port evolution port facilities port statistics

42

Upload: others

Post on 12-Sep-2021

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Port evolution Port facilities Port statistics
Page 2: Port evolution Port facilities Port statistics

�Port evolution

�Port facilities

�Port statistics

�TESC expansion projects

�Interland nearby facilities

Page 3: Port evolution Port facilities Port statistics

Port Evolution

Page 4: Port evolution Port facilities Port statistics

20th Century Beggining

Page 5: Port evolution Port facilities Port statistics

20th Century Beggining

Page 6: Port evolution Port facilities Port statistics

20th Century Beggining

Page 7: Port evolution Port facilities Port statistics

The 70’s

Page 8: Port evolution Port facilities Port statistics

The 80’s – Vessels Type SD 14

Page 9: Port evolution Port facilities Port statistics

The 90’s

Page 10: Port evolution Port facilities Port statistics

2006

Page 11: Port evolution Port facilities Port statistics

2006

Page 12: Port evolution Port facilities Port statistics

Anchorage and Approach Channel

Page 13: Port evolution Port facilities Port statistics

Approach Channel

Page 14: Port evolution Port facilities Port statistics

Manoeuvring basin view

Page 15: Port evolution Port facilities Port statistics

Port Facilities

Public Port Instalation (bonded area)Pre stacking area: 90.000 m²Reefer plugs: 610Ctnr berths: 1 Exclusive 1 Preferred

TESC (bonded area)Pre stacking area: 31.000 m² (current)Pre stacking area: 31.000 m² (current)Pre stacking area: 66.000 m² (future)Warehouse: 4.000 m²Berths: 1 multipurposeBerths: 1 pref ctnr 1 multipurpose (future)

WRC Port Operator8 reach stackers full Ctnr2 MHC Gottwald 330

Page 16: Port evolution Port facilities Port statistics

Approach channel12 mts deep, 9,3 km extension and, at least 100 mts wide;

Manoeuvring basinspacious estuary of sheltered waters, with depths of up to 30 mts. Five anchorage areas are delimited;

Current Port Profile

Berths: 5, as follow101 (grains) – draft of 12 mts, length of 220 meters102/103 (containers) – draft of 11,4 mts, length of 380 mts201 (gen. cargo) – draft of 8 mts, length of 150 mts301 (gen. cargo/containers) – draft of 9,5 mts (average), length of 225 mts

Page 17: Port evolution Port facilities Port statistics

Investments

Page 18: Port evolution Port facilities Port statistics

Slabstones Overturn + Dredging to 13m depth

Port investments

Pontual interventions alongThe acess chanel

Cruz Slabstone

Page 19: Port evolution Port facilities Port statistics

Port investments

Page 20: Port evolution Port facilities Port statistics

Port investments

Page 21: Port evolution Port facilities Port statistics

2007

Page 22: Port evolution Port facilities Port statistics

2007

Page 23: Port evolution Port facilities Port statistics

2007

NOVANOVA

Page 24: Port evolution Port facilities Port statistics

2007

Page 25: Port evolution Port facilities Port statistics

2007

Page 26: Port evolution Port facilities Port statistics

2007

Page 27: Port evolution Port facilities Port statistics

Future port gate in/out– APSFS proposal

Wharehouse and Oil Tanks

Port Acess

New pre stacking areas

Page 28: Port evolution Port facilities Port statistics

Port Statistics

Page 29: Port evolution Port facilities Port statistics

Container Stats *

1.197.105116.85278.3191998

982.13896.90867.2391997

972.47496.98367.7721996

730.48178.45455.4851995

452.31950.14737.7621994

340.94738.33429.8171993

TonsTeu'sUnitsYear

(*) Source: port stats, shiftings excluded

2.800.859313.533191.0112007

2.520.675269.446165.1682006

2.550.105290.440178.1112005

2.695.648305.331186.1472004

2.494.067281.057172.5712003

2.359.483258.826160.1872002

1.547.694176.305112.3282001

1.648.906170.755112.0122000

1.443.675151.50496.4891999

Page 30: Port evolution Port facilities Port statistics

TESC Expansion Project

Page 31: Port evolution Port facilities Port statistics

TESC Expansion Project

Depth 10 m

Bridge 160 x 8 m

Berth 225 x 20 m

Pre Stacking Area

Page 32: Port evolution Port facilities Port statistics

TESC Expansion Project

269 m

223 m

Pre stacking expansion I

14m dredgingPier extention to 264 mBridge extention to 8x18mtPier enlargement to 52mTwo new berths to be builtPre stacking expansion II

Final Pier Extension : 264 x 52,5 mtFinal Bridge Extension : 160 x 18 mtFinal pre stacking area : 66.000 m2

Pedreira river rectification

240 m

Page 33: Port evolution Port facilities Port statistics

TESC Expansion Project

Depth 14 m

Berth 264 x 52,5 m

Bridge 160 x 8 m

Pre Stacking Area

Page 34: Port evolution Port facilities Port statistics

TESC Expansion Project

Depth 14 m

Bridge 160 x 8 mBridge 160 x 8 m

Pre Stacking Area

Page 35: Port evolution Port facilities Port statistics

TESC Expansion Project

Page 36: Port evolution Port facilities Port statistics

TESC Expansion Project

Page 37: Port evolution Port facilities Port statistics

TESC Expansion Project

Page 38: Port evolution Port facilities Port statistics

TESC Expansion Project

Page 39: Port evolution Port facilities Port statistics

Interland Nearby Facilities Interland Nearby Facilities CFS and DEPOTS

Page 40: Port evolution Port facilities Port statistics

Cargolink Facilities – Depot – Current Status

Page 41: Port evolution Port facilities Port statistics

Cargolink Facilities – Redex – Current Status

Page 42: Port evolution Port facilities Port statistics

Welcome toSão Francisco do Sul

Thank you!