POI to MIS Transition PR0066_01. Project Details. Purpose: Decommission the POI (Planning and Operation Information) site and move all identified documents to the MIS (Market Information System) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: POI to MIS Transition PR0066_01

POI to MIS TransitionPR0066_01

Page 2: POI to MIS Transition PR0066_01

2

Project Details

Purpose: Decommission the POI (Planning and Operation Information) site and move all identified documents to the MIS (Market Information System)

Justification: Supports single source of access for Market Data Transparency. Provides secure authenticated access to information via Digital Certificates.

Implementation Date: October 16, 2014 (Off cycle Release 5.5)

MIS: https://mis.ercot.com/pps/tibco/mis

Related Initiatives: PGRR036, NPRR622

08/19/2014

Page 3: POI to MIS Transition PR0066_01

3

POI Access Information

10/16/2014: All identified POI items will be accessible on the MIS. All POI information will post to the MIS going forward.

10/16/2014 - 11/1/2014: POI site will be available but information may not be current.

11/1/2014 – 11/14/2014: The POI site will redirect all users to the MIS site.

11/15/2014 Forward: The POI site will no longer be accessible.

08/19/2014

Page 4: POI to MIS Transition PR0066_01

4

MIS Information

A digital certificate is required to access the MIS

Users may obtain a digital certificate or update roles by contacting their USA (User Security Administrator). Please contact ERCOT Client Services if you do not know how to contact your USA.

All MIS information is defined as Public, Secure or Certified. The POI content will fall into the Public, Secure, Certified data classifications.

All digital certificates provide access to Public and Secure data sets. All certified data sets are accessible with the EntityType_Extracts role.

08/19/2014

Page 5: POI to MIS Transition PR0066_01

5

Finding Data and Information

A POI mapping document has been created and posted to ERCOT.com: http://www.ercot.com/services/mdt/index.html

The mapping document provides a list of all current POI products with information on whether the product transitions to the MIS, is deleted or archived, the new name of the MIS product and the posting information. Note: This list will not be maintained

EMIL

A list of all required external products and their corresponding attributes are found in the ERCOT Market Information List (EMIL). As of 09/29/2014, the updated R5 EMIL posting will include all transitioned POI products. This is the official reference document for all external products and is updated with every scheduled release. http://www.ercot.com/services/mdt/userguides/index.html

08/19/2014

Page 6: POI to MIS Transition PR0066_01

6

Additional Information

External Web Services (EWS):

All POI documents will have an associated Report Type ID listed in the EMIL. This ID is used to programmatically download information using the External Web Service (EWS) GetReport.

EWS XSD Information and EIP Specifications on creating and using EWS and GetReport is available at: http://www.ercot.com/services/mdt/xsds/index.html

MIS Extract and Report Index:

A new Planning Information Index page is being created and added to the Extract and Report Index area for ease of use.

08/19/2014

Page 7: POI to MIS Transition PR0066_01

7

Groups and Roles

A new area for Groups is being created on the MIS. The current defined MIS Groups are PDCWG and TO.

PDCWG access is user specific and is granted through a signed NDA with ERCOT legal.

TO access is entity specific and based on registration parameters.

The new digital certificate roles associated to these groups are:

ICE_M_VIEW_PDCWG and ICE_M_VIEW_TO.

08/19/2014

Page 8: POI to MIS Transition PR0066_01

8

Wireframes

The next set of slides is a mock up of what the MIS will look like with the planning information pages, portlets and links.

08/19/2014

Page 9: POI to MIS Transition PR0066_01

9

GRID (Default)

08/19/2014

Page 10: POI to MIS Transition PR0066_01

10

GRID (Default Menu)

08/19/2014

Page 11: POI to MIS Transition PR0066_01

11

GRID (Generation)

08/19/2014

Page 12: POI to MIS Transition PR0066_01

12

GRID (Long-Term Planning)

08/19/2014

Page 13: POI to MIS Transition PR0066_01

13

GRID (Model)

08/19/2014

Page 14: POI to MIS Transition PR0066_01

14

GRID (Regional Planning)

08/19/2014

Page 15: POI to MIS Transition PR0066_01

15

GRID (Regional Planning - Hidden)

08/19/2014

Page 16: POI to MIS Transition PR0066_01

16

GRID (Resource Integration)

08/19/2014

Page 17: POI to MIS Transition PR0066_01

17

GROUPS (Default)

08/19/2014

Page 18: POI to MIS Transition PR0066_01

18

GRID (Default Menu)

08/19/2014

Page 19: POI to MIS Transition PR0066_01

19

GROUPS (PDCWG)

08/19/2014

Page 20: POI to MIS Transition PR0066_01

20

GROUPS (Transmission Owners)

08/19/2014