port alberni transshipment hub: path - metro vancouver · 2014-08-20 · port alberni transhipment...
TRANSCRIPT
![Page 1: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/1.jpg)
“Canada S t a r t s He r e”
Port Alberni Transshipment Hub: PATH
1
![Page 2: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/2.jpg)
PAPA: Existing Facilities & Volumes
3 berths: 900m/11.5 to 13m draft
7.5 hectares
4 warehouses 4700 m2
4 marinas
Over 100 leases
Jurisdiction of 47 km-long Inlet
Volume
Ships 75 per annum
Lumber 80 mil BF
Logs 750,000 m3
Fishing 11,000 m/t
Cruise 1 call
2
![Page 3: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/3.jpg)
3
Port Alberni Transhipment Hub - PATH -
![Page 4: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/4.jpg)
Terminal efficiencies & capacity Growing international trend of ULCS Maximize Gateway investments Road congestion & bottlenecks Negative Environmental Impact Industrial Land Reserve Social License Costly Distribution Centers Real Estate Frustrated Industry Meet Future Capacity Requirement Cost of Living
Port Alberni Transhipment Hub: PATH
4
![Page 5: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/5.jpg)
Lower Mainland’s Benefits of PATH
• Environmental benefits
• Maximize Use of Port and Transportation Infrastructure
• Reduce Traffic Congestion
• Land Reserve – ALR – Industrial
• Warehouse Space
• Transportation Infrastructure
• Construction Cost
• Use of Marine Highway
• Non-Competitive
• Security
5
![Page 6: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/6.jpg)
PAPA - Milestones
LNG Industrial Suitability study
Bulk Option 2
TRANSHIPMENT Feasibility Study
15 NM to Pacific Ocean
6
• 750 Hectares of Land Reserve• On-going Studies for LNG and Transhipment• Agreement with First Nations• Social Licence: Yes• Environmental Issues: Minor-Nil
![Page 7: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/7.jpg)
China’s Feeder Barge
World does it. Why can’t we?7
![Page 8: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/8.jpg)
Questions & Answers8
![Page 9: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/9.jpg)
portmetrovancouver.com
October 9, 2013
Peter Xotta
Vice-President,
Planning and Operations
PORT METRO VANCOUVER:TRUCKING UPDATE
![Page 10: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/10.jpg)
portmetrovancouver.com
PORT METRO VANCOUVER
• Canada’s largest gateway to the Asia-Pacific region
• 4th largest tonnage port in North America
• Connects Canadians with trading partners in 160 economies
• Approx. $475 million of cargo moved daily
![Page 11: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/11.jpg)
portmetrovancouver.com
• Non-shareholder, financially self-sufficient corporation
• Canada Marine Act obligations
• National Transportation Policy
• Governed by a diverse board of 11 directors
• Guided by a vision for long-term growth and competitiveness, benefiting communities locally and across the nation.
GOVERNANCE
![Page 12: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/12.jpg)
portmetrovancouver.com
• 28 major marine cargo terminals
• 3,081 vessel calls in 2012
• Serviced by 3 major railways
• Administration of 16,000 hectares of water and nearly 1,000 hectares of land and assets
OPERATIONS & ASSETS
![Page 13: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/13.jpg)
portmetrovancouver.com
• 124 million tonnes of cargo, 1% increase
• 96.8 million tonnes foreign tonnage
• 27.1 million tonnes domestic tonnage
• Throughput volumes reflect growth in Asian economies, continuing strength of Canada
2012 STATS | CONTINUING GROWTH
![Page 14: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/14.jpg)
portmetrovancouver.com
STRATEGIC INFRASTRUCTURE DEVELOPMENT
![Page 15: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/15.jpg)
portmetrovancouver.com
BUILDING THE PROVINCE, CREATING CAPACITY
• Trade Areas
• North Shore
• South Shore
• Roberts Bank Rail Corridor
• Container Capacity Improvement Program
• Deltaport Terminal, Road & Rail Project
• Roberts Bank Terminal 2
• Tenant-led projects
• Regional investments
• Port Mann Hwy 1
• SFPR
![Page 16: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/16.jpg)
portmetrovancouver.com
SOUTH SHORE CORRIDOR PROJECTSTEWART STREET ELEVATED ROAD - CURRENT
![Page 17: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/17.jpg)
portmetrovancouver.com
ROBERTS BANK RAIL CORRIDOR – STATUS
9
PMV is Lead Agency
![Page 18: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/18.jpg)
portmetrovancouver.com
MINIMIZING IMPACTS AND INCREASING EFFICIENCY
![Page 19: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/19.jpg)
portmetrovancouver.com
• Global supply chain
• Local Gateway
• Smart Fleet Strategy
CHALLENGES AND OPPORTUNITIES
![Page 20: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/20.jpg)
portmetrovancouver.com
SMART FLEET TRUCKING STRATEGY
•3-year plan to achieve excellence in container trucking sector
•Most significant outreach in a decade
•Collaboration between industry and government
•Accurate performance measurement and monitoring
![Page 21: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/21.jpg)
portmetrovancouver.com
• Collaboration:
• Container Drayage Leadership Team
• Accountability
• GPS Program
• Measuring And Monitoring
• Performance Reporting Framework
• Long Term Sustainability
• Truck Licensing System Review
• Clean Transportation Initiative
• Environmental Programs
SMART FLEET – KEY INITIATIVES
![Page 22: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/22.jpg)
portmetrovancouver.com
TOTAL CONTAINER TRUCK GATE TRANSACTIONS
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13
Ga
te T
ra
nsa
cti
on
s p
er M
on
th
TSI-Deltaport TSI-Vanterm DPW-Centerm Fraser Surrey
![Page 23: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/23.jpg)
portmetrovancouver.com
http://www1.portmetrovancouver.com/COGS_Chart/GPSTruck/pmvindex
15
![Page 24: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/24.jpg)
portmetrovancouver.com
• Improved safety
• Service consistency
• Sustainable growth
• Increased productivity and profitability
• Reduced congestion in communities
BENEFITS
![Page 25: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/25.jpg)
portmetrovancouver.com
Complete critical infrastructure upgrades
Expanding tools for collaboration
• Expand GPS coverage
• Drayage Financial & Operational Model
• Technology Pilot
• Truck License System Standards
SUMMARY – NEXT STEPS
![Page 26: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/26.jpg)
0 A better place to live based on transportation excellence
TransLink: Planning for the Future
October 9, 2013
![Page 27: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/27.jpg)
1 A better place to live based on transportation excellence
Planning for the Future
Looking to the future, while managing today’s needs…
Pattullo Bridge Strategic Review
2014 Base Plan
Strategic Priorities Fund
RTS Fall Engagement
![Page 28: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/28.jpg)
Pattullo Bridge Strategic Review
![Page 29: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/29.jpg)
3 A better place to live based on transportation excellence
Pattullo Bridge Strategic Review
Partners working together to: Review and evaluate alternatives to rehabilitate the Pattullo Bridge
Determine a preferred alternative that meets the needs of communities connected by the bridge, as well as the broader region served by the bridge
Current collaborative joint review was initiated in late 2012 by New Westminster, Surrey, TransLink, Ministry of Transportation and Infrastructure, Metro Vancouver, and Coquitlam
The 2014 Base Plan includes a budget of up to $299 million for potential Pattullo Bridge rehabilitation
![Page 30: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/30.jpg)
4 A better place to live based on transportation excellence
Pattullo Bridge Strategic Review
Consultation Activities (June 2013)
New Westminster, Surrey and TransLink consulted local residents and businesses, local and regional stakeholders, and bridge users regarding: - Problem Statement for the Pattullo Bridge Review - Objectives for rehabilitating or replacing the bridge - Initial screening of the long list of alternatives for rehabilitating or replacing the
bridge (screening against the objectives)
4,000 participant interactions during the consultation period:- Open houses and consultation events- Feedback forms- City of Surrey’s City Speaks - Online public opinion poll
![Page 31: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/31.jpg)
5 A better place to live based on transportation excellence
Pattullo Bridge Strategic Review
Consultation Results 6 of 25 alternatives recommended for further consideration:
1. New 4-lane Surrey-Coquitlam bridge with 2- or 3-lane rehabilitated PattulloBridge (Alternative 19)
2. New 6-lane bridge at existing location (Alternative 8)
3. New 4-lane bridge at existing location (Alternative 6)
4. Rehabilitated Pattullo Bridge – 4 lanes (Alternative 5)
5. Rehabilitated Pattullo Bridge – 3 lanes (Alternative 4)
6. New 5-lane bridge at existing location (Alternative 7)
![Page 32: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/32.jpg)
6 A better place to live based on transportation excellence
Pattullo Bridge Strategic Review
Next Steps Develop good connection options for each alternative
Conduct more detailed analysis and costing
Evaluate the alternatives with the aim of reducing the list of alternatives to those that are most consistent with the problem statement and objectives
Oct Nov Dec Jan Feb Mar
Phase 2 Consultation Prep
late NovConsultation
Meetings Start
Mid- MarchReport to Councils
and Board
Late JanPhase 3
Consultation Start
Late Oct/Early NovCouncil Review
Phase 2 materials
Phase 2 Consultation Phase 3 Technical & Consultation Prep
Phase 3 Consultation
Mid-JanCouncil Review Ph 3
materials
Jan 14
Report Out of Phase 2 to Councils
Dec 20
Public Cons. Ends
![Page 33: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/33.jpg)
2014 Base Plan
![Page 34: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/34.jpg)
8 A better place to live based on transportation excellence
2014 Base Plan Highlights
Being Fiscally ResponsiblePositive news on the financial front:
We are starting 2014 in a more favourable financial position
We are meeting our cumulative reserve requirements
We are managing through the projected 2015 gap
Reasons for this include:
Cost containment and increased efficiencies in 2013
Timing of our borrowing program
![Page 35: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/35.jpg)
9 A better place to live based on transportation excellence
2014 Base Plan Highlights
Revenue & Expenditures Revenue rates are not changing Transit fare increase deferred until 2015 Expenditures continue to be higher than revenue
![Page 36: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/36.jpg)
10 A better place to live based on transportation excellence
Delivering on our Commitments
2014 Base Plan Highlights
Evergreen Line contribution
Upgrade seven SkyTrain stations
Transit service hours held constant
Pattullo Bridge potential rehabilitation
Regional cycling program
MRN programs funding
![Page 37: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/37.jpg)
Strategic Priorities Fund
![Page 38: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/38.jpg)
12 A better place to live based on transportation excellence
Strategic Priorities Fund Application
SPF Overview
The Strategic Priorities Fund (SPF) is Metro Vancouver’s portion of the Federal Gas Tax Fund, initiated in the 2005/06 fiscal year that provides long-term, predictable funding for TransLink
The SPF must be used for environmental improvements
100% of Metro Vancouver’s SPF is dedicated to transit investment
Transit investments are restricted to capital and technology that support environmental sustainability
TransLink consults with Metro Vancouver on proposed projects before they are formally submitted to Union of BC Municipalities’ (UBCM) Gas Tax Fund Management Committee
![Page 39: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/39.jpg)
13 A better place to live based on transportation excellence
Strategic Priorities Fund Application
Progress to Date TransLink has received $676 million in committed funding from the SPF
to date
$349 million has been transferred from the committed Gas Tax restricted account toward approved Gas Tax projects.
The total cost of all the approved projects is approximately $1 billion
Approved projects include:- Replace older diesel buses with more fuel-efficient vehicles- Replace SeaBuses- Acquire new buses, HandyDART vehicles and SkyTrain vehicles- Refurbish Mark 1 SkyTrain vehicles- Upgrade Infrastructure
![Page 40: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/40.jpg)
14 A better place to live based on transportation excellence
Strategic Priorities Fund Application
Example: Hamilton Transit Centre Spending Timeline
0%
20%
40%
60%
80%
100%
120%
2010 2011 2012 2013 2014 2015
Cumulative Spending
$76 millionreceived
Project approved
$0 remains
Project completion
![Page 41: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/41.jpg)
15 A better place to live based on transportation excellence
Strategic Priorities Fund Application
Year 9 Proposed Projects
For Year 9 (2013/2014), TransLink is applying for $122.6 million of SPF funding, which is almost 80% of the total cost of the proposed projects
Proposed projects include:
- Replace 132 diesel buses with Hybrid and CNG buses
- Replace 3 trolley overhead rectifiers at Metrotown
- Replace automated SkyTrain control equipment
- Buyout 28 West Coast Express vehicles
![Page 42: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/42.jpg)
16 A better place to live based on transportation excellence
Strategic Priorities Fund Application
Outcomes
The SPF has delivered customer, environmental and fleet benefits, including:
Increased fleet accessibility
Increased fleet reliability and reduced maintenance costs
Cleaner, quieter vehicles
Increased customer capacity
Funding certainty is required to maintain current service and infrastructure
![Page 43: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/43.jpg)
RTS Fall Engagement
![Page 44: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/44.jpg)
18 A better place to live based on transportation excellence
RTS Fall Engagement
RTS OverviewRegional Transportation Strategy in two components:
1. Strategic Framework (approved July 2013)- Key directions for moving people & goods; meeting growth management,
economic, environmental, and social objectives- Outlines key strategies & actions under 3 levers: Invest, Manage, Partner- Indicates priority transportation investments for 30-year horizon
2. Implementation Plan- Identifies initiatives, timing and funding over next 15 years- Will clarify roles and responsibilities - Consultation will include two phases:
- Challenges & Choices (Nov-Dec 2013)- Draft Implementation Plan (2014)
![Page 45: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/45.jpg)
19 A better place to live based on transportation excellence
RTS Fall Engagement
Consultation Fall 2013 - Questions Objective:
- Facilitate dialogue on investment priorities and funding for the region
Questions:- What are your investment choices/priorities? - What is your support for other policy measures?- What is an acceptable funding level? How to pay?
![Page 46: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/46.jpg)
20 A better place to live based on transportation excellence
RTS Fall Engagement
Consultation Fall 2013 - Process Broad Engagement
- 4-6 sub-regional public workshops- Stakeholder engagement- Decision makers: elected officials workshops; Metro and Mayors’ Council
Interactive tool:- Basis for online and in-person engagements- Users select preferences from menu of investments
(rapid transit, bus transit, roads/bridges, walk/bike)- See the impact (economy, environment, health etc.) and how much they cost- Select preferred funding sources and ‘balance the budget’
Feedback on ‘how far, how fast’ on investment to shape the Plan.
![Page 47: Port Alberni Transshipment Hub: PATH - Metro Vancouver · 2014-08-20 · Port Alberni Transhipment Hub: PATH 4. Lower Mainland’s Benefits of PATH ... late Nov Consultation Meetings](https://reader033.vdocuments.site/reader033/viewer/2022042416/5f31481fd90a41238223e525/html5/thumbnails/47.jpg)
21 A better place to live based on transportation excellence
Questions or Comments?