage can be moved by mid-January.
Relocate Production Relocation Services
Robert Young 1416/1418
Potential Dental Clinic
• New Dental Clinic (RY1416/1418) will need: – flooring, paint, door,
domestic water and a drain
– Onsite Health - design and pull necessary permits
– Onsite Health - reimburse SPS to build-out space (est. $15K)
Plant 3 – South Space
Potential Dental Clinic• New Relo office in Plant 3 will need:– Four walls, lid, HVAC, power and data– SPE vendor to design– Onsite Health
• reimburse SPS to build-out space (est. $35K)• reimburse SPS for new shipping container (est. $5K)
Potential Dental Clinic
• Contract – Susan Ross– Automatically renewing contract, with option out– $150K in dental equipment– $60K in improvements to RY1416/1418, Plant 3 &
shipping container• SEHS/Finance/Facilities– Today– Steve Bernard to discuss with Dave Hendler
• People and Organization– Jaime Chung to discuss with George Rose