portfolio committee: water and environmental affairs
DESCRIPTION
Portfolio Committee: Water and Environmental Affairs. WULA PROGRESS REPORT 16 April 2013. Purpose of the Presentation. Outline the progress made on the eradication of the water use licence applications (WULAs) backlog as at 22 March 2013. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/1.jpg)
1
Portfolio Committee: Water and Environmental Affairs
WULA PROGRESS REPORT
16 APRIL 2013
![Page 2: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/2.jpg)
Purpose of the Presentation
– Outline the progress made on the eradication of the water use licence applications (WULAs) backlog as at 22 March 2013.
– To advise on the status and provide a detailed breakdown on the status of applications within the current backlog.
– Provide an overview and breakdown on new WULAs received during the 2011 calendar year.
– To advise on current steps taken to ensure that the backlog is eradicated.
2
![Page 3: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/3.jpg)
Lay out of the Presentation
1. Applications Processed/Finalised2. Backlog Applications in process
2.1. Outstanding Information of Backlog
3. 2011/12 Applications at Letsema4. 2011/12 Applications at Regional Offices5. High Court and Water Tribunal Cases6. Challenges and Interventions
3
![Page 4: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/4.jpg)
1. Applications Processed/Finalised
4
![Page 5: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/5.jpg)
Overview of finalised WULAs from April 2010 to 22 March 2013
5
Financial Year
2010 - 2011 2011-2012 2012 - 2013 Total
Letsema 2506 785 204 3495
Region 0 513 163 676
Total 2506 1298 367 4171
![Page 6: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/6.jpg)
Sectoral Breakdown of Letsema Finalized WULAs from April 2010 to 22 March 2013
Status of Application
Mining
Local Governmen
t and Developme
nt
Forestry Industry Agriculture TOTAL
Withdrawn by DWA 381 21 10 88 469 969
Withdrawn by Client 75 18 15 2 20 130
Licences Issued 216 261 1217 123 415 2220
Declines33 7 38 5 81 163
Total 705 307 1280 218 985 3495
Percentage%
18% 7% 40% 6% 29% 100%6
![Page 7: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/7.jpg)
RENEWABLE ENERGY
7
![Page 8: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/8.jpg)
Finalized WULAs April 2011- 22 March 2013
Status of Application Mining
and Waste
Local Government
and Development
Forestry Industry Agricult
ure TOTAL
Withdrawn by DWA 22 12 6 12 34 86
Withdrawn by the Applicant 23 17 15 2 16 73Licences Issued 166 170 106 66 203 711Declines 31 7 33 3 45 119Total Finalised 242 206 160 83 298 989
Awaiting Signature 5 8 28 5 11 57
8
![Page 9: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/9.jpg)
HDI status
9
Status of Application HDI BBBEE HAIW: BBBEE Compliant LG Total
Withdrawn by the DWA 3 4 21 57 1 86Withdrawn by the Client 3 11 8 42 9 73
Licences Issued 109 51 54 402 96 712
Declines 13 4 28 73 0 118
Total 128 70 111 574 106 989
% issued 13% 7% 11% 58% 11% 100%
![Page 10: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/10.jpg)
Other Water Uses Issued April 2011- 22 March 2013
Status of Application Mining
and Waste
Local Government
and Development
Forestry Industry Agricult
ure TOTAL
General Authorisations 2 3 0 3 0 8Dispensing with the Requirements 0 1 0 1 0 2
Total 2 4 0 4 0 10
10
![Page 11: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/11.jpg)
HDI status on Other Water Uses Issued
Status of Application HDI BBBEE HAI
W: BBBEE Compliant LG Total
General Authorisations 1 0 2 5 0 8Dispensing with the Requirements 0 0 0 2 0 2
Total 1 0 2 7 0 10
11
![Page 12: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/12.jpg)
Graph Representing Finalised WULAs April 2011- 22 March 2013
12
22 12 6 12 34
166 170106
66
203
317
33
3
45
0
50
100
150
200
250
300
350
Declines
Licences Issued
Withdrawn by the Applicant
Withdrawn by DWA
![Page 13: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/13.jpg)
Awaiting Signature: Per Location
13
![Page 14: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/14.jpg)
Awaiting Signature: Per sector
14
![Page 15: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/15.jpg)
Chasing a Moving Target
15
WULA STATUS 04-Apr 30-Apr 31-May 30-Jun 31-Jul 31-Aug 30-Sep 28-Oct 25-Nov 15-Dec 24-Feb 16-Mar 23-Mar 30-MarApplications finalised (excl 50) 0 114 198 255 355 443 479 558 604 662 737 742 763 785
Current backlog 731 731 758 831 879 810 778 729 728 679 520 522 492 470
*Files Put on hold and other 0 0 0 0 0 0 0 0 0 0 129 131 126 126
Cumulative backlog 731 845 956 1086 1234 1253 1257 1287 1332 1341 1386 1395 1381 1381
Progress IF backlog was static 731 617 533 476 376 288 252 173 127 69 0 0 0 0Actual monthly file increase 114 111 130 148 19 4 25 13 44 9 39 8 0 0
Additional files: cumulative 114 225 355 503 522 526 551 564 608 617 656 664 650 650
![Page 16: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/16.jpg)
Moving Target
16
![Page 17: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/17.jpg)
Application put on hold
17
SFRA APPLICATIONS PUT ON HOLD DUE TO PENDING EIA, Compulsory Licensing and Pending LAAC Recommendation & Reserve
Province
Pending EIA
Pending LAAC Recommendation & Comprehensive Reserve
Compulsory Licensing
Returned to the RO V&V ELU Grand Total
Eastern Cape 49 0 0 0 0 49Mpumalanga 0 4 0 1 5 10
Limpopo 0 0 0 2 1 3Gauteng 0 0 0 2 0 2
Western Cape 0 01
0 0 1KwaZulu
Natal 10 02
1 0 13North West 0 0 0 0 0 0Free State 0 0 0 0 1 1Northern
Cape 0 00
0 1 1Total 59 4 3 6 8 80
![Page 18: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/18.jpg)
2. Backlog Applications in process
18
![Page 19: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/19.jpg)
Current Backlog Per Region
19
REGIONS AGRICULTURE INDUSTRY SFRA
LOCAL GOV AND
DEVELOPMENT MINING TOTAL %
EC 1 0 37 6 0 44 16%
FS 1 0 0 5 0 6 2%
GP 2 3 0 27 8 40 15%
KZN 2 2 3 11 2 20 7%
LP 6 0 2 7 0 15 5%
MP 6 7 0 16 20 49 18%
NW 1 3 0 19 15 38 14%
NC 2 0 0 10 26 38 14%
WC 10 3 0 12 0 25 9%
TOTAL 31 18 42 113 71 275 100%
HDI 9 3 19 0 7 38
% HDI 29% 17% 45% 0% 10% 14%
![Page 20: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/20.jpg)
Current Backlog Per Sector
20
Status of Applications Mining
Local Gov & Dev Forestry Industry Agriculture TOTAL %
Initial Assessment 5 0 0 0 0 5 2%
Information Outstanding 54 97 7 13 20 191 69%
Finalising Assessment 7 8 7 0 0 22 8%
Ready for Del Auth’s Sign 5 8 28 5 11 57 21%
Total 71 113 42 18 31 275 100%% Backlog 26% 41% 15% 7% 11% 100% HDI 7 0 19 3 9 38% HDI 10% 0% 45% 17% 29% 14%
![Page 21: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/21.jpg)
Pie Chart of Backlog Applications
21
![Page 22: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/22.jpg)
Graph Representing Backlog WULAs in Progress
22
![Page 23: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/23.jpg)
Status breakdown of the mining sector backlog applications
23
![Page 24: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/24.jpg)
Breakdown of backlog applications per main commodity mined type
24
![Page 25: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/25.jpg)
Status breakdown of the agriculture backlog applications
25
REGION Initial Assessment
Information Outstanding
Finalising Assessment
Ready for Delegated Authority’s Signature
TOTAL
EASTERN CAPE 0 0 0 1 1FREE STATE 0 1 0 0 1GAUTENG 0 2 0 0 2KWAZULU NATAL 0 1 0 1 2LIMPOPO 0 5 0 1 6MPUMALANGA 0 3 0 3 6NORTH WEST 0 0 0 1 1NORTHERN CAPE 0 2 0 0 2WESTERN CAPE 0 6 0 4 10TOTAL 0 20 0 11 31HDI 0 6 0 3 9% of HDI 0% 30% 0% 27% 29%
![Page 26: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/26.jpg)
Types Backlog Application for agricultural operations
26
REGIONS IRRIGATION LIVESTOCK MULTIPURPOSE TOTAL
EASTERN CAPE
1 0 0 1FREE STATE 1 0 0 1GAUTENG 2 0 0 2KWAZULU NATAL
1 0 1 2LIMPOPO 6 0 0 6MPUMALANGA
6 0 0 6NORTH WEST 1 0 0 1NORTHERN CAPE
2 0 0 2WESTERN CAPE
10 0 0 10TOTAL 30 0 1 31
![Page 27: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/27.jpg)
Status breakdown of the Backlog Industry applications
27
REGION INITIAL ASSESSMENT
OUTSTANDING INFO
FINALISING ASSESSMENT
SUBMITTED FOR DELIGATED AUTHORITY
Total
Eastern Cape
0 0 0 0 0Free State 0 0 0 0 0Gauteng 0 3 0 0 3KwaZulu Natal
0 1 0 1 2Limpopo 0 0 0 0 0Mpumalanga 0 6 0 1 7North West 0 2 0 1 3Northern Cape
0 0 0 0 0Western Cape
0 1 0 2 3TOTAL 0 13 0 5 18HDI 2 0 0 1 3% of HDI 0 0 0 0 0
![Page 28: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/28.jpg)
Status of Backlog SFRA WULAs currently on site
28
REGION Initial Assessment
Information Outstanding
Finalising Assessment
Ready for Delegated Authority’s Signature
TOTAL
EASTERN CAPE 0 4 7 26 37FREE STATE 0 0 0 0 0GAUTENG 0 0 0 0 0KWAZULU NATAL
0 1 0 2 3LIMPOPO 0 2 0 0 2MPUMALANGA 0 0 0 0 0NORTH WEST 0 0 0 0 0NORTHERN CAPE
0 0 0 0 0WESTERN CAPE 0 0 0 0 0TOTAL 0 7 7 28 42HDI 0 5 6 8 19%HDI 0% 71% 86% 29% 45%
![Page 29: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/29.jpg)
Status of backlog local government and development WULAs
29
REGION Initial Assessment
Information Outstanding
Finalising Assessment
Ready for Delegated Authority’s Signature
TOTAL
EASTERN CAPE 0 6 0 0 6
FREE STATE 0 4 1 0 5
GAUTENG 0 26 1 0 27
KWAZULU NATAL 0 9 2 0 11
LIMPOPO 0 7 0 0 7
MPUMALANGA 0 12 1 3 16
NORTH WEST 0 14 2 3 19
NORTHERN CAPE 0 8 1 1 10
WESTERN CAPE 0 11 0 1 12
TOTAL 0 97 8 8 113
HDI 0 0 0 0 0
![Page 30: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/30.jpg)
Breakdown of activities for local government and development
30
REGION RESIDENTIAL DEVELOPMENT
ROAD CONSTRUCTION
WWTW DOMESTIC/ WTW
PIPE LINE CROSSINGS
TOTAL
Eastern Cape 0 0 1 5 0 6Free State
0 0 0 5 0 5Gauteng
10 0 15 2 0 27KwaZulu-Natal
5 0 5 1 0 11Limpopo
2 1 1 3 0 7Mpumalanga
9 0 6 1 0 16North West
10 3 6 0 0 19Northern Cape
2 1 5 2 0 10Western Cape
3 0 7 2 0 12TOTAL
51 9 46 21 0 113
![Page 31: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/31.jpg)
Strategic Important WULAs
31
![Page 32: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/32.jpg)
2.1. Outstanding Information of Backlog
32
![Page 33: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/33.jpg)
Outstanding Information
33
![Page 34: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/34.jpg)
Outstanding Reserve
34
All Inclusive Outstanding Reserve Determination(s)
SECTOR RoR Provided RoR Outstanding Total Outstanding Reserve
LOCAL GOVERNMENT 60 0 60
MINING 31 0 31
INDUSTRY 10 0 10
AGRICULTURE 19 0 19
SFRA 18 0 18
TOTALS 138 0 138
![Page 35: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/35.jpg)
4. 2011/12 Applications at Regional Offices
35
![Page 36: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/36.jpg)
Status of WULAs Finalised by the Region and Copies Provided to the Project
REGIONS GA ELU Schedule 1 Licences Total
EC 84 15 11 3 113
FS 0 0 0 0 0
GP 11 0 0 1 12
KZN 0 0 0 101 101
LP 0 0 0 16 16
MP 0 0 0 2 2
NW 0 0 0 0 0
NC 18 0 0 6 24
WC 18 0 0 0 18
TOTAL 131 15 11 129 259
36
![Page 37: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/37.jpg)
2011 WULAs being processed at regional offices
37
![Page 38: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/38.jpg)
2011 Provincial Split of WULAs in Regions
38
![Page 39: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/39.jpg)
2012 WULAs being processed at regional offices
39
![Page 40: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/40.jpg)
2012 Provincial Split of WULAs in Regions
40
REGIONS AGRICULTURE INDUSTRY SFRA LOCAL GOV AND
DEVELOPMENT
MINING SECTOR YET TO BE
CONFRIMED
TOTAL
EASTERN CAPE 9 1 0 14 0 0 24FREE STATE
11 4 0 4 9 0 28GAUTENG 3 2 0 3 0 0 8KWAZULU NATAL 2 1 9 5 0 0 17LIMPOPO 30 4 0 2 6 5 47MPUMALANGA
35 14 0 19 42 0 110NORTH WEST
2 7 0 15 7 13 44NORTHERN CAPE 7 3 0 2 9 0 21WESTERN CAPE 24 3 0 21 1 0 49TOTAL 123 39 9 85 74 18 348
![Page 41: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/41.jpg)
2013 WULAs being processed at regional offices
41
![Page 42: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/42.jpg)
2013 Provincial Split of WULAs in Regions
42
REGIONS AGRICULTURE INDUSTRY SFRA LOCAL GOV AND
DEVELOPMENT
MINING SECTOR YET TO BE
CONFRIMED
TOTAL
EASTERN CAPE 3 0 0 3 0 0 6FREE STATE 0 0 0 0 0 0 0GAUTENG 0 0 0 0 0 0 0KWAZULU NATAL 0 0 0 0 1 0 1LIMPOPO 0 0 0 0 0 0 0MPUMALANGA 0 1 0 0 1 0 2NORTH WEST 0 0 0 0 1 0 1NORTHERN CAPE 0 0 0 0 0 0 0WESTERN CAPE 5 3 0 8 0 0 16TOTAL 8 4 0 11 3 0 26
![Page 43: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/43.jpg)
High Court and Water Tribunal Application
43
![Page 44: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/44.jpg)
Breakdown of courts appeal
44
![Page 45: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/45.jpg)
PROGRESS ON RENEWABLE ENERGY (PREFERRED BIDDERS)
45
![Page 46: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/46.jpg)
Progress on Renewable Energy (Preferred Bidders)
46
![Page 47: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/47.jpg)
Graph for Renewable Energy (Preferred Bidders)
47
![Page 48: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/48.jpg)
HUMAN RESOURCE STAFF TURNOVER
48
![Page 49: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/49.jpg)
Movement of Staff from 1 April 2011 to date
49
Staff Summary Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13Assessor 52 52 51 53 53 55 50 52 50 52 53 49 51 47 42 45 41 40 40 37 33 32 32 31Admin 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 11 11 11 11 11 9 9 9Management 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2Total 68 68 67 69 69 71 66 68 65 67 68 64 66 62 57 60 55 54 53 50 46 43 43 42WULAS finalised 132 85 59 101 97 65 68 55 4 47 25 47 8 38 22 12 44 15 18 14 20 3 0 0
![Page 50: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/50.jpg)
Graph Movement of Staff from 1 April 2011 to date
50
![Page 51: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/51.jpg)
5. Challenges and Interventions
51
![Page 52: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/52.jpg)
1. WULA BACKLOG ERADICATION PROJECT STATUS AND ISSUES ARISING
No Challenge Implications of Challenges
Proposals A/DG Intervention
Disc. Doc.
a venue resolved
b Reserves not availed in time to finalise WULAs.
Over 52% (153) of remaining WULAs backlog cannot be finalised due to delays in output of reserves
-impediment in the eradication of the backlog
-Closing date of Jul 2012 will not be met if process output of reserves is not increased
-Service delivery will not be achieved due to delays in WULAs
-RDM prioritise reserve determinations
-Additional resources be availed to determine reserves
-Attach personnel to Letsema to determine reserves on site
-Request plan from RDM to address backlog on reserve determinations
-Monitoring of plan at same level as WULAs backlog
Reserves backlog list
52
![Page 53: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/53.jpg)
1. WULA BACKLOG ERADICATION PROJECT STATUS AND ISSUES ARISING
No Challenge Implications of Challenges
Proposals A/DG Intervention
Disc. Doc
c Lack of water availability for HDIs and some critical users in water stressed catchments
-Failure to adequately effect redress and equity
-Job losses in critical industries
-Failure to finalise HDI and critical user applications
-Delays in finalising WULAs
-DWA to accept reduction of assurance of supply
-Set aside water allocations for critical users in specific WMAs in the interim
- Facilitate DWA policy or guidelines to guide authorisation
Examples of WULAs dealt with
d Lack of adequate resources for HDIs to undertake studies
- Failure to adequately effect redress and equity
- DWA to offer financial assistance for water availability studies for HDIs
ditto
53
![Page 54: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/54.jpg)
1. WULA BACKLOG ERADICATION PROJECT STATUS AND ISSUES ARISING
No Challenge Implications of Challenges
Proposals A/DG Intervention
Disc. Doc
e Delegations need to be updated and streamlined, as in those with CD: Water Use as some are still with project manager Letsema, others with Regional Heads
-Delays in finalising WULAs
-Devolve delegations to Regions
- Fast track delegations process
Delegations document
f Additional WULAs being added to backlog
-Delays in finalising backlog which is increasing
-Unhappy clients-Unhappy principals
All Regions to be given deadline to submit backlog WULAs
- Sign off letter to Regions with cut off date for submission of WULAs
54
![Page 55: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/55.jpg)
1. WULA BACKLOG ERADICATION PROJECT STATUS AND ISSUES ARISING
No Challenge Implications of Challenges
Proposals A/DG Intervention
Discussion Document
g Status of SFRA water use licence applications under backlog eradication and challenges, these applications have since been put on HOLD pending submission of the outstanding information.
-delays in eradication of backlog
-May comprise cooperative governance structures like LAACs and previously signed MOUs
-Letter to parties like Forestry Charter Council, DAFF, applicants advising them of the delays-Remove WULAs from backlog-The se applications have been put on hold and the relevant applicants and stakeholders have been informed.
Put WULAs On hold waiting for BA/EIA studies and complete current licensing process
55
![Page 56: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/56.jpg)
2. WORK PLAN TO ERADICATE BACKLOG AND HUMAN RESOURCES REQUIRED
• A list of officials currently on Letsema is provided– The current available staff is insufficient to finalise
the backlog – A list of officials who have previously worked on the
project and have moved on for various reasons is provided
• Action Request that these officials be recalled to strengthen the team to finish the project.
56
![Page 57: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/57.jpg)
WORK PLAN – IMPACT OF HUMAN RESOURCES
• Human Resources– Availability of assessors to project is less than 50%, due to
• leaves, rotational attendance, travel time– Also high staff turnover due to promotions, transfers– Capacity also limited
• Complexity of WULAs• Delays in Technical Inputs from DWA sections• Reserves, e.g. the Comprehensive study for WULAs around St
Lucia has been outstanding for a long time• Some 138 WULAs await reserves to date
• Incomplete information in files
57
![Page 58: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/58.jpg)
WORK PLANNo Challenge Implications of
ChallengesProposals A/DG
InterventionDiscussion Document
a Lack of staff to process WULAs
-Delays in finalising project
-Increasing backlog exacerbates situation
-Recall of all personnel with Letsema experience as per attachment
-Approve work plan as summarised
-All staff seconded to project till completionLetter of staff recall
Attendance to backlog eradication compulsory for all regions
List of staff required
58
![Page 59: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/59.jpg)
3. HUMAN RESOURCE SUSTAINABILITY ISSUES ON WATER USE AUTHORISATION
No Challenge Implications of Challenges
Proposals A/DG Intervention Discussion Document
a Failure to retain Graduate Trainees and Contract Workers
-Fruitless expenditure for the DWA in that staff would have been trained and then released
-Reduces WULA processing as about 40 % of staff is in this category
-Put mechanism in place to retain the staff
-renew contracts of contract workers
-Facilitate absorption of graduate trainees
b OSD- some employees are classified as Environmental and Biodiversity Officers-Not translated to scientists as per their duties and qualifications
-Affects career growth and staff morale -Remuneration of employees is lower than expected
-Request that Phase 3 of OSD must be stopped to consider the grievances of affected employees
-Be aware of the grievance-Request HR to appoint independent body to review the placement of affected disciplines in OSD
Various submissions to HR
59
![Page 60: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/60.jpg)
HUMAN RESOURCE SUSTAINABILITY ISSUES ON WATER USE AUTHORISATION
No Challenge Implications of Challenges
Proposals A/DG Intervention
Discussion Document
a Request for Bonuses for Letsema Project Staff, those still in the project
-motivation and support for bonuses for staff for 2011/2012 period
b Request A/DG to officiate at presentation of prizes for star performers
-presence and officiating at function for motivation of staff
60
![Page 61: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/61.jpg)
Functions (2)
• Client liaison/ stakeholder relations– Provides timely response and feed back to
applicants on WULAs
• Data capturing / information system/ technology support
• Annual Reporting
• Verification of ELWU
61
![Page 62: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/62.jpg)
JAN 2012
FEB 2012
MAR 2012
APR 2012
MAY 2012
JUN 2012
JUL 2012
AUG 2012
SEPT 2012
OCT 2012
OVERALL
PROJECT
MINING
LOCAL GOV +
DEV
SFRA
IND
AGRIC
WORK PLAN BY SECTOR ON BACKLOG
EXAMPLE TEXT
66 WULAs
218 WULAs
20 WULAs
13 WULAs
105 WULAs
14 WULAS
62
![Page 63: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/63.jpg)
PROPOSED STRUCTURES
63
![Page 64: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/64.jpg)
THANK YOU
![Page 65: Portfolio Committee: Water and Environmental Affairs](https://reader035.vdocuments.site/reader035/viewer/2022062518/5681449e550346895db155bd/html5/thumbnails/65.jpg)
65