plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

6
Profile & Career Objective : Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks) Good Experience in electrical cables Installations L.V (Infrastructure). Specialties : Support & promote OSP & Rollout management application. Electrical Cables Installation (Buried, unburied cables). Construction supervision experience in low voltage distribution Networks. Design of light Current Systems (Data System, CCTV, Fire alarm systems, Access Door System). Professional Experience: Design & Supervision of low current systems (structure cable, fire alarm, CCTV& Access control ) o Sub contractor: El Shehab for electrical and Contracting Company. Name : Ali Omar Ali El-atabany Date of Birth : 1/9/1982 Gander : Male Military Service : Exempted Marital Status : Married Nationality : Egyptian Driving License : Valid Address : Al-Riyadh Phone/Mobile No . : + 966 56 232 7862 + 966 54 312 5069 Personal Email : [email protected] [email protected]

Upload: ali-omar

Post on 18-Jul-2015

49 views

Category:

Engineering


4 download

TRANSCRIPT

Page 1: Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

Profile & Career Objective :

• Providing OSP technical knowledge and presentations, gathering customer requirements and translating them into a comprehensive solution. Works closely with sales managers, build customer relationship and prospects as a subject-matter expert to demonstrate how a proposed solution meets and exceeds customer requirements

• Design and Supervision of low voltage Distribution Networks and Telephone System (External and Internal Networks)

• Good Experience in electrical cables Installations L.V (Infrastructure).

Specialties : • Support & promote• OSP & Rollout management application.• Electrical Cables Installation (Buried, unburied cables).• Construction supervision experience in low voltage distribution Networks.• Design of light Current Systems (Data System, CCTV, Fire alarm systems, Access Door

System).

Professional Experience:

Design & Supervision of low current systems (structure cable, fire alarm, CCTV& Access control )

o Sub contractor: El Shehab for electrical and Contracting Company.

Name : Ali Omar Ali El-atabanyDate of Birth : 1/9/1982

Gander : MaleMilitary Service : ExemptedMarital Status : Married

Nationality : EgyptianDriving License

: Valid

Address : Al-RiyadhPhone/Mobile No. : +966 56 232 7862

+966 54 312 5069

Personal Email :[email protected]

[email protected]

Page 2: Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

o Location : Egypt-Cairoo Period: From November 2007 to may 2008.o Customers: Audi Bank (tow Branches), BNP Paribas (One Branch), Arab Academy for

Science, Technology & Maritime Transport (Alexandria Branch).o Description :

Light Current Systems (Fire Alarm System and CCTV): Designing, Installations and Executions for Audi Bank and BNP Paribas Bank.

CCTV Systems and Access Door System for Arab Academy and Maritime Transport.

Installation and programming the following System :- CCTV (SANYO).- Fire Alarm System (NAPCO, THORN, NOTIFIER).- Access Control System ( KERI system , HID)

Main Responsibilities: Perform Survey In Site for Cable Routes. Preparation and co-ordination of design and/or detail drawings. Preparing material submittal and bill of material. Responsible about the implementation & validation of all design process. Construction Supervision during project Execution.

Fiber Optic Cable OSP,ISP & Low Voltage Networks Site Engineer . .o Sub contractor: Thabthabat for Communications and Contracting Company. o Location : Saudi Arabia , Riadh o Period: From June 2008 to September 2010.o Vendor : THALES (STESA :Saudi Technician Engineering Systems Associated) o Customer: MOBILY and Integrated Telecom Company (ITC).o Project name: Saudi National Fiber Network (SNFN).

Description : MOBILY SNFN Project Ring-5, connections between (RIADH-MAJMAHA-HAFR AL-

BATIN-KHAFJI-JUBAIL-DAMMAM-RIADH) 1000 km FOC Network 96F & 48F Single Mode Fiber.

METRO Project inside cities (KHAFJI, JUBAL&DAMMAM). Construction Supervision of Light Current Systems (Data System, Fire Alarm

System, CCTV and Low Voltage Cables Networks) For Core Center Site of MOBILY Building In (Jubail and Dammam City).

Main Responsibilities : OSP Supervision: Site Work Management, reporting, monitoring. Responsible about Site Survey, Implementation ,Installation ,Splicing ,Testing Like

as (CD: Chromatic Desperation, PMD: Polarization Model Dispersion, and AP: Attenuation Profile. ) and rectification about Long Distance Fiber Optic Cable Network.

Manage the subcontractors &/or team members who assigned to perform any of engineering activities starting form the survey till the as- built phase and Implementation Supervision during the Execution of Project.

Manage the customer approval & validation for all engineering work including the design proposals, AS-BUILT Drawings, Civil Implementation, and Cable Test Result Approval & BOQs.

Responsible about the Invoices of subcontractors and make all reviews in site for approval.

Page 3: Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

Fiber Optic Cable OSP,ISP & L.V Electrical Cables Design Engineer o Sub contractor: Telecomax Group for consulting and Telecommunications.o Location: Egypt, Cairo.o Period: From January 2011 to February 2014.o Vendor: Alcatel-Lucent (Egypt).o Customer I: ETISALAT MISR o Customer II : Thales Group (Multinational Company)o Project name: Etisalat Misr F.O.C Backbone project.

Description: ETISALAT FOC Backbone Phase-2 (CAIRO RING) 170 km FOC. Cairo Branches Project: 150 KM - FOC. METRO Ring Project: Connections and installation 150 km FOC Inside METRO

Stations (Line-1,Line-2,Line-3) . Supervising the Implementation of the fire alarm systems and Data Cables in

METRO Line-3 (From Attaba Station to Abbasia Station).

Main Responsibilities : Responsible about the definition & implementation of the time schedule for all

engineering activities. Responsible about the implementation & validation of all design process (high level,

survey, detailed design, BOQs, handover & follow-up with implementation team, As-Built).

Perform onsite route survey for all cable routes along the network. Perform & issue CAD design maps, layouts & reports. Considering the optimum & cost effective planning methodology (selecting

optimum routes, minimum crossings & best implementation ability). Provide effective & efficient onsite support during project implementation phase to

rollout teams. Prepare & issue the design BOQ (joints, holes, pipes, sub ducts, drums, civil works,

Cables … etc.) Designing of Fiber Optic and copper Cable Networks Responsible about Trenching, Ducting, Cable Laying, Cable Blowing, Manhole /

Hand-hole Constructions, Testing and Commissioning of Fiber Optic and Copper Cables.

Responsible about OFC Records and Management with reference to As built received from External works section. Also to provide necessary OFC route¬ & fiber details to the Maintenance Team in breakdown and other hazard conditions.

Planning and Design of Complete Network (OSP & ISP) for GPON deployment. To Make BOQs/Estimates¬ & Detail Project Plans for the GPON Projects which includes Civil Works, Cable Works, ISP Works and all the Equipment Installations.

Optimization of the Legacy Copper OSP network and also the Migration of the Existing Network to GPON.

Responsible to provide assistance to Fiber Optic Cable Planners in FTTH Deployment from OLT to ONT including survey for Design, joint closure and ODF Installation.

Manage the subcontractors &/or team members who assigned to perform any of engineering activities starting form the survey till the as- built phase.

Manage the customer approval & validation for all engineering work including the design proposals, design variations & BOQs.

Making update for Bill of materials (BOM) after survey & design approval.

Page 4: Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

Providing close supervision, support & management for subcontractors & team members to qualify that executed engineering work are according to contractual specifications, schedule and standards.

Responsible about the supervision in low voltage distributions networks. Prepare periodic follow-up reports to the progress of the work site. Design of the electrical systems in buildings using the design software programs

and draw using AutoCAD Software. Participate in preparing the tender documents of the project including B.O.Q and

specs. Responsible about the design of light current systems (data system, Telephone

system, fire alrm system) Of METRO Project. coordinating project sourcing efforts & related strategic partnerships. Responsible for the timely management of the bidding process: tendering

documents, technical solution, definition of reports, tasks and schedule, escalation of issues for timely decisions, the application of the product and pricing policy.

Electrical Maintenance Engineer o Sub contractor: AL TAIF Company for operation, maintenance and construction.o Location: Riyadh, Saudi Arabia.o Period: From May 2014 Till Now.o Customer : General Presidency For Youth Welfare o Project name: Arabian Institute for Training Youth And Sports Leaders , Riyadh

Main Responsibilities :

Responsible for all the electrical maintenance activities of plant. Designing maintenance strategies, procedures and methods. Planning and scheduling planned and unplanned work. Diagnosing breakdown problems. Controlling maintenance tools, stores and equipment. Monitoring and controlling maintenance costs. Dealing with emergency and unplanned problems and repairs. Writing maintenance strategies to help with installation and commissioning guidelines.

Education :

- University Degree : B.Sc. of Electrical / Electronics engineering

- University : Mansoura University, faculty of engineering

- Graduation year & grade : 2007 ( 62.3 % ).

- Graduated project : wireless data acquisition for monitoring railways application (excellent)

Language :

Arabic : Mother Language.

English : Good [Reading - Writing - Speaking]

Page 5: Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

Computer skills :

Working knowledge of Windows 2000, XP, Vista and Microsoft Office products High Experience in Using AutoCAD. In depth knowledge of TCP/IP, dynamic routing protocols, ISDN, VPN, VOIP. Firewalls, Cisco routers, PIX and switches. CCNA/CCNP. Unix/Linux/ Oracle platforms. Windows mobile applications.

Self Study Topics :

• High Voltage Tension Power Cables Installation.• Microwave: standard, services, equipments• Fiber optics: FTTH, fiber optic data communications, standard and equipments.

Page 6: Plz,get attachment my c.v(ali el-atabany) electrical engineer last update2014

Computer skills :

Working knowledge of Windows 2000, XP, Vista and Microsoft Office products High Experience in Using AutoCAD. In depth knowledge of TCP/IP, dynamic routing protocols, ISDN, VPN, VOIP. Firewalls, Cisco routers, PIX and switches. CCNA/CCNP. Unix/Linux/ Oracle platforms. Windows mobile applications.

Self Study Topics :

• High Voltage Tension Power Cables Installation.• Microwave: standard, services, equipments• Fiber optics: FTTH, fiber optic data communications, standard and equipments.