portfolio maría martínez

23
about myself MARIA MARTINEZ FABREGAS 14th of July of 2010 PORTFOLIO

Upload: maria-martinez-fabregas

Post on 13-Mar-2016

219 views

Category:

Documents


2 download

DESCRIPTION

Architecture and Landscape Work

TRANSCRIPT

  • about myself MARIA MARTINEZ FABREGAS 14th of July of 2010PORTFOLIO

  • +12: Bedroom

    +9: Bathroom

    +6: Bedrooms

    +3: Bedrooms

    +0: hall and livingroom

    -3: bar

    -6: restaurant

    -9: Worker Plant

    Site plan

    01

  • The purpose of the project was to design a refuge-museum next to the wall, which has to solve the access, incorporating a stairs, eleva-tor or some element of communication between the two levels.

    The hostel museum emerges as a landmark in the landscape, a simile of headlight illuminates the wall and shows us the way, and as a for-tification that gives the Dominion the place.A permeable and natural element, whose faces are opening to the landscape and prolong the museum on the wall to incorporate our exhibi-tion +24: museum

    +21: museum

    +18: museum

    +15: museum hallFacade southSection

    02

  • 01

  • 02

  • 03

  • Purpose: Construction of a sports center with swimming pools near the river Ebro of large area.Location: In Zaragoza, Spain. Site near the river Ebro affected for very strong pres-ence of housing blocks on the street.Proposal:Create a public space along the river Ebro, bring people to the river, we pro-pose a compact building. the building is intended as a limit, which regulates the vision between the city and the river, from the city you can see the river, but from the river cant see the city. A perceptual play. The building faces the river and close to the city. We propose three main volumes like eyes looking to the river and a volume as limiting which forms a porch to the street of the

    01

    Entrance Plant

    Second Plant

    Third Plant

    South Facade. Looking the river

    North Facade. Since the city

  • 02

    Longitudinal section

    Entrance section

    section

  • The purpose of the project was to connect the city of Pamplona with ezcaba Mount, the territory was divided by the old railroad tracks, infrastructure, zoning, etc.It is proposed to create two lines of different nature, a natural and an urban axis, which is found and connected, form a combined trip between the two that allows this connection.The natural axis of the Arga river, extending the river walk, a forest bank walk in the city.The urban axis takes the old railroad tracks as a more urban walk divided into different levels (to solve the existing difference of levels).The walk is like a ribbon, which connects the down-town with the mountain, and it get into parts of the city, empty degraded public spaces, creating very interesting spaces.The walk is always combined with an urban axis, a more ordered geometric natural axis and an wild bank forest axis, the size of these is changing along the route, but with this intervention, ensuring a con-nection from green axis the city.It provides a green corridor of value that serves as natural protection. In the eld there are two areas of existing gardens, the project collects them and turns them into agricultural parks with a vocation of public space.

    East-west system: Providing a continuity in the city by creating a green corridor, providing the connection from the city center.

    North-south system: remove the barrier effect of the railroad tracks through a tratament as a stratum for regulating this relationship.

  • Project name: Vetlanda grouphomeClient: Vetlanda municipalityObject: New home for six disabled per-sonsSize: 680sqm.Stage: detail design

    New grouphome for six young disabled persons in Vetlanda. Apart from making the homes perfectly adapted for their needs we also focused on giving the project the feeling of six homes, trying to escape the image of an institution. The design had to adapt to a strict budget and timeframe. Building is planned to commence during 2010.w

    VETLANDA GROUPHOME Mara Martnez Fbregas2010 KjellgrenKaminsky architecture 01

    Housing tipologySite plan

    Housing Plant

  • VETLANDA GROUPHOME Mara Martnez Fbregas2010 KjellgrenKaminsky architecture 02

    Facade South

    Facade West

    Facade North

    Facade East

    Section tipology

    Section tipology Detail

    Detail CC1 Detail CC2

    Detail CC3

    Section

  • 6),,!.9"%2'PASSIVE HOUSES AS TYPE HOUSESKjellgren Kaminsky has produced Swedens rst serie of passive houses sold as type houses in collabo-ration with Emrahus. This is one of the rst to get built. It has been customized for the Nyberg family living in Borlnge, central Sweden.

    THE PASSIVE HOUSE CONCEPTPassive houses are extremely well-insulated buil-dings that are largely heated by the energy al-ready present in the building - people and our household equipment generate a lot of energy. Our energy simulations show that this villa will have an energy consumption for heating of only 25 kWh/myear.

    LIVING IN VILLA NYBERGThe autumn is closing in, but its still warm in the sun. Its Sunday morning and Im reading the newspaper in the kitchen. From here I can see al-most the whole house. The kitchen and the living room form one big open room. From there two corri-dors running along the atrium connects it with the bedrooms. If I look into the atrium I can see the doors to the bedrooms on the other side, there our kids are still fast asleep, they stayed up a bit too long yesterday watching movies.

    High summer sun stopped, while remaining low winter sun is admitted and gives light and heat.

    Used air is sucked into the bathroom and

    Warm fresh air is blown into the bedroom and living room

    Fresh air is taken from outside

    The use of hot air heats the cold fresh air in an air heat exchanger

    Ceilingthickness: 60 cmu-value:> 0.08

    Wallsthickness: 50 cmu-value:> 0.1

    Basicthickness: about 80 cmu-value: 0.09

    Windowu-value:> 0.85

    Situation

    Plant

    VILLA NYBERG Mara Martnez Fbregas2010 KjellgrenKaminsky architecture 01

  • Section

    Facade East

    Facade North

    Facade West

    VILLA NYBERG Mara Martnez Fbregas2010 KjellgrenKaminsky architecture 02

  • 01 VISUALISATION WORKS Mara Martnez Fbregas

    Work for university. 3 year. Light Flag. 2006

  • 02 VISUALISATION WORKS Mara Martnez Fbregas

    Work for university. 3 year. Radio Building 2006

  • 03 VISUALISATION WORKS Mara Martnez Fbregas

    Work for KjellgrenKaminsky architecture. 2010

  • about myself MARIA MARTINEZ FABREGAS 14th of July of 2010

    Thank you for your time