Goal Year 1 Year 2 Year 3 Year 4 Year 5
10 2 2 2 3 3
10 0 1 1 1 1
10 2 3 3 3 4
10 1 0 1 1 9
10 4 5 5 2 1010 3 4 4 3 5
10 6 6 5 6 5
10 6 8 8 8 7
5 0 1 3 1 1
5 1 1 1 0 5
5 1 0 1 2 5
5 2 2 3 3 3
100 28 33 37 33 58
100
90
80
70
60 Managed - Management can use metrics to control the defined processes; they can identify and adapt processes to particular projects to redu
50 Defined - Processes are defined, documented and established, although improvements are on-going. Will help drive consistency of process p
40 Repeatable - Some processes are repetable and may be consistent. However, discipline and rigor remain challenging
30
20 Chaotic - undocumented processes. Changes are dynamic and driven in an ad hoc, uncontrolled, reactive manner
10
0
Conducts audits of majority of projects/Value Realizatio
Increase in percentage of projects completed on time
Increase in percentage of projects completed on budge
Increase in projects aligned to corporate strategy
Identifies & utilizes project management best practices
Utilizes tools for planning & demand/resource analysis
Provides training and mentoring
Conducts portfolio analysis and management
Total
PMO Maturity Assessment
Implemented and accepted project methodology
Utilizes experienced and qualified Project Managers
Regularly tracks and reports on project activity
Maturity Level
Optimizing - Adressing common causes of variations by continually improving process performance incrementally
PMO has high visibility and support of senior executive
Year 1 Year 2 Year 3 Year 4
-
7/28/2019 PMO Maturity Assessment
2/3
-
7/28/2019 PMO Maturity Assessment
3/3
User Guide
PMO Assessment Template
Objective:
Description:.
maturity level is referenced against the 5 Capability Maturity Model Integration(CMMI) levels:
Chaotic, Repeatable, Defined, Managed and Optimizing. The CMMI levels are used as a convenient
The assessment is not intended to be a comparative analysis against industry standards.
The template displays 12 Maturity Levels. Users may modify or rearrange the Maturity Levels to
match their organizations executive or strategic guidelines for measuring their PMO.
.
is less important in assessing the PMO. Users have the flexibility to assign the rating goal (Goal
,
Assessments can also be done to reflect projected or future maturity. In this case, Year 1 would
represent the current year, and years 2 thru 5 would represent projected maturity levels.
Requirements:Excel 2007 or higher
Recommended users:
PMO Managers/Executives C-Level Executives Anyone interested in assessing the maturity of their PMO