PonTex Bridge Inspection Management System Transportation Short Course October 12, 2011

Upload: others

Post on 09-Mar-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Bridge Inspection

Management System

Transportation Short Course October 12, 2011

Page 2: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

What is PonTex?

►System to manage bridge safety inspections ►Developed in-house ►Relational database ►Web-based ►Role-based ►Will replace (but not yet retire) BRINSAP

Page 3: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Why PonTex? …or… What’s Wrong with BRINSAP

►Legacy brige inspection data (BRINSAP) resides on the mainframe.

►BRINSAP is in flat file format – not a relational database.

►BRINSAP data is not “live” – updated weekly (or whenever batched mainframe transactions are run).

Page 4: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Why PonTex?

►BRINSAP won’t accommodate elemental inspection data.

►BRINSAP error checking is on back end. ►BRINSAP has limited audit capability. ► BRINSAP will not willingly integrate into a

Bridge Management Information System.

Page 5: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Attributes

►Security – PonTex security is "role-based." A user can only perform those activities allowed by the role.

►Data Quality – PonTex validates data before it can be submitted for approval.

►Activation Requirements – A set of required fields must be validated before a new bridge can be added to inventory.

Page 6: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Attributes

►Elements – PonTex stores elemental data. ►History – All inspections are stored in PonTex

(not just most current). ►Audit – All changes to bridge, roadway and

inspection data are logged (who, what, when). ►Digital Attachments - Capability to store images,

etc. associated with inspection event.

Page 7: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Access

►Each individual user must have an account.

►Citrix connection through internet: https://txdotsg.dot.state.tx.us

Page 8: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

The Dreaded Citrix Gateway (more on this later)

Page 9: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 10: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 11: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 12: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 13: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Tabs

Page 14: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 15: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 16: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 17: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 18: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 19: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 20: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 21: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 22: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 23: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Overview: Inspection Life Cycle

Page 24: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Assignment

Inspection

Review

Page 25: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Assignments

Page 26: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Assignment

Page 27: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Assignments

►The "Assignment" tab is used to assign bridges to Bridge Division Inspectors, Primary Contractors, Subcontractors, and Team Leaders.

►Bridges are selected from the assignment tab,

which can be filtered by County, Control, Section, System, etc.

►Company, contract information, team leaders, and

subcontractors must first be created through the Company Tab, Contract Tab, and Users Tab.

Page 28: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Assignments

►A bridge is assigned to a Prime Contractor through a "Contract" and "Work Authorization.“

►A District Bridge Inspection Office user can assign bridges to Prime Contractors.

►Prime Contractors can assign bridges to their own Team Leaders or to a Subcontractor.

Page 29: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Assignment to Team Leader

Page 30: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Inspection

Page 31: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Inspection

Page 32: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Inspection

►Team Leader retrieves assigned bridges. ►Span by span elements and components are

created for on-system and Harris County bridges

►Team Leader conducts inspection, recording NBI data for all bridges and Elemental data.

►Team Leader submits inspection to Prime.

Page 33: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

NBI Inspection Items

Page 34: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 35: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 36: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 37: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 38: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,
Page 39: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Review

Page 40: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Review

►Team Leader submits inspection to Prime. ►Prime accepts, rejects, or amends. ►Prime submits inspection to District Bridge

Inspection Office. ►District accepts, rejects, or amends. ►Similar process when subs are involved.

Page 41: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Review

Page 42: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Review

Page 43: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Reject Inspection

Page 44: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

"Prime Contractor" Amend Inspection

Page 45: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Implementation

►February 2008: Initial release (for testing only): Austin District Fort Worth District San Antonio District Dallas District

Page 46: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex Implementation

► February 2009:

Odessa District and Rio Engineering

►All districts

moved to PonTex by July, 2011.

Page 47: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Initial Assessment…… PonTex – Friend or Foe?

► PonTex is plagued by Citrix connection problems. ►Down time is at an unacceptable level. ► Inspection costs are up. ►Work authorizations are taking longer to complete. ► Inability to input and submit inspection data is

affecting apparent compliance.

Page 48: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex – Friend or Foe?

Citrix Issues ►Unreliable servers ►Load balancing problems (assigned servers) ►TxDOT is running the “latest unsupported

version of CITRIX.”

Page 49: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

PonTex – Friend or Foe?

► Inspection costs have risen significantly from 2009 to 2011: On-system additions +35% Off-system additions +21%

► Increase in the number of extension requests for Work Authorizations.

► Increase in apparent number of bridges exceeding designated inspection frequency.

►Connection issues have slowed development of PonTex enhancements.

Page 50: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Friend or Foe?

►Connection issues have been elevated. ►TSD is working with TFT to resolve Citrix

issues. ►Considering a stand-alone work station

version of PonTex that doesn’t require an active Citrix connection to input data.

Page 51: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Further Down the Road

► Implement version 5.2 of PONTIS (release date is unknown at this time).

► PonTex will feed PONTIS. ►Will use PonTex elemental inspection data to build

initial deterioration models. ► Inspection data, deterioration models, and cost

data will need to be integrated within PONTIS for bridge condition forecasting for various funding and action scenarios – maintenance, rehabilitation, replacements.

Page 52: PonTex Bridge Inspection Management System · 2017. 1. 4. · Bridge Management Information System. ... bridge condition forecasting for various funding and action scenarios – maintenance,

Questions… Tom Yarbrough, P.E.