Table of Content

01 | Minimalism Residential A. Project Schedule B. Project Blueprint

02 | Untouctable A. Design Progress B. Prototype

03 | Tri County Water Treatment Plant Improvement A. Soil Profile Analysis B. Excavation Plan C. New Buildings Construction Site

Page 3: Portfolio Dec 22-min

Michael & Paul

ID Title Dur. Start Finish Assigned To Pred | | |

1 Rough Framing 10 9-27-2016 10-10-2016 N/A -

2 Cabinetry Measurement 2 9-30-2016 10-3-2016 N/A -

3 Waterproofing 11 9-30-2016 10-14-2016 N/A -

4 Blocking 5 10-4-2016 10-10-2016 N/A 1

5 Rough: Electrical 15 10-4-2016 10-24-2016 N/A 1

6 Drywall and Cement Board Installation15 10-11-2016 10-31-2016 N/A 1

7 Floor Installation 5 10-18-2016 10-24-2016 N/A -

8 Finalized 1 10-24-2016 10-24-2016 N/A -

9 Installation of electical 17 10-24-2016 11-15-2016 N/A -

10 Tile and Stone Installation 10 10-25-2016 11-7-2016 N/A 3

11 Skim Coat 10 11-1-2016 11-14-2016 N/A 6

12 Case and Base Molding 8 11-8-2016 11-17-2016 N/A 11

13 Door and Hardware 3 11-15-2016 11-17-2016 N/A 11

14 Painting 12 11-15-2016 11-30-2016 N/A 11

15 Garbage Disposal 1 11-18-2016 11-18-2016 N/A -

16 Cabinetry Installation 6 11-21-2016 11-28-2016 N/A -

17 Glass and Stone Measurement 9 11-23-2016 12-5-2016 N/A -

18 Cleaning 16 11-28-2016 12-19-2016 N/A -

19 Millwork revision 5 11-28-2016 12-2-2016 N/A 16

20 Glass and Stone Installation 3 12-5-2016 12-7-2016 N/A 17

21 Touch up 4 12-8-2016 12-13-2016 N/A 14

22 Final Walk Through 1 12-20-2016 12-20-2016 N/A 18, 21

20-Sep-2016 25-Sep-2016 02-Oct-2016 09-Oct-2016 16-Oct-2016 23-Oct-2016 30-Oct-2016 06-Nov-2016 13-Nov-2016 20-Nov-2016 27-Nov-2016 04-Dec-2016 11-Dec-2016 18-Dec-2016 25-Dec-2016 01-Jan-2017T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M

Rough Framing

Cabinetry Measurement

Waterproofing

Blocking

Rough: Electrical

Drywall and Cement Board Installation

Floor Installation

Finalized

Installation of electical

Tile and Stone Installation

Skim Coat

Case and Base Molding

Door and Hardware

Painting

Garbage Disposal

Cabinetry Installation

Glass and Stone Measurement

Cleaning

Millwork revision

Glass and Stone Installation

Touch up

Final Walk Through

Demolition and framing phase Construction phase Finishing phase

01 | Minimalism Residential A. Project Schedule

Page 4: Portfolio Dec 22-min

PROPOSED ELECTRICAL PLANEXISTING PROPOSED

01 | Minimalism Residential B. Project Blueprint

Page 5: Portfolio Dec 22-min

02 | Untouctable A. Design Progress

Page 6: Portfolio Dec 22-min

02 | Untouctable B. Prototype

Page 7: Portfolio Dec 22-min

03 | Tri County Water Treatment Plant Improvement A. Soil Profile Analysis

Page 8: Portfolio Dec 22-min

03 | Tri County Water Treatment Plant Improvement B. Excavation Plan

Page 9: Portfolio Dec 22-min

03 | Tri County Water Treatment Plant Improvement C. New Buildings Construction Site