ECLIPSE RESOURCES I LLC - EBUS 2121 Old Gatesburg Rd #110 State College, PA 16803-2290 Guernsey County Ohio United States of America SO Number: 0904068866 Project Name: Yost B Well Number: 5H Rig: H&P 531 Post Job Summary 13.375” Surface Casing Prepared for: Steven Segrest Date: 6/2/2017 Submitted by: Samuel Yates

Upload: others

Post on 28-Mar-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

34059244970000_YOST B 5H.PDFECLIPSE RESOURCES I LLC - EBUS 2121 Old Gatesburg Rd #110 State College, PA 16803-2290
Guernsey County Ohio United States of America
SO Number: 0904068866
Project Name: Yost B Well Number: 5H Rig: H&P 531
Post Job Summary 13.375” Surface Casing
Prepared for: Steven Segrest
Legal Notice
Disclaimer: All information in this report is provided subject to the terms and conditions which govern the services provided by Halliburton. Halliburton personnel use their best efforts in gathering information and their best judgment in interpreting it, but any interpretation, research, analysis or recommendation furnished by Halliburton are opinions based upon inferences from measurements and empirical relationships and assumptions, which inferences and empirical relationships and assumptions are not infallible, and with respect to which professionals in the industry may differ. Accordingly, HALLIBURTON IS UNABLE TO GUARANTEE THE ACCURACY OF ANY CHART INTERPRETATION, RESEARCH ANALYSIS, OR JOB RECOMMENDATION and any interpretation or recommendation is not for use of or reliance upon by any third party. The customer has full responsibility for any of its decisions which are based on the information provided in this report.
© 2015 Halliburton. All Rights Reserved
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 3 (v. 4.4.18)
Table of Contents
1.2 Fluids Pumped ............................................................................................................................... ...............................................................................................4
2.0 Real Time Job Summary .............................................................................................................................. 5 2.1 Job Event Log ............................................................................................................................... ................................................................................................. 5
3.0 Real Time Job Graphs ............................................................................................................................... ... 7 3.1 Entire Job ............................................................................................................................... ....................................................................................................... 7
3.2 Cement ............................................................................................................................... .......................................................................................................... 8
3.3 Displacement ............................................................................................................................... ................................................................................................. 9
4.2 Field Water Analysis ............................................................................................................................... ....................................................................................12
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 4 (v. 4.4.18)
1.0 Job Information 1.1 Casing, Wellbore, and Tool Data
Description Size in
ft Btm MD
ft Top TVD
ft Btm TVD
ft Shoe Jnt
ft % Excess
24" Conductor Casing 24 94.7 23.25 0 150 17 1/2" Open Hole 17.5 150 1360 25
13 3/8" Surface Casing 13.375 54.5 12.615 BTC J 55 0 1310 42
1.2 Fluids Pumped
Fluid Name Design (bbl) Actual (bbl) Density (ppg) Yield (ft3/sk) Water Req. (gal/sk) Gel Spacer 25 25 8.7 NeoCem 240 230 15.8 1.23 5.24
Water Displacement 196 192 8.3
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 5 (v. 4.4.18)
2.0 Real Time Job Summary 2.1 Job Event Log
Seq. No.
2 Depart Yard Safety Meeting 5/31/2017 14:00:27
3 Depart Shop for Location 5/31/2017 14:10:00
4 Arrive at Location from Service Center 5/31/2017 15:30:00
5 Assessment Of Location Safety Meeting 5/31/2017 15:45:00 rigging up casing crew, bin being loaded with cement. water temp 73*F
6 Pre Rig Up Safety Meeting 5/31/2017 18:30:00
7 Rig Up Equipment 5/31/2017 18:40:00
8 Safety Meeting Pre Job 5/31/2017 21:00:00
9 Start Job 5/31/2017 21:52:37 Load Lines 5bbl
10 Test Lines 5/31/2017 21:54:32 test to 500psi, then 4000psi.
11 Circulate Well 5/31/2017 21:57:44 250bbl fresh water. no returns
12 Pump Spacer 1 5/31/2017 22:41:47 25bbl gel spacer, 3bpm, 220psi,
13 Pump Spacer 2 5/31/2017 22:52:53 10bbl fresh water
14 Pump Cement 5/31/2017 23:06:34 230bbl Class A. NeoCem. 15.8ppg, 6bpm, 550psi, 76*F returns in cellar at 63bbl away.
15 Drop Top Plug 5/31/2017 23:51:30
16 Pump Displacement 5/31/2017 23:51:58 192bbl Fresh Water, 7bpm, 300psi, cement returned at 168bbl away. 24bbl to surface.
17 Bump Plug 6/1/2017 00:27:45 bumped at 400psi, taken to 900psi, held for 5 min. bled back 2.25bbl, OSR believed Float was not holding so we closed the head in for 1 hr. Floats Held.
18 End Job 6/1/2017 00:52:52
19 Safety Meeting Pre Rig Down 6/1/2017 02:15:37 had to wait for OSR to OK rig down of Cement Head.
20 Rig Down Equipment 6/1/2017 02:31:41
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 6 (v. 4.4.18)
21 Depart Location Safety Meeting 6/1/2017 03:55:23
22 Depart Location 6/1/2017 04:15:51
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 7 (v. 4.4.18)
3.0 Real Time Job Graphs 3.1 Entire Job
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 8 (v. 4.4.18)
3.2 Cement
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 9 (v. 4.4.18)
3.3 Displacement
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 10 (v. 4.4.18)
Lab Results- Primary North East, Zanesville Job Information Request/Slurry 2391104/1 Rig Name H&P 531 Date MAY/30/2017
Submitted By Paul Thompson Job Type Surface Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Noble Well Yost B 5H
Well Information Casing/Liner Size 13.375 in Depth MD 1312 ft BHST 16°C / 60°F
Hole Size 17.5 in Depth TVD 1312 ft BHCT 21°C / 70°F
Pressure 1800 psi
Cement Information - Primary Design Conc UOM Cement/Additive
NeoCem™ Cement 0-100 % BWOC Class A Cement 5.24 gal/sack Fresh Water 0-10 % BWOC Accelerator 0-3 % BWOC Fluid Loss Additive 0-3 % BWOC Fluid Loss Additive/Dispersant 0-100 % BWOC Non-Portland Cementitious Material
Cement Properties Slurry Density 15.8 lbm/gal Slurry Yield 1.23 ft3/sack Water Requirement 5.241 gal/sack Total Mix Fluid 5.241 gal/sack Water Source Fresh Water
Operation Test Results Request ID 2391104/1 Mixability (0 - 5) - 0 is not mixable MAY/31/2017 Mixability rating (0 - 5) Avg rpm mixing under load (~12,000) Blend addition time (sec) @ 4,000 RPM 5 12000 15
Thickening Time MAY/31/2017 Temp (ºF) Pressure (psi) Reached in
(min) Start BC 30 Bc (hh:mm) 40 Bc (hh:mm) 50 Bc (hh:mm) 70 Bc (hh:mm) 100 Bc (hh:mm)
70 1800 40 2.6 3:37 3:42 3:48 3:56 4:09
Free Fluid API 10B-2 MAY/31/2017 Con. Temp (F) Heat Time (min) Cond. Time (min) Static T. (F) Static time (min) Incl. (deg) % Fluid 70 40 70 70 120 0 0
Operation Test Results Request ID 2387975/1 UCA Comp. Strength, Historical Data MAY/17/2017 End Temp (ºF)
Pressure (psi) 50 psi (hh:mm)
100 psi (hh:mm)
500 psi (hh:mm)
1000 psi(hh:mm)
8hr CS (psi) 12 hr CS (psi) End CS (psi) End Time (hrs)
60 3000 5:56 6:26 9:49 14:23 295 751 1146 15.53
API Fluid Loss, Historical Data MAY/17/2017 Test Temp (ºF) Test Pressure (psi) Test Time (min) API FL (cc/30
min) Meas. Vol. Conditioning time
(min) Conditioning Temp (ºF)
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 11 (v. 4.4.18)
Thickening Time Graph:
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Surface Casing
Page 12 (v. 4.4.18)
4.2 Field Water Analysis
Service Supervisor Dylan Morrison Water Source Frac Tank
Temperature 73 [<80 F} pH. 6 [between 6-8 pH]
Specific Gravity 1.001 [1.000 - 1.005 see Chart] Chart in Kit shows comparisons of: Chlorides [<3,000 ppm @ 1.004 S.G.]
Calcium [<500 ppm @ 1.004 S.G.]
PASS FAIL Nessler's Nitrogen [Passing Parameters]
Color of Yellow [<4.5 ppm (mg/L)]
Tannin-Lignin
Sulfate
Black X Visible [if NO >200 ppm = FAIL]
Iron (Fe)
Degree of Orange [<20.0 ppm]
ECLIPSE RESOURCES I LLC - EBUS 2121 Old Gatesburg Rd #110 State College, PA 16803-2290
Guernsey County Ohio United States of America
SO Number: 0904095706
Project Name: Yost B Well Number: 5H Rig: H&P 531
Post Job Summary 5.5” Production Casing
Prepared for: Steven Segrest
Legal Notice
Disclaimer: All information in this report is provided subject to the terms and conditions which govern the services provided by Halliburton. Halliburton personnel use their best efforts in gathering information and their best judgment in interpreting it, but any interpretation, research, analysis or recommendation furnished by Halliburton are opinions based upon inferences from measurements and empirical relationships and assumptions, which inferences and empirical relationships and assumptions are not infallible, and with respect to which professionals in the industry may differ. Accordingly, HALLIBURTON IS UNABLE TO GUARANTEE THE ACCURACY OF ANY CHART INTERPRETATION, RESEARCH ANALYSIS, OR JOB RECOMMENDATION and any interpretation or recommendation is not for use of or reliance upon by any third party. The customer has full responsibility for any of its decisions which are based on the information provided in this report.
© 2015 Halliburton. All Rights Reserved
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 3 (v. 4.4.18)
Table of Contents
1.2 Fluids Pumped ............................................................................................................................... ...............................................................................................4
2.0 Real Time Job Summary .............................................................................................................................. 5 2.1 Job Event Log ............................................................................................................................... ................................................................................................. 5
3.0 Real Time Job Graphs ............................................................................................................................... ... 6 3.1 Entire Job ............................................................................................................................... ....................................................................................................... 6
3.2 Weighted Fluids ............................................................................................................................... .............................................................................................7
3.3 Displacement ............................................................................................................................... ................................................................................................. 8
4.2 EcoSpacer ............................................................................................................................... .................................................................................................... 10
4.3 Cement ............................................................................................................................... ........................................................................................................ 11
Page 4 (v. 4.4.18)
1.0 Job Information 1.1 Casing, Wellbore, and Tool Data
Description Size in
ft Btm MD
ft Top TVD
ft Btm TVD
ft Shoe Jnt
ft % Excess
9 5/8" Intermediate Casing 9.625 40 8.835 LTC HCP110 0 7199 8 1/2" Open Hole 8.5 7199 18352
5 1/2" Production Casing 5.5 20 4.778 GB CD P 110 0 18346 0 7834 47
1.2 Fluids Pumped
Fluid Name Design (bbl) Actual (bbl) Density (ppg) Yield (ft3/sk) Water Req. (gal/sk) Tuned Spacer 100 60 12.3 3.17 19.16 EcoSpacer 264 264 12.5 1.62 7.76 NeoCem 457 457 14.5 1.20 4.86
Water Displacement 406 395 8.3
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 5 (v. 4.4.18)
2.0 Real Time Job Summary 2.1 Job Event Log
Seq. No. Activity Date Time Comments
1 Depart Shop for Location 6/14/2017 21:10:00 signed JSA
2 Arrive At Location 6/14/2017 22:30:00 arrived 2.5hrs early OL time was 0100
3 Pre Rig Up Safety Meeting 6/15/2017 01:00:00 signed JSA rigged up lines finished rig up at 0200 wait on rig to finish casing
4 Pre Job Safety Meeting 6/15/2017 07:00:00 signed JSA went over job
5 Start Job 6/15/2017 07:37:38
6 Test Lines 6/15/2017 07:40:48 tested lines to 500psi then to 6500psi
7 Pump Spacer 1 6/15/2017 07:46:57 pumped 60bbls Tuned Spacer @ 12.3ppg verified with PMS cut 40bbls short due to spacer consistency
8 Pump Spacer 2 6/15/2017 07:58:05 pumped 264bbls EcoSpacer @ 12.5ppg verified with PMS
9 Pump Lead Cement 6/15/2017 08:30:51 pumped 457bbls NeoCem@ 14.5ppg verified with PMS cement temp was 75F
10 Drop Top Plug 6/15/2017 09:33:24 verified plug left head
11 Pump Displacement 6/15/2017 09:33:27 pumped 395bbls disp received spacer to surface @ 340bbls down received 55bbls to surface.
12 Bump Plug 6/15/2017 10:26:43 bumped plug @ 2400psi took 500psi over to 3100psi
13 Pre Rig Down Safety Meeting 6/15/2017 11:30:00 signed JSA
14 Depart Location for Shop 6/15/2017 13:00:00 signed JSA
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 6 (v. 4.4.18)
3.0 Real Time Job Graphs 3.1 Entire Job
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 7 (v. 4.4.18)
3.2 Weighted Fluids
Page 8 (v. 4.4.18)
3.3 Displacement
Page 9 (v. 4.4.18)
4.0 Lab Results 4.1 Tuned Spacer
Lab Results- Spacer North East, Zanesville Job Information Request/Slurry 2393446/1 Rig Name H&P 531 Date 11/JUN/2017
Submitted By Gregory Schlosser Job Type Production Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 5.5 in Depth MD 18681 ft BHST 67°C / 152°F
Hole Size 8.5 in Depth TVD 7834 ft BHCT 67°C / 152°F
Pressure 7100 psi
Tuned Spacer 33.92 gal/bbl Fresh Water
Spacer Properties Slurry Density 12.3 lbm/gal Slurry Yield 3.17 ft3/sack Water Requirement 19.16 gal/sack Water Source Fresh Water
Pilot Test Results Request ID 2393446/1 API Rheology - Spacer 12/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 PV/YP 80 41 35 29 25 22 15 12 26.97 / 17.34
API Rheology - Spacer 12/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 PV/YP 152 32 32 27 22 20 16 14 17.73 / 18.34
Rheology Compatibility 12/JUN/2017 Test Temp (°F) Fluid Ratio 300 200 100 60 30 6 3 152 75M 95 69 44 31 22 12 9
50 149 105 80 60 38 22 16
25M 46 40 34 31 25 18 14
Wettability 12/JUN/2017 Starting Mud Vol. (ml)
Conductivity of Pure Spacer (Hn)
Conditioning Time (min)
Spacer (%) Conductivity (Hn)
Rod Test 12/JUN/2017 Temp (°F) Pass/Fail 152 PASS
API Rheology - OBM 12/JUN/2017 300 200 100 60 30 6 3 Cond Time
(min) Conditioning Temp (ºF)
PV/YP
54 42 26 20 16 10 8 40 152 45.75 / 10.43
Mud Balance Density 12/JUN/2017 Density (ppg) 11.7
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 10 (v. 4.4.18)
4.2 EcoSpacer
Lab Results- Lead North East, Zanesville Job Information Request/Slurry 2393686/1 Rig Name H&P 531 Date 12/JUN/2017
Submitted By Sean Merrill Job Type Production Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 5.5 in Depth MD 18681 ft BHST 67°C / 152°F
Hole Size 8.5 in Depth TVD 7834 ft BHCT 67°C / 152°F
Pressure 7100 psi
EcoSpacer 7.76 gal/sack Fresh Water
Cement Properties Slurry Density 12.5 lbm/gal Slurry Yield 1.62 ft3/sack Water Requirement 7.76 gal/sack Total Mix Fluid 7.76 gal/sack Water Source Fresh Water
Pilot Test Results Request ID 2393686/1 Mixability (0 - 5) - 0 is not mixable 12/JUN/2017 Mixability rating (0 - 5) Avg rpm mixing under load (~12,000) Blend addition time (sec) @ 4,000 RPM 5 12000 15
API Rheology 12/JUN/2017 300 200 100 60 30 6 3 PV/YP 80 65 47 40 31 20 17 61.05 / 23.7
API Rheology 12/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 Cond Time
(min) Conditioning Temp (ºF)
PV/YP
152 80 70 54 47 38 24 19 40 152 57.71 / 29.68
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 11 (v. 4.4.18)
4.3 Cement
Lab Results- Primary North East, Zanesville Job Information Request/Slurry 2393445/2 Rig Name H&P 531 Date 11/JUN/2017
Submitted By Gregory Schlosser Job Type Production Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 5.5 in Depth MD 18681 ft BHST 67°C / 152°F
Hole Size 8.5 in Depth TVD 7834 ft BHCT 67°C / 152°F
Pressure 7100 psi
Cement Information - Primary Design Conc UOM Cement/Additive
NeoCem™ Cement 0-100 % Non-Portland Cementitious Material 0-100 % Non-Portland Cementitious Material 0-100 % Class A Cement 4.51 gal/sack Fresh Water 0-10 % BWOC Thixotropic Additive 0-3 % BWOC Dispersant 0-3 % BWOC Retarder 0-3 % BWOC Free Water Control 0-10 lb/sk Lost Circulation Material
Cement Properties Slurry Density 14.5 lbm/gal Slurry Yield 1.20 ft3/sack Water Requirement 4.86 gal/sack Total Mix Fluid 4.86 gal/sack Water Source Fresh Water
Operation Test Results Request ID 2393445/2 Mixability (0 - 5) - 0 is not mixable 12/JUN/2017 Mixability rating (0 - 5) Avg rpm mixing under load (~12,000) Blend addition time (sec) @ 4,000 RPM 5 12000 15
API Fluid Loss 12/JUN/2017 Test Temp (ºF) Test Pressure (psi) Test Time (min) Meas. Vol. Calculated FL
(<30 min) Conditioning time (min)
Conditioning Temp (ºF)
Heat up Time
152 1000 10 59 204.37 95 152 65
Free Fluid API 10B-2 12/JUN/2017 Con. Temp (F) Heat Time (min) Cond. Time (min) Static T. (F) Static time (min) Incl. (deg) % Fluid 152 65 95 152 120 45 0
API Rheology 12/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 PV/YP 80 181 130 77 56 39 26 23 158.73 / 24.41
API Rheology 12/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 Cond Time
(min) Conditioning Temp (ºF)
152 208 152 98 73 53 30 28 95 152
Thickening Time - ON-OFF-ON 11/JUN/2017 Test Temp (ºF)
Pressure (psi) Reached in (min)
30 Bc (hh:min) 50 Bc (hh:min) 70 Bc (hh:min) 100 Bc (hh:min)
Start Bc Stirring before stop (mins)
Static Period (min)
152 7000 65 4:26 4:35 4:44 5:07 18.5 80 10
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 12 (v. 4.4.18)
UCA Comp. Strength 11/JUN/2017 End Temp (ºF)
Pressure (psi) 50 psi (hh:mm)
100 psi (hh:mm)
500 psi (hh:mm)
1000 psi(hh:mm)
8hr CS (psi) 12 hr CS (psi) 16 hr CS (psi) 24 hr CS (psi)
152 3000 12:17 12:42 16:47 19:15 0 22 428 1951
ECLIPSE RESOURCES OPERATING LLC Yost B 5H Production Casing
Page 13 (v. 4.4.18)
Thickening Time Graph:
Compressive Strength Graph:
Page 14 (v. 4.4.18)
4.4 Field Water Analysis
Service Supervisor R. Abercrombie Water Source Frac Tank
Temperature 70 [<80 F} pH. 7 [between 6-8 pH]
Specific Gravity 1.001 [1.000 - 1.005 see Chart] Chart in Kit shows comparisons of: Chlorides [<3,000 ppm @ 1.004 S.G.]
Calcium [<500 ppm @ 1.004 S.G.]
PASS FAIL Nessler's Nitrogen [Passing Parameters]
Color of Yellow [<4.5 ppm (mg/L)]
Tannin-Lignin
Sulfate
Black X Visible [if NO >200 ppm = FAIL]
Iron (Fe)
Degree of Orange [<20.0 ppm]
ECLIPSE RESOURCES I LLC - EBUS 2121 Old Gatesburg Rd #110 State College, PA 16803-2290
Guernsey County Ohio United States of America
SO Number: 0904076626
Project Name: Yost B Well Number: 5H Rig: H&P 531
Post Job Summary 9.625” 2-Stage Intermediate
Prepared for: Steven Segrest
Legal Notice
Disclaimer: All information in this report is provided subject to the terms and conditions which govern the services provided by Halliburton. Halliburton personnel use their best efforts in gathering information and their best judgment in interpreting it, but any interpretation, research, analysis or recommendation furnished by Halliburton are opinions based upon inferences from measurements and empirical relationships and assumptions, which inferences and empirical relationships and assumptions are not infallible, and with respect to which professionals in the industry may differ. Accordingly, HALLIBURTON IS UNABLE TO GUARANTEE THE ACCURACY OF ANY CHART INTERPRETATION, RESEARCH ANALYSIS, OR JOB RECOMMENDATION and any interpretation or recommendation is not for use of or reliance upon by any third party. The customer has full responsibility for any of its decisions which are based on the information provided in this report.
© 2015 Halliburton. All Rights Reserved
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 3 (v. 4.4.18)
Table of Contents
1.2 Fluids Pumped – First Stage ............................................................................................................................... ...........................................................................4
1.3 Fluids Pumped – Second Stage ............................................................................................................................... ......................................................................4
2.0 Real Time Job Summary .............................................................................................................................. 5 2.1 Job Event Log ............................................................................................................................... ................................................................................................. 5
3.0 Real Time Job Graphs ............................................................................................................................... ... 7 3.1 Entire Job ............................................................................................................................... ....................................................................................................... 7
3.2 First Stage ............................................................................................................................... ...................................................................................................... 8
3.3 Second Stage ............................................................................................................................... ................................................................................................. 9
4.2 First Stage Lead Cement ............................................................................................................................... ..............................................................................11
4.3 First Stage Tail Cement ............................................................................................................................... ................................................................................14
4.4 Second Stage Primary Cement............................................................................................................................... .....................................................................16
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 4 (v. 4.4.18)
1.0 Job Information 1.1 Casing, Wellbore, and Tool Data
Description Size in
ft % Excess
13 3/8" Surface Casing 13.375 54.5 12.615 J 55 0 1309 12 1/4" Open Hole 12.25 1309 7250 0
9 5/8" Intermediate 2 Casing 9.625 40 8.835 HCP110 0 7201 88 Multi stage cementer 1724
1.2 Fluids Pumped – First Stage
Fluid Name Design (bbl) Actual (bbl) Density (ppg) Yield (ft3/sk) Water Req. (gal/sk) Tuned Spacer 60 60 10.1 8.97 60.23 CorrosaCem 239 238 12.0 2.70 14.54 HalCem 65 68 15.6 1.17 4.74
Displacement 538 539
1.3 Fluids Pumped – Second Stage
Fluid Name Design (bbl) Actual (bbl) Density (ppg) Yield (ft3/sk) Water Req. (gal/sk) Tuned Spacer 30 30 10.1 8.97 60.23 NeoCem 49 46 15.8 1.23 5.24
Displacement 131 130
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 5 (v. 4.4.18)
2.0 Real Time Job Summary 2.1 Job Event Log
Seq. No. Activity Date Time Comments
1 Call Out 6/6/2017 08:00:00 REQUESTED TIME OF SERVICE 14:00
2 Pre Convoy Safety Meeting 6/6/2017 11:00:00 DISCUSSED TRAVEL ROUTE AND JOURNEY MANAGEMENT
3 Arrive At Location 6/6/2017 14:00:00 SPOKE W/ CO REP.
4 Pre Rig Up Safety Meeting 6/6/2017 15:00:00 DISCUSSED SPOTTING EQUIPT. AND JSA
5 Casing on Bottom 6/6/2017 20:30:49 PRIOR TO ATTACHED HES CEMENT HEAD, THE RIG PUMPED 3 MUD PILLS TO FIX MUD IMBALANCE AND TO DISENGAGE AUTOFILL ON FLOATS. FLOATS STILL APPEARED TO NOT BE HOLDING, SO THE DECISION WAS MADE TO REDUCE 1ST STAGE LEAD BY 20BBLS TO PREVENT GETTING CEMENT ACROSS THE TOOL.
6 Pre Job Safety Meeting 6/6/2017 23:00:00 DISCUSSED JOB STEPS AND JSA
7 Start Job 6/6/2017 23:30:33
8 Test Lines 6/6/2017 23:41:18 TEST LINES @ 500 AND 4000 PSI
9 Pump Spacer 6/6/2017 23:43:56 PUMPED 60 BBLS OF 10.1 PPG SPACER
10 Pump Lead Cement 6/6/2017 23:54:55 PUMPED 238 BBLS OF LEAD CMT @ 12 PPG, 79°F
11 Pump Tail Cement 6/7/2017 00:24:34 PUMPED 68 BBLS OF TAIL CMT @ 15.6 PPG, 80°F
12 Drop Top Plug 6/7/2017 00:36:33 LAUNCHED DART
13 Pump Displacement 6/7/2017 00:36:37 PUMPED 1ST 10 BBLS W/ F.W., RIG DISPLACED W/ 392 BBLS OF 10.7 PPG MUD, HES PUMPED REMAINING 137 BBLS W/ F.W.
14 Bump Plug 6/7/2017 01:50:48 BUMP PLUG 650 1200 PSI
15 Check Floats 6/7/2017 01:56:56 BLED BACK 3 BBLS, FLOATS HOLDING
16 Drop Plug 6/7/2017 02:19:29 LAUNCHED MSC OPENING PLUG ANDWAIT 15 MIN
17 Open Multiple Stage Cementer 6/7/2017 02:34:03 OPENED MSC @ 755 PSI AND PUMPED 20 BBLS OF FW TO ESTABLISH CIRC.
18 Pump Spacer 6/7/2017 03:21:09 PUMPED 30 BBLS OF 10.1 PPG SPACER
19 Pump Cement 6/7/2017 03:27:29 PUMPED 46 BBLS OF 15.8 PPG CEMENT, 68°F
20 Drop Top Plug 6/7/2017 03:36:44 LAUNCHED MSC CLOSING PLUG
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 6 (v. 4.4.18)
Created: Thursday, June 08, 2017
21 Pump Displacement 6/7/2017 03:36:49 HES PUMPED 1ST 10 BBLS FW, RIG PUMPED 105 BBLS OF 10.7 PPG MUD, HES PUMPED REMAINING 15 BBLS TO CLOSE TOOL
22 Close Multiple Stage Cementer 6/7/2017 03:56:24 CLOSED TO @ 200 PSI TO 1550 PSI
23 Other 6/7/2017 03:58:00 BLED BACK 3 BBLS
24 End Job 6/7/2017 04:00:25
25 Post Job Safety Meeting (Pre Rig Down) 6/7/2017 04:15:00
26 Pre Convoy Safety Meeting 6/7/2017 05:45:00 DISCUSSED JOURNEY MANAGEMENT AND TRAVEL ROUTE
27 Depart Location 6/7/2017 06:00:00
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 7 (v. 4.4.18)
3.0 Real Time Job Graphs 3.1 Entire Job
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 8 (v. 4.4.18)
3.2 First Stage
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 9 (v. 4.4.18)
3.3 Second Stage
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 10 (v. 4.4.18)
4.0 Lab Results 4.1 Tuned Spacer
Lab Results- Spacer North East, Zanesville Job Information Request/Slurry 2391561/1 Rig Name H&P 531 Date 01/JUN/2017
Submitted By Sean Merrill Job Type Intermediate Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 9.625 in Depth MD 7185 ft BHST 63°C / 145°F
Hole Size 12.25 in Depth TVD 7185 ft BHCT 42°C / 108°F
Pressure 6500 psi
Tuned Spacer 37.7 gal/bbl Fresh Water
Spacer Properties Slurry Density 10.1 lbm/gal Slurry Yield 8.97 ft3/sack Water Requirement 60.23 gal/sack Water Source Fresh Water
Pilot Test Results Request ID 2391561/1 API Rheology - Spacer 04/JUN/2017 300 200 100 60 30 6 3 PV/YP 34 30 25 22 20 16 14 18.86 / 17.48
API Rheology - Spacer 04/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 Cond Time
(min) Conditioning Temp (ºF)
PV/YP
108 30 28 24 22 20 15 12 40 108 15.89 / 17.09
Wettability 04/JUN/2017 Starting Mud Vol. (ml)
Conductivity of Pure Spacer (Hn)
Conditioning Time (min)
Spacer (%) Conductivity (Hn)
Rod Test 04/JUN/2017 Temp (°F) Pass/Fail 108 PASS
Rheology Compatibility 04/JUN/2017 Test Temp (°F) Fluid Ratio 300 200 100 60 30 6 3 108 75M 39 28 18 14 10 5 4
50 50 39 28 23 19 10 8
25M 41 33 25 21 17 10 7
API Rheology - OBM 04/JUN/2017 Temp (ºF) 300 200 100 60 30 6 3 Cond Time
(min) Conditioning Temp (ºF)
PV/YP
108 32 25 16 12 8 6 4 40 108 27.76 / 5.49
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 11 (v. 4.4.18)
Lab Results- Lead North East, Zanesville Job Information Request/Slurry 2391559/1 Rig Name H&P 531 Date 01/JUN/2017
Submitted By Sean Merrill Job Type Intermediate Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 9.625 in Depth MD 7185 ft BHST 63°C / 145°F
Hole Size 12.25 in Depth TVD 7185 ft BHCT 42°C / 108°F
Pressure 6500 psi
Cement Information - Lead Design Conc UOM Cement/Additive
CorossaCem 0-100 % Non-Portland Cementitious Material 0-100 % Class A Cement 14.54 gal/sack Fresh Water 0-30 % BWOW Salt 0-10 % BWOC Suspension Aid 0-15 lb/sk Lost Circulation Material 0-3 % BWOC Free Water Control 0-3 % BWOC Fluid Loss Additive 0-10 % BWOC Thixotropic Additive 0-3 % BWOC Defoamer
Cement Properties Slurry Density 12.0 lbm/gal Slurry Yield 2.70 ft3/sack Water Requirement 14.54 gal/sack Total Mix Fluid 14.54 gal/sack Water Source Fresh Water Water Chloride 200 ppm
Operation Test Results Request ID 2391559/1 Mixability (0 - 5) - 0 is not mixable Mixability rating (0 - 5) Avg rpm mixing under load (~12,000) Blend addition time (sec) @ 4,000 RPM 5 12000 15
API Fluid Loss Test Temp (ºF) Test Pressure (psi) Test Time (min) API FL (cc/30 min) Meas. Vol. Calculated FL (<30 min) Conditioning time (min) 108 1000 30 30 70 35 120
Free Fluid API 10B-2 Con. Temp (F) Heat Time (min) Cond. Time (min) Static T. (F) Static time (min) Incl. (deg) % Fluid 108 90 120 108 120 0 0
API Rheology Temp (ºF) 300 200 100 60 30 6 3 Cond Time (min) 80 58 43 27 18 12 5 3 0
API Rheology Temp (ºF) 300 200 100 60 30 6 3 Cond Time (min) 108 73 56 37 26 16 5 3 120
Thickening Time - ON-OFF-ON Test Temp (ºF)
Pressure (psi)
108 6500 90 6:09 7:15 8:28 9:41 13.4 140 30
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 12 (v. 4.4.18)
Created: Thursday, June 08, 2017
UCA Comp. Strength End Temp (ºF) Pressure (psi) 50 psi (hh:mm) 100 psi (hh:mm) 8hr CS (psi) 12 hr CS (psi) 16 hr CS (psi) End CS (psi) End Time (hrs) 133 3000 3:48 5:32 154 209 250 285 20.05
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 13 (v. 4.4.18)
Thickening Time - ON-OFF-ON Graph:
UCA Comp. Strength Graph:
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 14 (v. 4.4.18)
Lab Results- Tail North East, Zanesville Job Information Request/Slurry 2391558/1 Rig Name H&P 531 Date 01/JUN/2017
Submitted By Sean Merrill Job Type Intermediate Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 9.625 in Depth MD 7185 ft BHST 63°C / 145°F
Hole Size 12.25 in Depth TVD 7185 ft BHCT 42°C / 108°F
Pressure 6500 psi
Cement Information - Tail Design Conc UOM Cement/Additive
HalCem 0-100 % Non-Portland Cementitious Material 0-100 % Class A Cement 4.74 gal/sack Fresh Water 0-30 % BWOW Salt 0-3 % BWOC Fluid Loss Additive 0-3 % BWOC Free Water Control
Cement Properties Slurry Density 15.6 lbm/gal Slurry Yield 1.17 ft3/sack Water Requirement 4.74 gal/sack Total Mix Fluid 4.74 gal/sack Water Source Fresh Water Water Chloride 200 ppm
Operation Test Results Request ID 2391558/1 Mixability (0 - 5) - 0 is not mixable Mixability rating (0 - 5) Avg rpm mixing under load (~12,000) Blend addition time (sec) @ 4,000 RPM 5 12000 15
API Rheology Temp (ºF) 300 200 100 60 30 6 3 Cond. Time (min) 80 255 185 108 74 46 24 20 0
API Rheology Temp (ºF) 300 200 100 60 30 6 3 Cond. Time (min) 108 245 195 148 113 78 35 26 120
API Fluid Loss Test Temp (ºF) Test Pressure (psi) Test Time (min) API FL (cc/30 min) Meas. Vol. Conditioning time (min) Conditioning Temp (ºF) 108 1000 30 50 25 120 108
Free Fluid API 10B-2 Con. Temp (F) Heat Time (min) Cond. Time (min) Static T. (F) Static time (min) Incl. (deg) % Fluid 108 90 120 108 120 0 0
Thickening Time Temp (ºF) Pressure (psi) Reached in (min) Start BC 30 Bc (hh:mm) 40 Bc (hh:mm) 50 Bc (hh:mm) 70 Bc (hh:mm) 100 Bc (hh:mm) 108 6500 90 32.6 3:19 3:24 3:49 4:11 4:16
UCA Comp. Strength End Temp (ºF) Pressure (psi) 50 psi (hh:mm) 100 psi (hh:mm) 500 psi (hh:mm) 1000 psi
(hh:mm) 8hr CS (psi) End CS (psi) End Time (hrs)
145 3000 3:38 3:46 4:41 6:05 1425 1443 8.06
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 15 (v. 4.4.18)
Thickening Time Graph:
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 16 (v. 4.4.18)
Lab Results- Primary North East, Zanesville Job Information Request/Slurry 2391560/1 Rig Name H&P 531 Date 01/JUN/2017
Submitted By Sean Merrill Job Type Intermediate Casing Bulk Plant Zanesville, OH
Customer Eclipse Resources Location Guernsey Well Yost B 5H
Well Information Casing/Liner Size 9.625 in Depth MD 1724 ft BHST 29°C / 84°F
Hole Size 12.25 in Depth TVD 1724 ft BHCT 21°C / 70°F
Pressure 1800 psi
Cement Information - Primary Design Conc UOM Cement/Additive
NeoCem™ Cement 0-100 % BWOC Class A Cement 5.24 gal/sack Fresh Water 0-10 % BWOC Accelerator 0-3 % BWOC Fluid Loss Additive 0-100 % BWOC Non-Portland Cementitious Material
Cement Properties Slurry Density 15.8 lbm/gal Slurry Yield 1.23 ft3/sack Water Requirement 5.24 gal/sack Total Mix Fluid 5.24 gal/sack Water Source Fresh Water Water Chloride 200 ppm
Operation Test Results Request ID 2391560/1 Mixability (0 - 5) - 0 is not mixable Mixability rating (0 - 5) Avg rpm mixing under load (~12,000) Blend addition time (sec) @ 4,000 RPM 5 12000 15
API Rheology Temp (ºF) 300 200 100 60 30 6 3 Cond Time (min) 80 188 137 80 56 36 20 16 0
API Rheology Temp (ºF) 300 200 100 60 30 6 3 Cond Time (min) 70 300 248 141 94 56 16 10 50
Free Fluid API 10B-2 Con. Temp (F) Heat Time (min) Cond. Time (min) Static T. (F) Static time (min) Incl. (deg) % Fluid 70 20 50 70 120 0 0
API Fluid Loss Test Temp (ºF) Test Pressure (psi) Test Time (min) API FL (cc/30 min) Meas. Vol. Conditioning time (min) Conditioning Temp (ºF) 70 1000 30 42 21 50 70
Thickening Time Temp (ºF) Pressure (psi) Reached in (min) Start BC 30 Bc (hh:mm) 40 Bc (hh:mm) 50 Bc (hh:mm) 70 Bc (hh:mm) 100 Bc (hh:mm) 70 1800 20 18.2 4:21 4:23 4:23 4:24 4:29
UCA Comp. Strength End Temp (ºF) Pressure (psi) 50 psi (hh:mm) 100 psi (hh:mm) 500 psi (hh:mm) 1000 psi (hh:mm) 8hr CS (psi) End CS (psi) End Time (hrs) 84 3000 4:59 5:20 7:51 11:21 526 1013 11.26
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 17 (v. 4.4.18)
Thickening Time Graph:
ECLIPSE RESOURCES I LLC EBUS Yost B 5H Intermediate Casing
Page 18 (v. 4.4.18)
4.5 Field Water Analysis
Service Supervisor J. STRAIN Water Source FRAC TANK
Temperature 78 [<80 F} pH. 7 [between 6-8 pH]
Specific Gravity 1.001 [1.000 - 1.005 see Chart] Chart in Kit shows comparisons of: Chlorides [<3,000 ppm @ 1.004 S.G.]
Calcium [<500 ppm @ 1.004 S.G.]
PASS FAIL Nessler's Nitrogen [Passing Parameters]
Color of Yellow [<4.5 ppm (mg/L)]
Tannin-Lignin
Sulfate
Black X Visible [if NO >200 ppm = FAIL]
Iron (Fe)