Post-Construction Storm Water Management Ordinance Authorized Enforcement Agency : Employees or designees of the Town Board will be the Town Staff, including the building inspector, fire inspector and Town Engineer. Staff will monitor when at construction sites, doing inspections of water/sewer laterals, inside business facilities, etc. Building Inspector and Fire Inspector will be asked to watch for any illicit discharge or illegal connections when on sites. Board of Appeals : Board of Appeals May Authorize provision to the ordinance with proof of unnecessary hardship and using other rules, procedures, duties and powers authorized by statue of hearing deciding appeals and authorizing variances. Ordinance Violation Discovered by Authorized Enforcement Agency (AEA) Problem continues AEA shall notify responsible party by certified mail of violation Problem Corrected Problem Continues Problem Corrected If owner disagrees with Authorized Enforcement Agency or Town Board they can request to appear before Board of Appeals Variance Denied Variance Granted Owner Does Not Correct Problem Owner Corrects Problem Town Corrects Problem & Bills Owner Bill not paid Costs are assessed to property Town Corrects Problem & Bills Owner Bill not paid Costs are assessed to property If violation may cause damage to properties, public facilities, or waters of the state, AEA can take emergency action to prevent such damage. Costs incurred by the Town shall be billed to the responsible party. AEA can authorize stop work order or request the Town Attorney to obtain a cease and desist order. AEA can revoke a permit for non compliance. Note : Stop-work order or permit revocation can be retracted Appeals

Upload: pierce

Post on 06-Jan-2016

21 views

Category:

Documents


3 download

DESCRIPTION

Ordinance Violation Discovered by Authorized Enforcement Agency (AEA). Post-Construction Storm Water Management Ordinance. AEA shall notify responsible party by certified mail of violation. Problem continues. Problem Corrected. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Post-Construction Storm Water Management Ordinance

Post-Construction Storm Water Management Ordinance

Authorized Enforcement Agency: Employees or designees of the Town Board will be the Town Staff, including the building inspector, fire inspector and Town Engineer. Staff will monitor when at construction sites, doing inspections of water/sewer laterals, inside business facilities, etc. Building Inspector and Fire Inspector will be asked to watch for any illicit discharge or illegal connections when on sites.Board of Appeals: Board of Appeals May Authorize provision to the ordinance with proof of unnecessary hardship and using other rules, procedures, duties and powers authorized by statue of hearing deciding appeals and authorizing variances.

Ordinance Violation Discovered by Authorized Enforcement Agency (AEA)

Problem continues

AEA shall notify responsible party by certified mail of violation

Problem Corrected

Problem Continues Problem Corrected

If owner disagrees with Authorized Enforcement Agency or

Town Board they can request to appear before Board of Appeals

Variance Denied Variance Granted

Owner Does Not Correct Problem

Owner Corrects Problem

Town Corrects Problem & Bills Owner Bill not paid Costs are assessed to property

Town Corrects Problem & Bills Owner Bill not paid Costs are assessed to property

If violation may cause damage to properties, public facilities, or waters of the state, AEA can take emergency action to prevent such damage.

Costs incurred by the Town shall be billed to the responsible party.

AEA can authorize stop work order or request the Town Attorney to obtain a cease and desist order.

AEA can revoke a permit for non compliance. Note: Stop-work order or permit revocation can be retracted

Appeals