  • 7/27/2019 PMS West Java

    1/2

    http://www.onepetro.org/mslib

    Publisher Pipeline Simulation Inter

    Document ID 9810

    Content Type Conference Paper

    Title Application of On-

    Authors Galen Stanley, Velton Va

    Source PSIG Annual Meeting, O

    Copyright 1998. Pipeline Simulatio

    Annual Meeting, October 28 - 30, 1998 , D

    C opyr igh t 199 8. Pi peli ne Si mul

    Preview

    A B S T R A C T

    A simulatio n model i

    line model continuall

    information generate

    Inventory Manage

    Analysis. The simu

    operation in either

    alarms are presente

    from the simulation

    system. The paper c

    multiple components

    West Java Gas Tr a

    The West Java gas

    network, transports

    cement plants, steel

    composed of 9 sour

    natural gas. The pip

    (50 kg/cm2) is comp

    inches, with most of

    buried 3 to 5 ft (1 to

    gas turbine engines.

    Wet gas is mixed wit

    available at source a

    S y s t e m A r c h i t e c t u

    Data from the individ

    This data is present

    for the operator to s

    quarter of a second.

    and Alarm systems

    through the regular

    Management Syste

    or host SCADA com

    be sent back to the

    File Size 792 KB

    Add to Cart

    Checkout

    PRICE

    US $ 15.00

    Change Currency

    /servlet/onepetropreview?id=PSIG-9810

    st Group Language E

    ine Simulation For a Two-Phase Wet Gas Pipeline In I

    nderford, GSE Systems Inc.

    ctober 28 - 30, 1998 , Denver, Colorado

    Interest Group

    nver, Colorado

    lation Interest Group

    being developed to track the operation of a two-phase wet gas pipeli

    y receives SCADA updates assuring accurate conformance to the act

    d by the model supports the Pipeline Management System (PMS) a

    ent, Line Pack, Over/Under Pressure Analysis, Instrument Analy

    lation model is capable of simulating gas pipelines, liquid pipelin

    single or two-phase. The simulation model is run in conjunction with

    d to the operator through the SCADA alarm management system. All

    odel are also presented to the pipeline operators through the SCAD

    oncludes with a discussion of the dynamic testing of transients in the t

    are present.

    n s m i s s i o n P i p e l i n e O v e rv i e w

    transmission pipeline was put into operation in 1977. The 280 mil

    atural gas through cities and suburbs while serving heavy industrial c

    plants, power plants and other industries in West Java. The onshore

    es/inputs, 5 compressor stations and 18 consumers/outputs receiving

    line, delivering gas in an east to west direction, having a maximum d

    osed of X52 and X42 grade pipe segments. The diameter of these se

    the mainline piping at 24 inches. The pipeline is externally coated, cat

    1.5 meters) underground. 2 Compressor stations are composed of ce

    High pressure and low-pressure sources supply gas from both onsho

    h dry gas after the scrubbing and dehydrating processes. Gas compo

    nd consumer locations via chromatography readings.

    e

    ual RTU's will be polled and gathered by the communications server

    d to the simulation model at the same time it is presented to the Grap

    e. The simulation model processes the data and performs its applicat

    Upon completion of the application calculations, the model submits th

    llowing the operator to interact with the simulation model and respon

    perator console and environment. The operators will never interact p

    (PMS) computer that houses both the model and the PMS applicatio

    munications server will be submitted to the PMS computer. Output fro

    ost computer.

    Number of Pages 12

    glish

    ndonesia.

    ine in Indonesia. The on-

    ual pipeline. The

    pplications, which include

    sis, and Look-A-Head

    es, as well as transient

    the SCADA system. All

    ata, trends, and profiles

    graphics management

    wo-phase model when

    le (740 km) pipeline

    ustomers; fertilizer plants,

    ipeline network is

    up to 400 MMSCFD of

    sign pressure of 720 psi

    ments varies from 8 to 32

    hodically protected and

    trifugal units driven by

    re and offshore gas fields.

    nent information is

    f the SCADA system.

    hics and Alarm systems

    ion calculations every

    e results to the Graphics

    to alarms exclusively

    ysically with the Pipeline

    ns. Data from the master

    m the PMS computer will

    0 items

  • 7/27/2019 PMS West Java

    2/2

    DOWNLOAD HISTORY

    Past 30 days - 7 timesSince 2007 - 35 times

    ABOUT ONEPETRO

    What is OnePetro

    Top Downloads

    Document Coverage

    Participating Organizations

    Subscription Options

    Login Help

    Administrator Access

    LATEST NEWS

    Have you visited PetroWiki?

    IMPORTANT NOTE

    Download accelerators and bots of any kind are prohibited on this website. Offenders may have their access blocked.

    117.102.106.69