portfolio - construction-eg.com portfolio… · 5 fouka bay –north coast turn key tatweer misr...

181

Upload: others

Post on 19-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Portfolio

    Version: Sep-2018

  • History

    Construction & Design Company ‘Constec’, an Egyptian

    joint stock company, established in 1989 and has been

    providing fully integrated contracting solutions since then.

    Currently, Constec is one of Egypt’s leading construction

    companies that ranks “1st Class General Contracting,

    Finishes & MEP” with rich experience in implementing

    industrial, residential, commercial and tourist projects

    including Infrastructure, Electromechanical works and

    Management.

  • Mission Statement

    Client satisfaction is our principal objective.

    To achieve that, we perform any undertaking assigned to us

    on time, within the allocated budget and within the

    specification set for the job; to assure all expectations are

    met.

  • Scope Of Activities

    We execute and manage turnkey projects through performing

    a variety of construction works and related services. Our

    experience covers the following sectors:

    – Residential Buildings & Compounds

    – Industrial & Warehouses Buildings

    – Commercial Buildings

    – Hotels & Resorts

    – Landscape and Urban Development

    – Treatment Plants

    – Infrastructure

  • Partners in Success

  • Eng. Mohamed Edrees Chairman

    Eng. Ashraf Abd El Hakam Managing Director

    Eng. Nouh Meshref Board Member

    Mr. Hazem Moustafa Board Member

    Eng. Fathia Shtewy Board Member

    Eng. Mohamed Ramadan Board Member

    Eng. Ahmed Aziz Board Member

    Board Of Directors

  • Chairman & Board

    ExecutiveManager

    HR Manager

    Admin Off

    Recruitment & Development

    IT Manager

    Programing & Development

    Networks

    Tech Support

    Procurement Manager

    Contracts Manager

    Owner Contracts

    S/C Contracts

    Purchasing Manager

    Buyers

    Technical Manager

    Projects Follow Up

    Shop Drawings

    Projects Invoices

    Q.S.

    Projects Manager

    HSE Manager

    Projects Controls

    Quality Control

    Sr. Planning Engineer

    Planning Engineers

    Cost Control

    Project Managers

    Construction Managers

    Site Engineers

    Tech. Office Engineer

    Electro-Mechanic

    Site Supervisors

    Surveyors

    Asset Manager

    Assets

    Drivers

    LogisticsTendering Manager

    Tendering

    Sr. Tendering Engineer

    Estimators

    Quantity Surveyors

    Electrical Mechanical

    Financial Manager

    Document Control

    General Accounting

    Banks and Treasury

    Treasury

    Banks

    Contractors Accounts

    Customer Accounts

    Site Accountants

    Warehouse

    Organization Chart

    Internal Audit & Quality Assurance

    Business Development

    E.M. Secretary

  • Overview

    Authorized Capital 100 Million EGP

    Issued Capital 20 Million EGP

    Assets 9 Million EGP

    Staff Strength 300 Employees

    Supplementary Staff 500 Employees

  • ISO 9001 & 140001 Certificate

  • Personnel

    Management Team 12

    Office Engineers 25

    Office Administration & Financing 20

    Projects Managers 10

    Site Managers 10

    Site Engineers 45

    Technical Site Helpers and Foreman 178

  • Equipment

    Earth Moving

    Equipment

    15%

    Generators &

    Handling

    Equipment

    15%

    Workshop

    Equipment

    4%

    Light Equipment

    13%

    Transprtation

    Equipment

    37%

    Transportation

    Equipment

    21%Cranes

    9%

    Earth Moving Equipment

    Generat ors & Handlin g Equipm ent

    Workshop Equipment

    Light Equipment

    Transprtation Equipment

    Scaffold ing

    Cranes

  • Equipment

  • Equipment

  • Equipment

  • Equipment

  • Equipment

  • Capacity

    Produces 30,000 cubic meter of concrete per month

    Excavates in normal soil of 150,000 cubic meter per month

    A rebar workshop of 15,000 tons per month.

  • Ongoing Projects

    No. Project NameScope ofWorks

    Client Consultant Value (EGP)

    1 Pyramids Heights Core & ShellSamcrete

    DevelopmentABCG 65,000,000

    2 Villette Core & Shell SODIC Ehaf 90,000,000

    3 Cairo Business Park Civil Works Misr Italia ECB 95,000,000

    4 Block 34 – Eastown Core & Shell SODIC EGEC 90,000,000

    5 Fouka Bay – North Coast Turn Key Tatweer Misr KAF 90,000,000

    6 Hyde Park – CL 6 & 16 Turn Key Hyde Park ECG 85,000,000

    7 October Plaza Core & Shell SODIC Ehaf 125,000,000

    8 AEON Civil Works Marakez ABCG 70,000,000

    9 Beltag WWTP (6500 m3/day) Turn Key Gharbia HCWW ACE 200,000,000

    10 Hyde Park – CL 19 Turn Key Hyde Park ECG 140,000,000

    Note: Core & Shell Scope includes; exterior finishes (painting, aluminum windows,

    ornamental steel works, marble, etc…), interior finishes (wooden doors, marble for

    entrance and common area, painting, etc…), and all MEP works

  • PROJECTS AND CLIENTS

    Success story extends for more than 28 years

  • I. RESIDENTIAL BUILDINGS

    & COMPOUNDS

    Success story extends for more than 28 years

  • I. Residential Buildings & Compounds

    SODIC Projects 270 Million EGP

    Hyde Park – CL 19 140 Million EGP

    October Plaza 125 Million EGP

    Block 34 Eastown 90 Million EGP

    Hyde Park – CL 6&16 85 Million EGP

    AEON – Marakez 70 Million EGP

    Pyramids Heights – SamCrete in 6th October city 65 Million EGP

    Green 3 in Zayed 60 Million EGP

    Royal City compound in Zayed 70 Million EGP

    Green Waves in Zayed 65 Million EGP

    Green Residence 1 in Zayed 28 Million EGP

    Green Residence 2 in Zayed 28 Million EGP

    Green Hills Compound in Zayed 19 Million EGP

  • SODIC Spine - West Town

    Construction of Blocks 28, 29, 32, 33 comprising a total of 59

    Core & Shell Villas of different Models and areas

    Location: Zayed (West Town)

    Consultant: Al Amar (AMG)

    Owner: SODIC

    Duration : 1 Year

    Contract Date : 2015

    Project Value 30 Million EGP

  • SODIC Spine - West Town

  • SODIC Spine - West Town

  • SODIC Spine - West Town

  • SODIC Spine - West Town

  • SODIC Phase 10 Block 4 - West Town

    Residential Compound comprises 17 Multi Story Semi

    finished Buildings of different Models and areas, in addition

    to the construction of an electrical room

    Location: Zayed (West Town)

    Consultant: Al Amar (AMG)

    Owner: SODIC

    Duration : 18 Months

    Contract Date : 2015

    Project Value 70 Million EGP

  • SODIC Phase 10 Block 4 - West Town

  • SODIC Phase 10 Block 4 - West Town

  • SODIC Phase 10 Block 4 - West Town

  • SODIC Phase 10 Block 4 - West Town

  • SODIC Villette

    Residential Compound comprises 22 Semi Finished Town

    Houses and 17 Semi Finished Twin Houses, of different

    Models and areas.

    Location : New Cairo (East Town)

    Consultant: EHAF

    Owner: SOREAL for Real Estate

    Investment (SODIC)

    Duration : 18 Months

    Contract Date : 2017

    Project Status: Under Construction

    Project Value 95 Million EGP

  • SODIC Villette

  • Hyde Park – Cluster 19

    Residential Compound comprises 44 Fully Finished Town

    and Twin Houses (G+2) of different Models and areas.

    Scope of works include; skeleton works, interior & exterior

    finishes and general site works.

    Location: New Cairo

    Consultant: ECG

    Owner: Hyde Park

    Duration: 17 Months

    Contract Date: 2018

    Project Status: Under Construction

    Project Value 140 Million EGP

  • October Plaza

    Residential Compound comprises 8 Semi Finished Multistory

    buildings (G+3) of different Models and areas.

    Scope of works include; skeleton works, design & execution

    of post tension slabs, interior & exterior finishes and site

    works.

    Location : 6th October

    Consultant: Ehaf

    Owner: SODIC

    Duration : 12 Months

    Contract Date : 2017

    Project Status: Under Construction

    Project Value 125 Million EGP

  • SODIC Block 34 - Eastown

    Residential Compound comprises 11 Semi Finished Multi

    Story Buildings of different Models and areas. Scope of works

    include; skeleton, interior finishes, exterior finishes and

    general site works.

    Location : New Cairo (East Town)

    Consultant: EGEC - Engineering House of Expertise

    Owner: SODIC

    Duration : 18 Months

    Contract Date : 2017

    Project Status: Under Construction

    Project Value 90 Million EGP

  • SODIC Block 34 - Eastown

  • Hyde Park – Cluster 6 & 16

    Residential Compound comprises 51 Semi Finished Town and

    Twin Houses (G+2) of different Models and areas, in addition

    to the interior finishes of 21 Town Houses and Twin Houses.

    Scope of works include; skeleton works, interior & exterior

    finishes and general site works.

    Location: New Cairo

    Consultant: ECG

    Owner: Hyde Park

    Duration: 10 Months

    Contract Date: 2017

    Project Status: Under Construction

    Project Value 90 Million EGP

  • Hyde Park

  • AEON - Marakez

    Residential Compound comprises 6 Multistory buildings, of

    different Models and areas.

    Location: Six October City.

    Consultant: Active Brains

    Owner: Marakez – Mall of Arabia

    Duration : 12 Months

    Contract Date : 2018

    Project Status: Under Construction

    Project Value 70 Million EGP

  • AEON - Marakez

  • Pyramids Heights – SamCrete in 6th

    October city

    Residential Compound comprises 40 Villas, of different

    Models and areas.

    Location: Six October City.

    Consultant: Active Brains Consulting Group (ABCG)

    Owner: SamCrete

    Duration : 18 Months

    Contract Date : 2016

    Project Status: Under Construction

    Project Value 65 Million EGP

  • Pyramids Heights – SamCrete in 6th

    October city

  • Green 3 in Zayed

    Turnkey residential compound comprising of 35 Twin Houses

    and 110 Apartment Units in several Multistory Buildings

    Location: Zayed

    Area: 54,600 m2

    Consultant: El Gabaly Consultant

    Owner: Mabany for Real Estate Investment

    Duration : 2 Years

    Contract Date : 2010

    Project Value 60 Million EGP

  • Green 3 in Zayed

  • Green 3 in Zayed

  • Green 3 in Zayed

  • Royal City Compound in Zayed

    Turnkey residential compound comprising the construction of

    two phases of 45 and 21 villas of different models and size

    Location: Zayed

    Consultant: Mohram Bakhoum Infrosefk

    Owner: Al-Babtain Group “Kuwait”

    Duration : 2 Years

    Contract Date : 2008

    Project Value 70 Million EGP

  • Royal City Compound in Zayed

  • Royal City Compound in Zayed

  • Green Waves Compound in Zayed

    Turnkey residential compound comprises the construction of

    two phases of 10 Multi Story Buildings & 4 Villas then 5

    Multi Story Buildings of different models and sizes

    Location: Zayed

    Consultant: Urban Projects Office

    Owner: Mabany Real Estate Co.

    Duration : 3 Years

    Contract Date : 2010

    Project Value 65 Million EGP

  • Green Residence 1 in Zayed

    Turnkey residential compound comprising of 120 Apartment

    Units in 7 Multistory Buildings

    Location : Zayed

    Area: 20,000 m2

    Consultant: Engineer M. Omar Ghazal

    Owner: Mabany for Real Estate Investment

    Duration : 2 Years

    Contract Date : 2005

    Project Value 28 Million EGP

  • Green Residence 1 in Zayed

  • Green Residence 1 in Zayed

  • Green Residence 2 in Zayed

    Turnkey residential compound comprising of 115 Apartment

    Units in 7 Multistory Buildings

    Location: Zayed

    Area: 20,000 m2

    Consultant: PhD. Eng. M. Omar Ghazal

    Owner: Mabany for Real Estate Investment

    Duration : 2 Years

    Contract Date : 2007

    Project Value 28 Million EGP

  • Green Residence 2 in Zayed

  • Green Residence 2 in Zayed

  • Green Hills Compound in Zayed

    Residential compound comprising 4 multistory buildings and

    45 residential villas of different models and size

    Location: Zayed

    Consultant: En. Integrated

    Consulting Group (JADE)

    PhD Eng. Ayman Meselhy

    Owner: Egypt Real Estate

    Development

    Duration : One Year

    Contract Date : 2007

    Project Value 19 Million EGP

  • Green Hills Compound in Zayed

  • Green Hills Compound in Zayed

  • Green Hills Compound in Zayed

  • II. HOTELS & RESORTS

    Success story extends for more than 28 years

  • II. Hotels and Resorts

    Royal Palm Beach Hotel in Hurghada 200 Million EGP

    Amer Group Projects 175 Million EGP

    Fouka Bay – North Coast 90 Million EGP

    Caesar – North Coast 75 Million EGP

    Movenpick Hotel in Al Haram 45 Million EGP

    Multi Purpose Building in Suez City 24 Million EGP

    Palm Beach Hotel 12 Million EGP

    Mubarak Hotel in Siwa Oasis 6 Million EGP

    Pyramisa Village in Hurghada 4 Million EGP

    Officers House in Sidi Barani 2 Million EGP

    Pyramisa Hotel 1 Million EGP

  • Royal Palm Beach Hotel in Hurghada

    Construction of the hotel comprising 350 rooms on an area of

    60,000 m2 , including the main building , swimming pool, soft

    and hard scape

    Location of the project: Hurghada City

    Area: 60,000 m2

    Consultant: ASA Consultant-

    Eng. Omar Zatoun

    Owner : Red Sea for Tourism Development

    Duration : 4 Years

    Contract Date : 2005

    Project Value 200 Million EGP

  • Royal Palm Beach Hotel in Hurghada

  • Royal Palm Beach Hotel in Hurghada

  • Royal Palm Beach Hotel in Hurghada

  • Amer Group Projects

    Specializing in Turn Key projects for Recreational Resorts

    projects.

    Total Projects 175 Million EGP

    50 M EGP 55 M EGP

    Start of Journey

    South Beach Project

    Challenging Scope

    South Beach - Water Treatment Plant

    Client Satisfaction

    Porto Sokhna – Golf Bay

    New Challenge

    Hanging Gardens Platform 5

    5 M EGP 65 M EGP

  • Porto Sokhna – South Beach

    Turn Key project comprises construction and handover of 7

    multistory Buildings: H2, H4, H5, H7, RU1, RU2 &RU3

    comprising a total of 348 chalet

    Location: Sokhna

    Consultant: Shaker Group and

    Moharam Bakhoum “ACE”

    Owner : Amer Group

    Duration : 2 Years

    Contract Date : 2013

    Project Value 50 Million EGP

  • Porto Sokhna – South Beach

  • Porto Sokhna – South Beach

  • Porto Sokhna – South Beach

  • Porto Sokhna – South Beach

  • Porto Sokhna – South Beach WTP

    Construction of the Porto South Beach main Water

    Treatment Plant of daily capacity 800 m3/day

    Location: Sokhna

    Consultant: Shaker Group and

    Moharam Bakhoum “ACE”

    Owner : Amer Group

    Duration : 1 Year

    Contract Date : 2013

    Project Value 5 Million EGP

  • Porto Sokhna – South Beach WTP

  • Porto Sokhna – Golf Bay

    Turn Key project comprises construction and handover of 4

    Multistory Buildings: B1, B2, B3 & B4 comprising a total of

    374 chalet

    Location: Sokhna

    Consultant: Hill International

    and ACE

    Owner : Amer Group

    Duration : 2 Years

    Contract Date : 2013

    Project Value 55 Million EGP

  • Porto Sokhna – Golf Bay

  • Porto Sokhna – Golf Bay

  • Porto Sokhna – Golf Bay

  • Porto Sokhna – Hanging Gardens (PL5)

    Construction of Hanging Gardens Platform 5 consisting of 12

    Multi Story Building comprising 294 Chalets of different

    models and areas

    Location: Sokhna

    Consultant: Hill International and

    ACE

    Owner : Amer Group

    Duration : 1 Year

    Contract Date : 2016

    Project 65 Million EGP

  • Porto Sokhna – Hanging Gardens (PL5)

  • Fouka Bay – North Coast

    Turn Key recreational compound for two platforms

    comprising 33 Twin House of different Models and areas.

    Location: Ras El Hekma – North Coast

    Consultant: KAF Consultant

    Owner : Tatweer Misr

    Duration : 16 Months

    Contract Date : 2017

    Project Status: Under Construction

    Project Value 90 Million EGP

  • Fouka Bay – North Coast

  • SODIC Caesar in Ras El Hekma

    Construction of Zone A,B & C consisting of 45 Core & Shell

    villas in addition to the external finishes

    Location: Ras El Hekma – North Coast

    Consultant: Active Brains

    Owner : SODIC (Tabrook

    for Development)

    Duration : 18 Months

    Contract Date : 2015

    Project Value 75 Million EGP

  • SODIC Caesar in Ras El Hekma

  • SODIC Caesar in Ras El Hekma

  • Movenpick Hotel in Al Haram

    Turn Key project comprises construction and fully furnishing

    of 148 rooms and suits as an extension of the existing

    Movenpick Hotel on a total area of 4,000 m2

    Location: Giza

    Area: 4,000 m2

    Consultant: Integrated Consultant

    Group “Gayed”- Dr. Aymen Meselhy

    Owner : Tourism Urbanization Company

    Duration : 3 Years

    Contract Date : 2009

    Project Value 45 Million EGP

  • Movenpick Hotel in Al Haram

  • Movenpick Hotel in Al Haram

  • Movenpick Hotel in Al Haram

  • Movenpick Hotel in Al Haram

  • Movenpick Hotel in Al Haram

  • Multi Purpose Building in Suez City

    Turnkey Project comprises the construction of a reinforced

    concrete multi purpose building on an area of 20,000 m2.

    Including all the interior & exterior finishing , MEP and

    landscape work. The Project Consists of:

    1. 120 Room Hotel Building

    2. Main Building

    3. 1,000 m2 Auditorium

    Project Value 24 Million EGP

  • Multi Purpose Building in Suez City

    Location : Suez City

    Area: 20,000 m2

    Consultant: Barakat & Associates-Dr Magdy Barakat

    Owner : Al Nasr for Petroleum Co.

    Contract Date : 2010

  • Multi Purpose Building in Suez City

  • Multi Purpose Building in Suez City

  • Multi Purpose Building in Suez City

  • Palm Beach Hotel

    Turnkey project comprising the construction of: 8 Suits , 92

    Rooms , Restaurant, Kitchen , Laundry , Cafeteria Beach

    Swimming, Pool with an area

    of 420 m2.

    Location : Hurghada

    Consultant: ASSA Consulting

    Eng. Omar Zatoun

    Owner : Red Sea for Tourism

    Development

    Duration : One Year

    Contract Date : 2005

    Project Value 12 Million EGP

  • Project 4 Million EGPProject 6 Million EGP

    Mubarak Hotel in Siwa Oasis

    Construction of the Olympic Village Hotel which comprises the following:

    – 4 Main Suits

    – 3 Presidential Suits

    – 60 Rooms

    – Restaurant

    – Kitchen

    – Laundry

    – Landscape

    Location: Siwa Oasis

    Consultant: Egyptian Engineering House Dr. Hany El Gamal

    Owner : Region of Western Military

    Duration: 18 Months

    Contract Date : 2001

    Pyramisa Village in Hurghada

    Construction of the Market Facility which comprises the following:

    – Antique Shops

    – Main Gate

    – Fences

    Location: Hurghada City

    Consultant: Decoration Office Omar Ghoneim

    Owner : Misr Real Estate Development

    Duration : One Year

    Contract Date : 2005

    II. Hotels and Resorts

  • Project One Million EGPProject 2 Million EGP

    Officers House in Sidi Barani

    Construction of officers hotel which

    comprises 100 rooms

    Location : Sidi Barani

    Consultant: Egyptian Engineering House PhD. Eng. Hany El Gamal

    Owner : Region of Western Military

    Duration : One Year

    Contract Date : 2001

    Pyramisa Hotel

    Foundations works and retaining walls for the

    Pyramisa Hotel in Dokki

    Location : Cairo City

    Consultant: Arab Consulting Group

    Owner : Pyramisa Tourism “Mahmoud Azab”

    Duration : One Year

    Contract Date : 1999

    II. Hotels and Resorts

  • III. COMMERCIAL

    BUILDINGS

    Success story extends for more than 28 years

  • III. Commercial Buildings

    Rofayda Health Park 75 Million EGP

    Cairo Business Park 95 Million EGP

    Shorouk Academy 30 Million EGP

    Hyper One 10th of Ramadan 23 Million EGP

    Eastern Suburbs Mall in 5th Settlement 20 Million EGP

    Tivoli Dome Zayed 15 Million EGP

    Extension of ITS Company Building 14 Million EGP

    Convention & Conference Hall in Sidi Barani 4 Million EGP

    Presidential Hall Building –Nozha Airport 3 Million EGP

    Schools in Fayoum City 2.5 Million EGP

    Olympic Boxing & Martial Arts in Siwa 1.5 Million EGP

    Mosque in Cairo Alexandria Road One Million EGP

    Mosque in Al Ahram Heights 850,000 EGP

  • Rofayda Health Park

    Construction of a medical center of two main buildings;

    Clinics building, Maternity & Dar Al Oyoun Hospitals

    Location: Zayed

    Area: 17,000 m2

    Consultant: Engineering Office-

    Eng. Alaa Abou El Ezz

    Owner: Mabany for Real

    Estate Investment

    Duration: 2 Years

    Contract Date: 2013

    Project Value 75 Million EGP

  • Rofayda Health Park

  • Rofayda Health Park

  • Rofayda Health Park

  • Cairo Business Park

    Administrative Buildings comprises 4 Multi Story Semi

    finished Buildings, on two phases, on a total BUA of 33,000

    m2

    Location: New Cairo

    Area: 33,000 m2

    Consultant: ECB Consulting –

    PhD. Eng. Hany El Zyat

    Owner: Misr Italia

    Duration: 2 Years

    Contract Date: 2017

    Project Status: Under Construction

    Project Value 95 Million EGP

  • Cairo Business Park

  • Cairo Business Park

  • Shorouk Academy

    Construction of Applied Arts building, Economy building,

    and R&D Building with a total BUA of 23,000 m2

    Location: El Shorouk City

    Area: 23,000 m2

    Consultant: PhD. Eng. Amr El Halafawy

    Owner: 10th of Ramadan for development and educational

    services Co.

    Duration : 9 Months

    Contract Date : 2016

    Project Status: Under Construction

    Project Value 30 Million EGP

  • Shorouk Academy

  • Shorouk Academy

  • Hyper One in 10th of Ramadan City

    Construction of Hyper One commercial mall at Cairo

    Ismailia main road on an area of 12,000 m2 comprising :

    1. Exhibition Area

    2. Administration Building

    3.Infrastructure Work

    Project Value 23 Million EGP

  • Hyper One in 10th of Ramadan City

    Location: 10th of Ramadan City

    Area: 12,000 m2

    Consultant: MA Consulting

    Office-Dr. Moamen Afify

    Owner : Eng. M. Hawary

    Duration : 2 Years

    Contract Date : 2011

  • Hyper One in 10th of Ramadan City

  • Hyper One in 10th of Ramadan City

  • Eastern Suburbs Mall in 5th Settlement

    Construction of “Eastern Suburbs” commercial mall in 5th

    Settlement in front of AUC’s Gate 4

    Location : 5th Settlement

    Area: 10,000 m2

    Consultant: Space Consultants

    Owner : Misr Real Estate Management

    Duration : 18 Months

    Contract Date : 2013

    Project Value 20 Million EGP

  • Tivoli Dome in Zayed

    Construction of “Tivoli Dome” commercial mall on an area of

    6,000 m2 , consisting of basement , ground floor and three

    typical floors

    Location : Zayed

    Area: 6,000 m2

    Owner : Mabany for Real Estate Investment

    Duration : 2 Years

    Contract Date : 2010

    Project Value 15 Million EGP

  • Tivoli Dome in Zayed

  • Tivoli Dome in Zayed

  • Extension of ITS Company Building

    Construction and finishing work of the ITS extension

    building

    Location : Nasr City

    Consultant: Building Consulting

    Group PhD. Alaa Sayed

    Owner : ITS Company

    Duration : 2 Years

    Contract Date : 2008

    Project Value 14 Million EGP

  • Extension of ITS Company Building

  • Extension of ITS Company Building

  • Project Value 4 Million EGP Project Value 3 Million EGP

    Convention & Conference Hall

    in Sedi Barani

    Construction and finishing work of the

    convention & conference hall in Sidi Barani

    Location : Sidi Barani

    Consultant: Egyptian Engineering House PhD. Eng. Hany El Gamal

    Owner : Region of Western Military

    Contract Date : 2000

    Presidential Hall Building –

    Nozha Airport

    Construction and finishing work of the

    Presidential Hall Building –Nozha Airport

    Location : Alexandria City

    Consultant: Egyptian Engineering House PhD. Hany El Gamal

    Owner : Northern Compound Military

    Duration : One Year

    Contract Date : 2002

    III. Commercial Buildings

  • Project Value 2.5 Million EGP Project Value 1.5 Million EGP

    Schools in Fayoum City

    Construction and finishing works of 4

    schools

    Location : Fayoum City

    Consultant: PhD. Eng. Maher El Nemer

    Owner : General Authority for Educational Buildings

    Duration : One Year

    Contract Date : 2002

    Olympic Boxing & Martial

    Arts Hall in Siwa

    Construction and finishing work of the

    Olympic Boxing & Martial Arts Hall in Siwa

    Location : Siwa

    Consultant: Egyptian Engineering House PhD. Hany El Gamal

    Owner : Region of Western Military

    Duration: One Year

    Contract Date : 2000

    III. Commercial Buildings

  • Mosque in Cairo Alexandria

    Road

    Construction and finishing work of a 600 m2

    Ottoman Style Mosque

    Location : Cairo Alexandria Road

    Area : 600 m2

    Consultant: Eng. Mohamed Ghazal

    Owner : Mabany for Investment

    Contract Date : 2004

    Mosque in Al Ahram Heights

    Construction and finishing work of a 400 m2

    Mosque

    Location : El Ahram Heights

    Area : 400 m2

    Owner : 6 October Association

    Contract Date : 2002

    III. Commercial Buildings

    Project Value 1 Million EGP Project Value 850,000 EGP

  • IV. INDUSTRIAL &

    WAREHOUSES

    Success story extends for more than 28 years

  • IV. Industrial & Warehouses

    Jushi Fiberglass Factory 85 Million EGP

    Abou Rawash Warehouse 77 Million EGP

    Infofort Warehouse in 6th October City 38 Million EGP

    Aramex Warehouse in Borg El Arab City 24 Million EGP

    F2 Factory in Sokhna 16 Million EGP

    F5 Factory in Sokhna 16 Million EGP

    F3 Factory in Sokhna 12 Million EGP

    Aramex Warehouse in 6th October City 10 Million EGP

    Metex Factory in Port Said 2 Million EGP

    Master Leather Factory in 6th October City 1.5 Million EGP

    Salmiya Factory in El Salhia El Gedida One Million EGP

    Mill in 10th of Ramadan City One Million EGP

  • Jushi Fiberglass Factory

    Construction and finishing of 45,000 m2 reinforced concrete

    industrial facility

    Location: Industrial Zone - Sokhna

    Area:45,000 m2

    Consultant: Building Consulting Group

    “Benaa” Dr. Alaa El Sayed

    Owner : Jushi Egypt for Fiber Glass

    Industry S.A.E

    Duration : 2 Years

    Contract Date : 2012

    Project Value 85 Million EGP

  • Jushi Fiberglass Factory

  • Jushi Fiberglass Factory

  • Jushi Fiberglass Factory

  • Jushi Fiberglass Factory

  • Abou Rawash Warehouse

    Construction of 5 Warehouses on a total area of 100,000 m2

    Location : Abou Rawash

    Area:100,000 m2

    Consultant: Egyptian House

    Engineer-Ph.D. Hany El Gamal

    Owner : Egyptian Company

    for Storage Services

    Duration : 3 Years

    Contract Date : 2005

    Project Value 77 Million EGP

  • Abou Rawash Warehouse

  • Abou Rawash Warehouse

  • Infofort Warehouse

    Construction of steel structure warehouse with a total area of

    23,000 m2 and reinforced administration building

    Location : 6th October City

    Area:23,000 m2

    Consultant: MA Consulting Office-

    Dr. Moamen Afify

    Owner : Infofort Company

    Duration : 2 Years

    Contract Date : 2010

    Project Value 38 Million EGP

  • Infofort Warehouse

  • Infofort Warehouse

  • Infofort Warehouse

  • Infofort Warehouse

  • Aramex Warehouse – Borg El Arab

    Construction of Aramex Company Warehouse, consisting of a

    steel structure warehouse with a total area of 2,500 m2 and

    reinforced administration building

    Location : Borg El Arab City

    Area: 2,500 m2

    Consultant: MA Consulting Office-

    Dr. Moamen Afify

    Owner : Aramex –Masharek Company

    Duration : One Year

    Contract Date : 2012

    Project Value 24 Million EGP

  • Aramex Warehouse – Borg El Arab

  • Aramex Warehouse – Borg El Arab

  • F2 Factory

    Construction of steel truss of 4,000 m2 area and two story

    reinforced concrete administration buildings with an area of

    800 m2

    Location: Sokhna

    Area: 4,800 m2

    Consultant: Building Consulting Group

    “Benaa” Dr. Alaa El Sayed

    Owner : Egypt TEDA Investment Company

    Duration : One Year

    Contract Date : 2004

    Project Value 16 Million EGP

  • F5 Factory

    Construction of F5 factory comprising 2 story concrete

    structure with an area of 5,400 m2

    Location: Sokhna

    Area: 5,400 m2

    Consultant: Building Consulting Group

    “Benaa” Dr. Alaa El Sayed

    Owner: Egypt’s Suez China

    Real Estate Development

    Duration: One Year

    Contract Date: 2008

    Project Value 16 Million EGP

  • F5 Factory

  • F3 Factory

    Construction of F3 factory comprising 2 story concrete

    structure with an area of 5,400 m2

    Location: Sokhna

    Area: 5,400 m2

    Consultant: Building Consulting Group

    “Benaa” Dr. Alaa El Sayed

    Owner : Egypt’s Suez China

    Real Estate Development

    Duration : 9 Months

    Contract Date : 2008

    Project Value 12 Million EGP

  • F3 Factory

  • Aramex Warehouse – 6th October

    Construction of Aramex Company Warehouse, consisting of a

    steel structure warehouse with a total area of 2,500 m2 and

    reinforced administration building

    Location: 6th October City

    Consultant: MA Consulting Office-

    Dr. Moamen Afify

    Owner : Aramex-Masharek Company

    Duration : One Year

    Contract Date : 2012

    Project Value 10 Million EGP

  • Metex Factory in Port Said

    Design and Construction of Metex factory for paper production

    Location: Port Said City

    Area : 2,000 m2

    Consultant: Egyptian Engineer House

    Owner : Metex for International Industries

    Contract Date : 1990

    Leather Factory

    Construction of a leather factory on an area of 2,000 m2

    Location : 6th October City

    Area: 2,000 m2

    Consultant: PhD Eng. Sherif Abou El Maged

    Contract Date : 1997

    IV. Industrial & Warehouses

    Project Value 2 Million EGP Project Value 1.5 Million EGP

  • Mill in 10th Of Ramadan City

    Production of reinforced concrete of 1,200 m2 for the manufacturing and operation of the sheet and an adjoining office building

    Location : 10th of Ramadan City

    Area: 1,200 m2

    Owner : Ms. Amany Abd El Rahman

    Contract Date : 1999

    Salmiya Factory

    Construction of a warehouse Building and refrigerated products

    Location : El Salhiya El Gedida

    Area: 1,000 m2

    Consultant: PhD Eng. Sherif Abou El Maged

    Owner : Salmiya for Food Industry

    Contract Date : 1998

    IV. Industrial & Warehouses

    Project Value One Million EGP Project Value One Million EGP

  • V. INFRASTRUCTURE

    PROJECTS

    Success story extends for more than 28 years

  • V. Infrastructure Projects

    Beltag WWTP - Tanta 200 Million EGP

    EFC Water Desalination Plant in Sokhna 35 Million EGP

    Rehabilitation and renovation of

    Luxor Cornish , City Gates and Roundabouts 10 Million EGP

    Aircraft Engines Industry 8 Million EGP

    Water Tank in Sokhna 6 Million EGP

    Main Substation of Phosphate Factory – Sokhna 4 Million EGP

    Waste Water Treatment Plant in Wadi Hof 4 Million EGP

    Waste Water Treatment Plant in El Mahala El Kobra 3 Million EGP

    Waste Water Treatment Plant in Mansoura One Million EGP

    Water Desalination Plant in Sokhna One Million EGP

  • Beltag WWTP

    By “EMIT GROUP – CONSTEC JV”

    Turn key project for the construction of 6500 m3/day

    including all civil works, tanks, electromechanical works and

    water treatment systems.

    Location : Tanta

    Consultant: Moharam Bakhoum (ACE)

    Owner : Gharbia HCWW

    Duration : Two years

    Contract Date : 2018

    Project Status: Under Construction

    Project Value 200 Million EGP

  • Beltag WWTP

  • Beltag WWTP

  • Water Desalination Plant

    Construction of 4500 m3/day including all A/M, tanks, pumps

    and administration buildings and RO System (Severn Trent

    Service Company)

    Location : Sokhna

    Consultant: Moharam Bakhoum

    Owner : Egyptian Fertilizers

    Company

    Duration : One Year

    Contract Date : 2005

    Project Value 35 Million EGP

  • Water Desalination Plant

  • Water Desalination Plant

  • Water Desalination Plant

  • Water Desalination Plant

  • Water Desalination Plant

  • Water Desalination Plant

  • Water Desalination Plant

  • Rehabilitation and renovation of Luxor

    Cornish ,City Gates and roundabout

    Rehabilitation and renovation of 3.5 Km Luxor Cornish ,

    City Gates and roundabouts

    Location : Luxor City

    Distance: 3.5 Km

    Consultant: Eng. Hassan

    Dahrouj

    Owner : Luxor City Council

    Duration : One Year

    Contract Date : 2001

    Project Value 10 Million EGP

  • Rehabilitation and renovation of Luxor

    Cornish ,City Gates and roundabout

  • Rehabilitation and renovation of Luxor

    Cornish ,City Gates and roundabout

  • Rehabilitation and renovation of Luxor

    Cornish ,City Gates and roundabout

  • Aircraft Engines Factory

    Construction of inspection chamber nutrition , sewage

    network and roads

    Location: Cairo-Helwan

    Consultant: Benaa Consultant

    Dr. Alaa El Sayed

    Owner : Arab Organization

    for Industrialization

    Duration : One Year

    Contract Date : 2004

    Project Value 8 Million EGP

  • Water Tank in Sokhna

    Construction of TEDA city Under ground Water Tank with a

    capacity of 1500 m3

    Location: Sokhna

    Consultant: Building Consulting Group PhD. Alaa El Sayed

    Owner : Egypt Suez China Real Estate Development

    Duration: 18 Months

    Contract Date : 2009

    Project Value 6 Million EGP

  • Water Tank in Sokhna

  • Water Tank in Sokhna

  • Main Substation of Phosphate &

    compound fertilizers complex in Sokhna

    Civil and finishing works of the Main Substation. The

    substation consists of transformer room, Ring Main Unit,

    MDB, Generator and Switch gear

    Location : Sokhna

    Consultant: Enppi

    Owner : El Nasr For Intermediate

    Chemicals

    Duration : 3 Months

    Contract Date : 2016

    Project Value 4 Million EGP

  • Main Substation of Phosphate &

    compound fertilizers complex in Sokhna

  • Waste Water Treatment Plant in Wadi

    Hof

    Construction of 3000 m3/day Waste

    Water Treatment Plant

    Location: Wadi Hof

    Consultant: Arab Organization for

    Industrialization

    Owner : El Nasr Automotive

    Manufacturing

    Duration : One Year

    Contract Date : 2002

    Project Value 4 Million EGP

  • Waste Water Treatment Plant in El

    Mahla El Kobra

    Construction of 3600 m3/day

    Waste Water Treatment Plant

    Location: El Mahla El Kobra

    Consultant: Arab Organization

    for Industrialization

    Owner : Tanta for oil and soap

    Duration : One Year

    Contract Date : 1999

    Project Value 3 Million EGP

  • Project One Million EGP

    Waste Water Treatment Plant in

    Mansoura

    Construction of 3500 m3/day Waste Water

    Treatment Plant in Mansoura

    Location: Mansoura City

    Consultant: Arab Organization for Industrialization

    Owner : El Shourbagy Company

    Duration : 6 Months

    Contract Date : 2001

    Sea Water desalination Plant

    Construction of 3600 m3/day Sea Water

    Desalination Plant in Sokhna

    Location: Sokhna City

    Consultant: Moharam Bakhoum

    Owner : Egyptian Fertilizers

    Duration : 6 Months

    Contract Date : 2004

    V. Infrastructure Projects

    Project One Million EGP

  • Announcement

    We are proud to announce that we are singing

    new project with:

    Hyde Park residential project, the project’s value is

    EGP 150,000,000 in New Cairo