PORTLAND WATER BUREAU
CONSTRUCTION MANAGEMENT INTERN1st CECOP INTERNSHIPBRANDEN RICHARD CONFER
PRESENTATION OVERVIEW
HISTORY OF PORTLANT WATER BUREAU
HOURS, SCHEDULES, AND WAGES
SERVICE GROUPS FOR PWB PROJECT INVOLVEMENT
OVERVIEW BIG PROJECTS USEFUL CLASSES TAKE AWAYS
FROM FOREST TO FAUCET, WE DELIVER THE BEST DRINKING WATER IN THE WORLD.
BRIEF HISTORY OF PWB PWB WAS ESTABLISHED IN 1851.
IN 1895, BULL RUN COMPLETED CONSTRUCTION OF CONDUIT 1 WHICH ALLOWED FLOW TO MT. TABOR.
CREDIT WAS DUE IN 1905 TO PWB FOR THE DECREASE IN DEATHS SINCE BULL RUN BECAME OPERATIONAL.
1927 WATER METERS WERE INSTALLED IN THE PORTLAND AREA TO ALL WATER SERVICES.
1930-1940 CHLORINE WAS FIRST INTRODUCE TO PREP WATER FOR TREATMENT AND ALLOWED FOR CLEANER WATER FOR PUBLIC USE.
BY 1962 BOTH DAM 1 AND 2 WERE CONSTRUCTED AT BULL RUN.
DURING THE 2000’S, TECHNOLOGY INCREASED ALLOWING FOR EFFICIENCY AND REUSABLE UTILITIES WHICH DECREASED WATER USAGE BY 80%.
IN 1995, PWB INSTALLED A 50 MILLION GALLON TANK AT POWELL BUTTE TO HELP DISTRIBUTE WATER TO CONSUMERS.
HOURS
I CHOSE MY OWN WORKING HOURS.
I WORKED 7:00AM TO 4:30PM.
30 MIN LUNCH. FLEXIBLE.
SCHEDUELSWAGES
THEY OFFERED A FLEX SCHEDULE.
9 HR WORK DAYS MON-THRU.
WORK 8 HR EVERY OTHER FRIDAY.
EVERY OTHER FRIDAY OFF.
HAD THE OPTION FOR MY FLEX DAYS.
MENTORS AND COWORKERS WORKED WELL WITH MY PERSONAL SCHEDULE.
40 HOUR WORK WEEKS.
19$ AN HOUR. PAYED
HOLIDAYS. NO BENEFITS. SICK DAYS
AFTER 90 DAYS.
ENGINEERING CM SERVICES GROUPTeresa Elliott
Chief Engineer
Stan VandeBergh
Principal EngineerWalter
LewandowskiSenior Engineer
Rick LappSr Eng
Associate
Jim ScanlonCAD Tech III
Roy MartinezInspection Manager
Branden ConferCM Intern
Kate BarrrettSenior
Inspector
Ted RoosSenior
Inspector
Clay LuperSenior Inspector
Project Involvement Road 10/
Watershed Interstate
Renovation Project
Hydrogravitram Fulton Pump
Station Mt. Tabor Lusted Hill
Road 10 Activates Erosion and traffic controls Saw Cutting Grinding (Change in spec..) Overlaying North and South side
widening Culvert replacements Reconditioning and paving Retaining wall
Road 10 Cont.… Pre Bid Meeting
To give the bidders an opportunity to ask questions and get answers about the project. Pre Con meeting
Contractor ask specific questions and submits submittals to the CM before project. Contract Weekly Meetings
Up coming schedule and communication on project details. Submittals
Items /materials needed for project. Kept record of each sub and response. RFI’s
Request for information between CM and Contractor. Chlorine Safety Certified
Chlorine station located close to project. Inspections
Inspected/ site walks to insure safety and progress for project.
INTERSTATE RENOVATION PROJECT Activities Administration
Reconciling of documentation for project.
Inspections Daily reports, safety, and
progress, punch lists. Electrical As-builds
Worked in Auto Cad and Micro Station to build the electrical As-build for IRP.
FULTON PUMP STATION ACTIVITIES INSPECTIONS
Inspected the sight to insure safety and progress. PROJECT MEETINGS
A collective meeting where we confer upcoming schedules and discuss potential problems.
PERMITS Permit revision.
RFI Request for Information.
Submittals
Hydrogravitram Involvement Built by Shab Levy 1983
Masonry Metal Work Cleaning Planning Organizing Scheduling
https://www.facebook.com/branden.confer.1/videos/1335081266506917/
Side Activities Wood Fair CM/GC Micro Station Operations/GIS Culvert
Inspections Surveying Air Compressor
Woodend Culvert & Largest Culvert.
Combusted Pipe at Mt.
Tabor.
Surveying at Watershed
Helpful CoursesEngineering PlanningSurveying Technical writing Fluid MechanicsAutoCAD
Take Away’s Understanding of job titles and roles within
PWB. Being clear and verbal. Don’t wait, just do. Follow up. Be a team player.
QUESTIONS???